Loading...
HomeMy WebLinkAboutApplicationGørfield County >ul- urZ=qtL{-"1 -t ^r.i 8gf\*- O Hri!.E J >, l¡Jb'.;: ¡¡- 3''"i É,=<=o3 ou turJ t¡J É, Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 19701945-82L2 www.Êa rfield-cou ntv.com TYPE OF GRADING tr MAJOR tr MINOR INVOLVED PARTIES Property Owner: Mailing Address: SCIB, LLC Phone: t979-l 920.3255 0155 Boomerang Road, Suite 52018, Aspen, CO 81611 Emait Addrerr. I uke. gosda@sunriseco.com contractor:Dockers Construction P¡sn"' 1970 t9873527 Mailing Address: EmailAddress:dockersconstruction @comcast. net Archirect: James Woelke Phone Mailing Address:1002 Old Dutch Mill Road, Colorado Springs, CO 80907 EmailAddress: High Country Engineer¡ng Phone:945-8676Engineer: Mailing Address:1517 Blake Avenue Glenwood Springs, CO 81601 EmailAddress:ddennison@hceng.com PROJECT NAME AND IOCATTON Project lronbri Residence Describe Work:Sitework and Foundation Excavation for res¡dence. Job Address:111 Blue Heron Drive, Glenwood Springs, CO 81601 Assessol's Parcel Number:239501 330058 sub. tRoNBRtDGE PUD, PHASE il, FILING 1 & 2 Lot 58 _Block Earthwork (square feet):2000 Earthwork (Cubic Yards):250 Att UTILITIES MUST BE TOCATED PRIOR TO ANY GRADING NOTICE CERTIFICANON I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submíttals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilit¡es detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (L) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2l'stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or líability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read ând understand the Notice and Cert¡f¡cation above as well as have provided the requ¡red information which is correct and accurate to the best of my knowledge. 7126121 Property Owner Print and Sign Date /rr¿" AuthoriW. This application for a Building Permit must be signed by the Owner of the property, described above, or anauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. OFFICIAI USE ONIY ?4 trtoo.oo ce o1/2'8/2ézt á;æ Special Conditions: .-\2fl-Ðrxcq D-o, prt *r n)47 Où#ï:L's fi'szp,nuns,?r*,ol \,,V- B- L*ul Permit Fee: $ro o ,*Misc Fees:Total Feeò: $lôo.oo Fees Pald:I ( oo.ôo Balance due:El Grading Permit: GRAP - 7 ooJÀ- lssue Date:Zoning: PUP 1-]"7,2oL1BUILDING / PLANNING DIVISION : ed Date 07/28/2021 OPRIS NGINEERING, 06176121 ADD 06/7612t CHECKEO AY NN 06/22127 DATE:01,74-2021 JoB No. 31093 01 oô É. "' o .-J Ës É.ûn-u)o¿.É. É.-cLod'Øtno FOoo-=z LUJ(9 =LUt LIJ É. DAIE RÉVISION IIILE GRADING & EROSION CONTROL PLAN 32.06 ;/ q ,&i MÂrN rEvELf y'5e5s.5 -----1_______ .t tun tt' GRADING NOTES: 1. IXISIIN6 CONIOUS ILLUSTMIÉOHEREINÁREAI 1 FI INIIRVÂLPROVIDEDBYOTHÉS. 