HomeMy WebLinkAboutApplicationGørfield County
>ul- urZ=qtL{-"1 -t ^r.i 8gf\*- O Hri!.E J >, l¡Jb'.;: ¡¡- 3''"i É,=<=o3
ou
turJ
t¡J
É,
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
19701945-82L2
www.Êa rfield-cou ntv.com
TYPE OF GRADING
tr MAJOR tr MINOR
INVOLVED PARTIES
Property Owner:
Mailing Address:
SCIB, LLC Phone: t979-l 920.3255
0155 Boomerang Road, Suite 52018, Aspen, CO 81611
Emait Addrerr. I uke. gosda@sunriseco.com
contractor:Dockers Construction P¡sn"' 1970 t9873527
Mailing Address:
EmailAddress:dockersconstruction @comcast. net
Archirect: James Woelke Phone
Mailing Address:1002 Old Dutch Mill Road, Colorado Springs, CO 80907
EmailAddress:
High Country Engineer¡ng Phone:945-8676Engineer:
Mailing Address:1517 Blake Avenue Glenwood Springs, CO 81601
EmailAddress:ddennison@hceng.com
PROJECT NAME AND IOCATTON
Project lronbri Residence
Describe Work:Sitework and Foundation Excavation for res¡dence.
Job Address:111 Blue Heron Drive, Glenwood Springs, CO 81601
Assessol's Parcel Number:239501 330058
sub. tRoNBRtDGE PUD, PHASE il, FILING 1 & 2 Lot 58 _Block
Earthwork (square feet):2000 Earthwork (Cubic Yards):250
Att UTILITIES MUST BE TOCATED PRIOR TO ANY GRADING
NOTICE
CERTIFICANON
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submíttals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilit¡es detailed on the submittals reviewed by the
Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (L)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2l'stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or líability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read ând understand the Notice and Cert¡f¡cation above as well as
have provided the requ¡red information which is correct and accurate to the best of my knowledge.
7126121
Property Owner Print and Sign Date
/rr¿"
AuthoriW. This application for a Building Permit must be signed by the Owner of the property, described above, or
anauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe
Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
OFFICIAI USE ONIY ?4 trtoo.oo ce o1/2'8/2ézt á;æ
Special Conditions: .-\2fl-Ðrxcq
D-o, prt *r
n)47
Où#ï:L's fi'szp,nuns,?r*,ol
\,,V- B- L*ul
Permit Fee:
$ro o ,*Misc Fees:Total Feeò:
$lôo.oo
Fees Pald:I ( oo.ôo
Balance due:El Grading Permit:
GRAP - 7 ooJÀ-
lssue Date:Zoning:
PUP
1-]"7,2oL1BUILDING / PLANNING DIVISION :
ed Date
07/28/2021
OPRIS NGINEERING,
06176121
ADD 06/7612t
CHECKEO AY NN 06/22127
DATE:01,74-2021
JoB No. 31093 01
oô
É.
"' o
.-J
Ës
É.ûn-u)o¿.É. É.-cLod'Øtno
FOoo-=z
LUJ(9
=LUt
LIJ
É.
DAIE RÉVISION
IIILE
GRADING &
EROSION CONTROL
PLAN
32.06
;/
q
,&i
MÂrN rEvELf y'5e5s.5
-----1_______
.t
tun
tt'
GRADING NOTES:
1. IXISIIN6 CONIOUS ILLUSTMIÉOHEREINÁREAI 1 FI INIIRVÂLPROVIDEDBYOTHÉS.
2. PROPO5ED CONIOUR5AREAI 1 FIINIERVA6,
GMOÉ úNOsCAPI ÂND HÀRDSGPE SURTACES ÀROUNO AUITDING PTRIMETIR AS NTIOÊD IO PROVIOÉ POSIÌlVT OMINÀGE AWAY ÍROM
ttt€ÂloR watú. suRFÀc€ AUNoFt To BE DtREctÊo lo sfoRMwattR rREÂlMEñl/ÒÉtÊNfroñ ÊÂcrlfitrs as oÊscArBED w[HrN puNs &
ÆSOCiAITD OMINÂGESIUOYiNCTUOEDWTAIN SUITDING P€RMIIAPPUüIION, GMDÉ TOYÀRD DMINSÆ FEÁS¡ALÊ IOMIÍIGAIE OMINÀG€
CONIRACIORIO VERfY 6RÂDES ÁC¡O5S SITÉ IO ENSURE IHÀII¡T INSIATUÌ¡ON OF IHE DMINA6E IMPROVTMINfS ÀR€ IN COMPUÂNCÉ WIIH
IHE INIENÍ OF IH¿ OT5Í6N RECOMMENDÀIIONs ILLUSIRAÍTD HEREIN AND ON TAE DRÀINAGE PUN. IHT ENGINEIR OF RICOÂD SHOUTD AE
MAD€ ÂWARÊ OÊ ANY ¿XJSIINC 6RAOIS IHAI MAY'MÞÊDE THÊ COÑsIRUCIION Of ¡HE GRÀDINC AND ORAINAGE IMPROVTMÉNIS.
