Loading...
HomeMy WebLinkAboutSite Plan59 5 3 5952G GxsaxsaxsaxsaxsaXSA XSA XSA XSA XSA XSA XSA XSA XSA XSAXWLXWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWLXWLXWLXWLXWLXWLXWLXWLXWLXWLXWLMATCH EX:5953.2'± MATCH EX:5953.1'± MATCH EX:5952.9'± MATCH EX:5953.0'± MATCH EX:5953.4'± MATCH EX:5953.1'± FG:5955.09' FG:5955.09' FG:5955.50' ROOF LINE EXISTING WATER SERVICE STUB EXISTING GAS LINE SERVICE STUB EXISTING SEWER SERVICE STUB MAIN LEVEL FFE: 5955.5' BLUE H E R O N D R I V E AS P H A L T P A T H 36.78 42.61 22.19 16.46 32.06 30.00 EASEMENT FOR UTILITIES AND DRAINAGE FG:5955.00' FG:5955.00' FG:5955.00' FG:5955.00' FG:5955.00' GARAGE FFE: 5955.5'2.0%10. 0 % 10. 0 %10.0%10.0%13. 4 % 16. 0 % 11. 3 %5.0%1.1% 2.9% 1.0 %1.1%7.4%5.1%GB:5954.89' GB:5954.91'2.0%2.0%7.7%6.0%0.5%1.0%0.5%>>>>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>595359545955 595 5 595 4 59535 9 5 3 5954 5956 5957 5958 5959 5960 5961 EXISTING DRAINAGE DRY-WELL EXISTING SEWER MANHOLE EXISTING FIRE HYDRANT EXISTING WATER VALVE EXISTING CURB STOP EXISTING ELECTRIC PEDESTAL EXISTING TELEPHONE PEDESTAL EXISTING CATV PEDESTAL EXISTING CONTOUR EXISTING CONTOUR INTERVAL7900 WATER MAINxwlxwl SANITARY SEWER MAIN EXISTING GASXGASXGAS XSA XSA OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 31093.01JOB NO. DATE:07-14-2021 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 DESIGNED BY DRAWN BY CHECKED BY ADD 06/16/21 ADD YTN DATE REVISION C-1.0 DRAWING NO. TITLE G:\2021\31136\CIVIL\CIVIL DWGS\DE\31136 DESIGN.DWG - Jul 14, 2021 - 2:42pmNORTHPROPOSED FULL DEPTH ASPHALT PROPOSED CONCRETE GRADING & EROSION CONTROL PLANLOT 58, IRONBRIDGEGLENWOOD SPRINGS, COLORADOREVIEWPROPOSED LEGEND EXISTING LEGEND 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 010 10 20 10 405 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R 06/16/21 06/22/21 DRAINAGE DIRECTION/SLOPE SPOT ELEVATION EXAMPLE: TOP OF CONCRETE @ 7900.00' = EOA = EDGE OF ASPHALT EX = EXISTING GRADE FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE MATCH EX = MATCH EXISTING TBC = TOP BACK OF CURB XXX:XXX.XX' 2.0% TOC:7900.00' SPOT ELEVATION LEGEND GRADING NOTES: 1.EXISTING CONTOURS ILLUSTRATED HEREIN ARE AT 1 FT INTERVAL PROVIDED BY OTHERS. 2.PROPOSED CONTOURS ARE AT 1 FT INTERVALS. 3.GRADE LANDSCAPE AND HARDSCAPE SURFACES AROUND BUILDING PERIMETER AS NEEDED TO PROVIDE POSITIVE DRAINAGE AWAY FROM EXTERIOR WALLS. SURFACE RUNOFF TO BE DIRECTED TO STORMWATER TREATMENT/DETENTION FACILITIES AS DESCRIBED WITHIN PLANS & ASSOCIATED DRAINAGE STUDY INCLUDED WITHIN BUILDING PERMIT APPLICATION. GRADE TO YARD DRAINS AS FEASIBLE TO MITIGATE DRAINAGE IN LOW OR FLAT AREAS. 