2. PROPO5ED CONIOUR5AREAI 1 FIINIERVA6, GMOÉ úNOsCAPI ÂND HÀRDSGPE SURTACES ÀROUNO AUITDING PTRIMETIR AS NTIOÊD IO PROVIOÉ POSIÌlVT OMINÀGE AWAY ÍROM ttt€ÂloR watú. suRFÀc€ AUNoFt To BE DtREctÊo lo sfoRMwattR rREÂlMEñl/ÒÉtÊNfroñ ÊÂcrlfitrs as oÊscArBED w[HrN puNs & ÆSOCiAITD OMINÂGESIUOYiNCTUOEDWTAIN SUITDING P€RMIIAPPUüIION, GMDÉ TOYÀRD DMINSÆ FEÁS¡ALÊ IOMIÍIGAIE OMINÀG€ CONIRACIORIO VERfY 6RÂDES ÁC¡O5S SITÉ IO ENSURE IHÀII¡T INSIATUÌ¡ON OF IHE DMINA6E IMPROVTMINfS ÀR€ IN COMPUÂNCÉ WIIH IHE INIENÍ OF IH¿ OT5Í6N RECOMMENDÀIIONs ILLUSIRAÍTD HEREIN AND ON TAE DRÀINAGE PUN. IHT ENGINEIR OF RICOÂD SHOUTD AE MAD€ ÂWARÊ OÊ ANY ¿XJSIINC 6RAOIS IHAI MAY'MÞÊDE THÊ COÑsIRUCIION Of ¡HE GRÀDINC AND ORAINAGE IMPROVTMÉNIS. 5. OOWNSPOUI FOR BUILDING ROOF ORÀIN SYsIEM ÂND ITSMCE/PÂÍIO/DTCK DMINS IO 3Ê COOÂDINAIED WIIH IH€ ÂRCHIIECT AND MECHANICAIENGINE€R, 6 AIÀTLIIME5DURINGCONsIRUCIIONÀNDUNIILFINAICOMPLEIIONÀNDACCTPIANCEOFTHFWOAK. IHECONIMCIORSHÀTLPÂÉVENÍIHt FORMATION OF AN AIRBORNE ÐUsI NUISANCE IN SUCH A MÁNNTR IHAI II WILT CONÍAIN DUsI PÀRIICTES IO IHT IMMEDIÀÍT ARE OF IH€ WOAK. IHI 'ONIÂÂCTOR MU5I PERFORM SUCH IRIÁIMENT WÍHIN 2 HOUÂS ÂTIER NOIfìCAIION BY IHÉ CIW IHAI AN AIRAORNE DUSI 7. IHÊ CONIMdOR MUSI IMPLÊMÊNI BI9I MÀNÂGTMENI PÂACIlC€S {AMP!} IO MIN{MIZ€ IHE TÂANSPORIAÍION OF STDIMTNT BTYOND THE UMIfS CF DISIURAANCE 3. IHÊ CONIMCIORSHÀLTCONfÂIN HISCONSTRUCTION OPTRÀfIONSTOIHÊ ÁRIAWI'HINIHE IMITSOFÔI9IUÂ3ANCÊ, IHE CONfMCfOÂSÍÄTL NOf OPERÀIE OUIsID¿ IHISÂREAWI'AOUI IHÊ PRIOR CONSENIOF THE PROPÉRW OWNIR INVOLV€D. 9, COMÞACIION IN EXüVAIÉOÀREASSHALT BE95%SIÂNDARDPROCIOÀDIN!IIY 10. lHEUrtrrfúsÂssHowN,MAYNolßÊPAts€NlÀcruÂLÊrÉrDcoNDllloNs- rl15üEREsPoNstBtrrryoFtH€coNtMcToRfocoNractaLL ul[iÌY coMPÁN tÉs FoR fl€ tD LodltoNs 0t ulLtftES ÞRtoR to coNsTÂucftoN. 1I. ÀTLSPOI ETEVAIIONS AND GRÀD¡NG CONCE'IS5HATLBT F¡ETDVTRIFIEO PRIORIO CONsfRUCTiON. ANY DTVIATIONS 5HÀLL AT COOSOINÀITD txtsÌlNG sEwERStRVtCEStUB l K EROSION CONTROL NOTES ¡..1. CONTRACOR MUsT UTILTZE'8€ST MANAGEMTNT PRAO¡CES" {BMP), rO CONTROL EROS|ON ANO SEDtMENIAT|ON DURTNG CONSTRUOION, TO INCLUDE THE INSTALLATION OF INLET PROTEqION AROUND THE NEAREST DOWNSTREAM RECEIVING INLËI LOCATED WIHIN IHE ROW. 2, CONTRAqOR IS RESPONSIELE FOR INSTALUTION AND MAINTENANCE OF ALL TEMPORARY EROSION CONIROL MEÆUÂES. 3. OUST CAUSED BY EXCAVAÍION, ÍOPSOIL REMOVAL OPERATIONS, OR ROAD 8A5E PUCEMENT SHATL BE CONIROLLED BY THE CONIRAfrOR AT HIS EXPENSË. IH€ ENGINEER OR CIN MAY 8IQUIRE IHE CONIRACIOR AI ANY TIME TO OISCONIINUE CONSTRUfrION AOIVITIES UNTIL DUSTCONDITIONSARE REDUCEO TOTHE COUNT'SSATISFAfrION. 4, MAiNTENANCE OF PROPER DRAINA6E ANO CLEANING IEMPORARY SEDIMENT CONTAINMENT OURING THE PROGRESS OF THE CONTRAfr IS ESSENTIAL, ANY DAMAGE DUE TO IMPROPER MAINTENANC€ OF SAID DRAINAGE PRIOR IO fINAL ACCEPTANCE OF ÎH€ PRO]EÍ WLL 8E ÌHE CONIRAIOR'S RESPONSISILIfl . .4,.5. BMP'S SHALL S€ INSIALLED BE'ORE ANY EARIH OISfURBING AIIVIfIES COMMENC€, þ 6. íORMWATER DISCHARGES FROM CONSTRUflION AqIVITIES SHALL NOT CAUsE, HAVE THE REÆONABLE POTENIIAL TO CAUSE, OR MEÆURABLY CONTRIBUTE TO AN EXCEEÐANCE OF ANY WATER QUAUflSTANOARD. 