5. OOWNSPOUI FOR BUILDING ROOF ORÀIN SYsIEM ÂND ITSMCE/PÂÍIO/DTCK DMINS IO 3Ê COOÂDINAIED WIIH IH€ ÂRCHIIECT AND
MECHANICAIENGINE€R,
6 AIÀTLIIME5DURINGCONsIRUCIIONÀNDUNIILFINAICOMPLEIIONÀNDACCTPIANCEOFTHFWOAK. IHECONIMCIORSHÀTLPÂÉVENÍIHt
FORMATION OF AN AIRBORNE ÐUsI NUISANCE IN SUCH A MÁNNTR IHAI II WILT CONÍAIN DUsI PÀRIICTES IO IHT IMMEDIÀÍT AREÂ OF IH€
WOAK. IHI
'ONIÂÂCTOR
MU5I PERFORM SUCH IRIÁIMENT WÍHIN 2 HOUÂS ÂTIER NOIfìCAIION BY IHÉ CIW IHAI AN AIRAORNE DUSI
7. IHÊ CONIMdOR MUSI IMPLÊMÊNI BI9I MÀNÂGTMENI PÂACIlC€S {AMP!} IO MIN{MIZ€ IHE TÂANSPORIAÍION OF STDIMTNT BTYOND THE
UMIfS CF DISIURAANCE
3. IHÊ CONIMCIORSHÀLTCONfÂIN HISCONSTRUCTION OPTRÀfIONSTOIHÊ ÁRIAWI'HINIHE IMITSOFÔI9IUÂ3ANCÊ, IHE CONfMCfOÂSÍÄTL
NOf OPERÀIE OUIsID¿ IHISÂREAWI'AOUI IHÊ PRIOR CONSENIOF THE PROPÉRW OWNIR INVOLV€D.
9, COMÞACIION IN EXüVAIÉOÀREASSHALT BE95%SIÂNDARDPROCIOÀDIN!IIY
10. lHEUrtrrfúsÂssHowN,MAYNolßÊPAts€NlÀcruÂLÊrÉrDcoNDllloNs- rl15üEREsPoNstBtrrryoFtH€coNtMcToRfocoNractaLL
ul[iÌY coMPÁN tÉs FoR fl€ tD LodltoNs 0t ulLtftES ÞRtoR to coNsTÂucftoN.
1I. ÀTLSPOI ETEVAIIONS AND GRÀD¡NG CONCE'IS5HATLBT F¡ETDVTRIFIEO PRIORIO CONsfRUCTiON. ANY DTVIATIONS 5HÀLL AT COOSOINÀITD
txtsÌlNG sEwERStRVtCEStUB
l
K EROSION CONTROL NOTES
¡..1. CONTRACOR MUsT UTILTZE'8€ST MANAGEMTNT PRAO¡CES" {BMP), rO CONTROL EROS|ON ANO SEDtMENIAT|ON DURTNG
CONSTRUOION, TO INCLUDE THE INSTALLATION OF INLET PROTEqION AROUND THE NEAREST DOWNSTREAM RECEIVING INLËI
LOCATED WIHIN IHE ROW.
2, CONTRAqOR IS RESPONSIELE FOR INSTALUTION AND MAINTENANCE OF ALL TEMPORARY EROSION CONIROL MEÆUÂES.
3. OUST CAUSED BY EXCAVAÍION, ÍOPSOIL REMOVAL OPERATIONS, OR ROAD 8A5E PUCEMENT SHATL BE CONIROLLED BY THE
CONIRAfrOR AT HIS EXPENSË. IH€ ENGINEER OR CIN MAY 8IQUIRE IHE CONIRACIOR AI ANY TIME TO OISCONIINUE
CONSTRUfrION AOIVITIES UNTIL DUSTCONDITIONSARE REDUCEO TOTHE COUNT'SSATISFAfrION.
4, MAiNTENANCE OF PROPER DRAINA6E ANO CLEANING IEMPORARY SEDIMENT CONTAINMENT OURING THE PROGRESS OF THE
CONTRAfr IS ESSENTIAL, ANY DAMAGE DUE TO IMPROPER MAINTENANC€ OF SAID DRAINAGE PRIOR IO fINAL ACCEPTANCE OF
ÎH€ PRO]EÍ WLL 8E ÌHE CONIRAIOR'S RESPONSISILIfl .
.4,.5. BMP'S SHALL S€ INSIALLED BE'ORE ANY EARIH OISfURBING AIIVIfIES COMMENC€,
þ
6. íORMWATER DISCHARGES FROM CONSTRUflION AqIVITIES SHALL NOT CAUsE, HAVE THE REÆONABLE POTENIIAL TO CAUSE,
OR MEÆURABLY CONTRIBUTE TO AN EXCEEÐANCE OF ANY WATER QUAUflSTANOARD.
7. CONSÌRUÍrON SHALL 8E PHÆED tN A MANNER TO UMtT EARTH O|STURS|NC AOtVrlE5 (t.E. TH€ ENlRE pROrEq 5[Ë SHOULO
NOT BE DTSIURBÉD rF CONSIRUfrTON WILL ONLY BË OCCURRING rN ONE PARTTCUUR SECT|ONl.
