Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-06-21-6effit6, SCIB, LLC SF Residence with attached garage 1 Eagle Claw Cir., GWS Lot2T0,lronbridge, PH 2, Flg 1 ,2&3 1) ALL WORK SHALL COMply WrrH THE 2015 TNTERNATTONAL RESIDENTIAL CODE (l,R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING TNSPECTTON TO VERIFY 1.5OO PSF SOIL BEARING CAPACITY, PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR TNSPECTOR AT TIME OF FRAME INSPECTION. 7) ENGTNEER OF RECORD SHOWS A SHALLOW FOUNDATION DESTGN, GENERAL CONTRACTOR TO BE AWARE OF GARFIELD COUNTY BUILDING AMENDMENTAS FOLLOWS: 26. Section R403.3 is amended to read as follows: R403.3 Frost protecfetl shalk¡w fuunrlatious. For buildings where the monthly mcan temperature of the building is maintained at a minimum of 64 degree F, footings are not required to extend below the frost line when protected from frost by ìnsulation in accordance with Figure R403.3 (1) and Table R403.3( I ). Foundations prutected from frost in accordance with Figure R403.3(1) and Table R403.3(l) shall not be used for unhsatsd spaËes such as porcheso utility roomsr gaxages and carports, and shall not be attached to basements or ctawl spaces that are not maintaincd at a minimum mean temperature of 64 degree F. Minimum Air Freeze index for Ga¡ficld County for frost protected sh¡llow foundation design is 2,500 F-days. Materials used below grade for the purposo of insulating footings against frost shall be labeled as complying with ASTM C578.