7. CONSÌRUÍrON SHALL 8E PHÆED tN A MANNER TO UMtT EARTH O|STURS|NC AOtVrlE5 (t.E. TH€ ENlRE pROrEq 5[Ë SHOULO NOT BE DTSIURBÉD rF CONSIRUfrTON WILL ONLY BË OCCURRING rN ONE PARTTCUUR SECT|ONl. 8. SED¡MENI CAUSED BY ACCELERAIEO SOIL €ROSION SHALL BE REMOVED FROM RUNOFF WAIER SEFORE II LEAVES THE CONSTßUfrìON SìTE. 9, SULK STORAGE STRUIURES FOR PETROLEUM PROOUCTS AND ANY OTHER CHEMICAL5 SHALL HAVE SECONDARY CONTAINMENT OR EQUIVALENf PROTEÕION TO CONÍAIN ALLSPILLSAND PREV€NTANYSPILLED MATERIAL FROM €NIERINGSTAIE WAIERS, 10. THEEROSIONCONTROLPUNSHALLBECONTINUOUSLYUPOAIEDTOREFLECINEWORREVISEDSESTMANAGEMENIPRACTÍCES (BMP's) DUE IO CHANGES IN DESIGN, CONSTRUqION, OPERAIION, OR MAINIENANCE OF THE CONSTRUfrION SITE, UPDATES MUS] 8E MAOE WIIHIN 72 HOUR5 FOLLOWINGTHE CHANGE IN BMP'S, 11, IHECONTSAfiORSHALLINsPECTTHECONSTRUÚIONSITE{INCLUDINGALLBMP'S,STORAGECONTAINERS,ANDCONÍRUOION EQUIPMENI) A MIN¡MUM OF EVERY 14 CALENDAR DAYS ANO WITHIN 24 HOURS AFTER A PRECIPITATION EVENI OR SNOW MELT THAI MAY CAUsE SURfACE ERO5ION. lar-r 12, IHE CONTRAfrOR SHALL KÊEP A RECORO OF ALL INSPECIIONS ON SIIE AND AVAIUSLE FOR REVIEW BY CIñ STAFF. INSPEqION REPORIS MUST IDENTIFV ANY INCIDENIS OF NON.COMPL{ANCE WIH THEIERM5 AND CONDIIIONS OF IHE PERMII 13. STRAW SALES SHALL NOT BE USEO FOR PRIMARY EROSION OR SEDIMENT CONTROL {I.E. STRAW 6ALES MAY BË USED FOR REINFORCEMENT BEHIND ANOIHER 8MP SUCH AS SILI FENCE), 14. BMP'SINIENDEDFORSHEEIFLOWSEO!MENIRUNOFFSHALLBEPLACEDPARALLELTOIHESIÔPE 15, ALL 8MP'S SHALI 8E CLEANED WHEN SEDIMENT LEVE6 ACCUMULATE TO HALF THE DESIGN OF THE BMP UNLESS OTHERWJSE SPECIFIED. 16, ALL POSTA.PON sTRUflUREs MUST BE FISMLY SECUREO WTH g REBAfi ANCHORS OR EQUAL. MUÍ BE PUCED AWAY FROM FLOW LINES OF SfREET, SWALES, RAIN GAROENS & AWAY FROM INLEÍS, 17. STOCKPILESOFSOILOROTHERERODABLEMATERIALSMUSTAEMANAGEDsOIHATSIOÂMWAIEROOESNOICOMEINCONTACI WI'H IHE PILE ANO POIENIIALLY WÆH POLLUIANTS OFFSITE. AT A MINIMUM STOCKP¡TEs SHALL BE ROUTINELY WEDEÐ ANO/OR BSNKETED Æ WELL Æ INCLUOE AN ERO5ION SOCK PERIM€TER EARRIER IO PREVENT W¡NO ERO5ION ANO SEDIMENT TRANSPORT OFFSIfE. STOCKPILES THAT ARE INAfrIVE FO MORE IHAN 7 DAYS WILL REQUIRE SOIL BINDE OR HAVE MUCLH/MULCH TACKIFIER APPLIEO. ta. EROSION CONIROLBUNKEÍSSHALLBEINSIATLED ON ALLSLOPESEXCEEDING3:1. EXISTING LEGEND SPOT ELEVATION LEGEND t_tOA = EOGE oF NPHALT EX = EXlSllNG GRADE FFE = FINISHED FLOOR EIEVATION FG =FINISHED GRADE MATCH EX = MATCH EXISTING TBC =ToP BÂCK oF CURB DMINAGE DIRECTION/5LOPE TXI5IING DRÀINAGE DRYWFLL TXI5IING 5EWERMANHOTE ? '.:l .ìj E- a SPOT ELEVATION v' EXAMPLET TOP OF CONCREIE @ 79æ.æ'={-1ort1eæ.N EXISTING ÉLECIfl IC PEDESIÁL PROPOSED LEGEND - PROPOSÊD5trÍFENC€ GRAPHIC SCATE Know whats below. Câll before you ois. I rN FrET ) 1 inch = 10 fr. PROPOSE D SEWI R CTIANOÙI DRÀWING NO, c-1.0