8. SED¡MENI CAUSED BY ACCELERAIEO SOIL €ROSION SHALL BE REMOVED FROM RUNOFF WAIER SEFORE II LEAVES THE
CONSTßUfrìON SìTE.
9, SULK STORAGE STRUIURES FOR PETROLEUM PROOUCTS AND ANY OTHER CHEMICAL5 SHALL HAVE SECONDARY CONTAINMENT
OR EQUIVALENf PROTEÕION TO CONÍAIN ALLSPILLSAND PREV€NTANYSPILLED MATERIAL FROM €NIERINGSTAIE WAIERS,
10. THEEROSIONCONTROLPUNSHALLBECONTINUOUSLYUPOAIEDTOREFLECINEWORREVISEDSESTMANAGEMENIPRACTÍCES
(BMP's) DUE IO CHANGES IN DESIGN, CONSTRUqION, OPERAIION, OR MAINIENANCE OF THE CONSTRUfrION SITE, UPDATES
MUS] 8E MAOE WIIHIN 72 HOUR5 FOLLOWINGTHE CHANGE IN BMP'S,
11, IHECONTSAfiORSHALLINsPECTTHECONSTRUÚIONSITE{INCLUDINGALLBMP'S,STORAGECONTAINERS,ANDCONÍRUOION
EQUIPMENI) A MIN¡MUM OF EVERY 14 CALENDAR DAYS ANO WITHIN 24 HOURS AFTER A PRECIPITATION EVENI OR SNOW MELT
THAI MAY CAUsE SURfACE ERO5ION.
lar-r
12, IHE CONTRAfrOR SHALL KÊEP A RECORO OF ALL INSPECIIONS ON SIIE AND AVAIUSLE FOR REVIEW BY CIñ STAFF. INSPEqION
REPORIS MUST IDENTIFV ANY INCIDENIS OF NON.COMPL{ANCE WIH THEIERM5 AND CONDIIIONS OF IHE PERMII
13. STRAW SALES SHALL NOT BE USEO FOR PRIMARY EROSION OR SEDIMENT CONTROL {I.E. STRAW 6ALES MAY BË USED FOR
REINFORCEMENT BEHIND ANOIHER 8MP SUCH AS SILI FENCE),
14. BMP'SINIENDEDFORSHEEIFLOWSEO!MENIRUNOFFSHALLBEPLACEDPARALLELTOIHESIÔPE
15, ALL 8MP'S SHALI 8E CLEANED WHEN SEDIMENT LEVE6 ACCUMULATE TO HALF THE DESIGN OF THE BMP UNLESS OTHERWJSE
SPECIFIED.
16, ALL POSTA.PON sTRUflUREs MUST BE FISMLY SECUREO WTH g REBAfi ANCHORS OR EQUAL. MUÍ BE PUCED AWAY FROM
FLOW LINES OF SfREET, SWALES, RAIN GAROENS & AWAY FROM INLEÍS,
17. STOCKPILESOFSOILOROTHERERODABLEMATERIALSMUSTAEMANAGEDsOIHATSIOÂMWAIEROOESNOICOMEINCONTACI
WI'H IHE PILE ANO POIENIIALLY WÆH POLLUIANTS OFFSITE. AT A MINIMUM STOCKP¡TEs SHALL BE ROUTINELY WEDEÐ
ANO/OR BSNKETED Æ WELL Æ INCLUOE AN ERO5ION SOCK PERIM€TER EARRIER IO PREVENT W¡NO ERO5ION ANO SEDIMENT
TRANSPORT OFFSIfE. STOCKPILES THAT ARE INAfrIVE FOÂ MORE IHAN 7 DAYS WILL REQUIRE SOIL BINDEÂ OR HAVE
MUCLH/MULCH TACKIFIER APPLIEO.
ta. EROSION CONIROLBUNKEÍSSHALLBEINSIATLED ON ALLSLOPESEXCEEDING3:1.
EXISTING LEGEND SPOT ELEVATION LEGEND
t_tOA = EOGE oF NPHALT
EX = EXlSllNG GRADE
FFE = FINISHED FLOOR EIEVATION
FG =FINISHED GRADE
MATCH EX = MATCH EXISTING
TBC =ToP BÂCK oF CURB
DMINAGE DIRECTION/5LOPE
TXI5IING DRÀINAGE DRYWFLL
TXI5IING 5EWERMANHOTE
?
'.:l
.ìj
E-
a
SPOT ELEVATION v'
EXAMPLET TOP OF CONCREIE @
79æ.æ'={-1ort1eæ.N
EXISTING ÉLECIfl IC PEDESIÁL
PROPOSED LEGEND
-
PROPOSÊD5trÍFENC€
GRAPHIC SCATE
Know whats below.
Câll before you ois.
I rN FrET )
1 inch = 10 fr.
PROPOSE D SEWI R CTIANOÙI
DRÀWING NO,
c-1.0