4.CONTRACTOR TO VERIFY GRADES ACROSS SITE TO ENSURE THAT THE INSTALLATION OF THE DRAINAGE IMPROVEMENTS ARE IN COMPLIANCE WITH THE INTENT OF THE DESIGN RECOMMENDATIONS ILLUSTRATED HEREIN AND ON THE DRAINAGE PLAN. THE ENGINEER OF RECORD SHOULD BE MADE AWARE OF ANY EXISTING GRADES THAT MAY IMPEDE THE CONSTRUCTION OF THE GRADING AND DRAINAGE IMPROVEMENTS. 5.DOWNSPOUT FOR BUILDING ROOF DRAIN SYSTEM AND TERRACE/PATIO/DECK DRAINS TO BE COORDINATED WITH THE ARCHITECT AND MECHANICAL ENGINEER. 6.AT ALL TIMES DURING CONSTRUCTION AND UNTIL FINAL COMPLETION AND ACCEPTANCE OF THE WORK. THE CONTRACTOR SHALL PREVENT THE FORMATION OF AN AIRBORNE DUST NUISANCE IN SUCH A MANNER THAT IT WILL CONTAIN DUST PARTICLES TO THE IMMEDIATE AREA OF THE WORK. THE CONTRACTOR MUST PERFORM SUCH TREATMENT WITHIN 2 HOURS AFTER NOTIFICATION BY THE CITY THAT AN AIRBORNE DUST NUISANCE EXISTS. 7.THE CONTRACTOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES (BMP's) TO MINIMIZE THE TRANSPORTATION OF SEDIMENT BEYOND THE LIMITS OF DISTURBANCE. 8.THE CONTRACTOR SHALL CONTAIN HIS CONSTRUCTION OPERATIONS TO THE AREA WITHIN THE LIMITS OF DISTURBANCE, THE CONTRACTOR SHALL NOT OPERATE OUTSIDE THIS AREA WITHOUT THE PRIOR CONSENT OF THE PROPERTY OWNER INVOLVED. 9.COMPACTION IN EXCAVATED AREAS SHALL BE 95% STANDARD PROCTOR DENSITY. 10.THE UTILITIES AS SHOWN, MAY NOT REPRESENT ACTUAL FIELD CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT ALL UTILITY COMPANIES FOR FIELD LOCATIONS OF UTILITIES PRIOR TO CONSTRUCTION. 11.ALL SPOT ELEVATIONS AND GRADING CONCEPTS SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. ANY DEVIATIONS SHALL BE COORDINATED WITH THE ENGINEER OF RECORD AND LANDSCAPE ARCHITECT. 12.ALL GEOTECHNICAL RECOMMENDATIONS MUST BE ADHERED TO. PROPOSED SILT FENCESF PROPOSED SEWER CLEANOUT 1.CONTRACTOR MUST UTILIZE "BEST MANAGEMENT PRACTICES" (BMP), TO CONTROL EROSION AND SEDIMENTATION DURING CONSTRUCTION, TO INCLUDE THE INSTALLATION OF INLET PROTECTION AROUND THE NEAREST DOWNSTREAM RECEIVING INLET LOCATED WITHIN THE ROW. 2.CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE OF ALL TEMPORARY EROSION CONTROL MEASURES. 3.DUST CAUSED BY EXCAVATION, TOPSOIL REMOVAL OPERATIONS, OR ROAD BASE PLACEMENT SHALL BE CONTROLLED BY THE CONTRACTOR AT HIS EXPENSE. THE ENGINEER OR CITY MAY REQUIRE THE CONTRACTOR AT ANY TIME TO DISCONTINUE CONSTRUCTION ACTIVITIES UNTIL DUST CONDITIONS ARE REDUCED TO THE COUNTY'S SATISFACTION. 4.MAINTENANCE OF PROPER DRAINAGE AND CLEANING TEMPORARY SEDIMENT CONTAINMENT DURING THE PROGRESS OF THE CONTRACT IS ESSENTIAL. ANY DAMAGE DUE TO IMPROPER MAINTENANCE OF SAID DRAINAGE PRIOR TO FINAL ACCEPTANCE OF THE PROJECT WILL BE THE CONTRACTOR'S RESPONSIBILITY. 5.BMP’S SHALL BE INSTALLED BEFORE ANY EARTH DISTURBING ACTIVITIES COMMENCE. 6.STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES SHALL NOT CAUSE, HAVE THE REASONABLE POTENTIAL TO CAUSE, OR MEASURABLY CONTRIBUTE TO AN EXCEEDANCE OF ANY WATER QUALITY STANDARD. 7.CONSTRUCTION SHALL BE PHASED IN A MANNER TO LIMIT EARTH DISTURBING ACTIVITIES (I.E. THE ENTIRE PROJECT SITE SHOULD NOT BE DISTURBED IF CONSTRUCTION WILL ONLY BE OCCURRING IN ONE PARTICULAR SECTION). 8.SEDIMENT CAUSED BY ACCELERATED SOIL EROSION SHALL BE REMOVED FROM RUNOFF WATER BEFORE IT LEAVES THE CONSTRUCTION SITE. 9.BULK STORAGE STRUCTURES FOR PETROLEUM PRODUCTS AND ANY OTHER CHEMICALS SHALL HAVE SECONDARY CONTAINMENT OR EQUIVALENT PROTECTION TO CONTAIN ALL SPILLS AND PREVENT ANY SPILLED MATERIAL FROM ENTERING STATE WATERS. 10.THE EROSION CONTROL PLAN SHALL BE CONTINUOUSLY UPDATED TO REFLECT NEW OR REVISED BEST MANAGEMENT PRACTICES (BMP’S) DUE TO CHANGES IN DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE OF THE CONSTRUCTION SITE. UPDATES MUST BE MADE WITHIN 72 HOURS FOLLOWING THE CHANGE IN BMP’S. 11.THE CONTRACTOR SHALL INSPECT THE CONSTRUCTION SITE (INCLUDING ALL BMP’S, STORAGE CONTAINERS, AND CONSTRUCTION EQUIPMENT) A MINIMUM OF EVERY 14 CALENDAR DAYS AND WITHIN 24 HOURS AFTER A PRECIPITATION EVENT OR SNOW MELT THAT MAY CAUSE SURFACE EROSION. 12.THE CONTRACTOR SHALL KEEP A RECORD OF ALL INSPECTIONS ON SITE AND AVAILABLE FOR REVIEW BY CITY STAFF. INSPECTION REPORTS MUST IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE WITH THE TERMS AND CONDITIONS OF THE PERMIT. 13.STRAW BALES SHALL NOT BE USED FOR PRIMARY EROSION OR SEDIMENT CONTROL (I.E. STRAW BALES MAY BE USED FOR REINFORCEMENT BEHIND ANOTHER BMP SUCH AS SILT FENCE). 14.BMP’S INTENDED FOR SHEET FLOW SEDIMENT RUNOFF SHALL BE PLACED PARALLEL TO THE SLOPE. 15.ALL BMP’S SHALL BE CLEANED WHEN SEDIMENT LEVELS ACCUMULATE TO HALF THE DESIGN OF THE BMP UNLESS OTHERWISE SPECIFIED. 16.ALL PORTA-POTTY STRUCTURES MUST BE FIRMLY SECURED WITH #4 REBAR ANCHORS OR EQUAL. MUST BE PLACED AWAY FROM FLOW LINES OF STREET, SWALES, RAIN GARDENS & AWAY FROM INLETS. 17.STOCKPILES OF SOIL OR OTHER ERODABLE MATERIALS MUST BE MANAGED SO THAT STORMWATER DOES NOT COME IN CONTACT WITH THE PILE AND POTENTIALLY WASH POLLUTANTS OFFSITE. AT A MINIMUM STOCKPILES SHALL BE ROUTINELY WETTED AND/OR BLANKETED AS WELL AS INCLUDE AN EROSION SOCK PERIMETER BARRIER TO PREVENT WIND EROSION AND SEDIMENT TRANSPORT OFFSITE. STOCKPILES THAT ARE INACTIVE FOR MORE THAN 7 DAYS WILL REQUIRE SOIL BINDER OR HAVE MUCLH/MULCH TACKIFIER APPLIED. 18.EROSION CONTROL BLANKETS SHALL BE INSTALLED ON ALL SLOPES EXCEEDING 3:1. EROSION CONTROL NOTES: PROPOSED SWALE OR DITCH>>>>WLSVCWLSVCWLSVCsasvcsasvcsasvcGASGASGASGASGASGASUELUELUELUELUELUELUELUEL