Loading...
HomeMy WebLinkAboutCorrespondence Regarding Additional Info NeededColleen W¡tth From: Sent: To: Cc: Subject: Hi Max, Your response on behalf of the copies of the two PDF attachm permit BLRE-06-2L-6945? ft-) V,.,-i i,:¡r''¡¿r,J*cl thii nt;rr;:ge ':rr ¡-,1f?'Jllil !';1-i 'l'l Colleen Wirlh Thursday, )uly 29,2021 10:26 AM Max Filiss deric@bu-inc.com; Glenn Haftmann; Andy Schwaller; nate.simmons@backbonemedia.net;jim.dougragerarchitect@gmail.com; Ernest Kollar RE: [External] Re: Nathan Fritz & Karyn Simmons new build project SIMMONS property ís much appreciated. Could someone please deliver (2)full size hard ents to the Community Development Dept front desk, ATTN: COLLEËN WIRTH, SIMMONS1-30-Zl reætied+"lt eiæ 5#4- en glund L!.-Lai'aut1.Pdf 1.1 I I't ¿il'ilÏ Ê -C i'.'il 5et-*7Z7l1,pclf -{ i lÉ!jtwld,lo ø)oFFtce WY 1 NE Unfortunately, I don,t have ready access to the required full size document printer and want to ensure the copies we have for the record are 'to scale' Thanks, Colleen Wirth Plans Examiner Garfield County Buildíng Division 108 8th Street, Suite 401 Glenwood Springs, CO 81601 cwirth sarfield-cou .com office (970) 945-1377 ext. 1610 From: Max Filiss <max@dividecreekbuilders.com> Sent: Thursday, July 29,202L 7:38 AM To : Col I een Wi rth <cwi rth @ garf i el d-cou nty. com> Cc: deric@bu-inc.com; Glenn Hartmann <ghartmann@garfield-county.com>; Andy Schwaller <aschwaller@garfield- county.com>; nate.simmons@backbonemedía.net; max@dividecreekbuilders.com; jim.dougragerarchitect@gmail.com; Ernest Kollar <erniekollar@gmail'com> subject: [External] Re: Nathan Frítz & Karyn simmons new build project Colleen Sorry for the delayed response, trying to make sure we have everything correctly coordínated' Please see attactted "gFF "t a updated survey with specifics of floodplain analysis according to your accepted parameters updated civil drawings with adjusted boulder walls To confirm, we intend NO work within the floodplain and are content to give up the trail, etc that were drawn in the floodplain area, Secondly, we ere still finalizing the budget. As we do this, it may or may not bccomc ncccssary to dclctc or dclay thc pool and the stone sitting wall surrounding the back patio area. Thus, I wanted to have you confirm my understandings of these items in respect to the County's needs: The short stone seating wall does not need permitting and thus could be added at a later date than the house construction without repermitting, as long as we stay within the envelope and out of the floodplain, correct? lf the pool is not built, thus allowing our grading to be simplified and omitting the necessity of the boulder retainage........ I am correct in assuming that if we keep all grading within the envelope and outside of the floodplain, the county would not require the boulder wall, correct? Thanks, and please let us know if there is anything further that ís neecled. ln closing, we plan NO work in the floodplain and realize that if any is required by the client in the future that separate permitting would be needed. Max On Thu, Jul22,2A2l at 11:28 AM Colleen Wirth <cwirth@earfield-countv.com> wrote Referenee BLRË-06-2 1-6945 S/F dwelling at 16661 Hwy 82, Engiur*d / Moare Subdlvision, l-ot 2 Message for Deric, Boundaríes Unlimited, From your site plan it appears portíon of the construction of various retainíng walls and a path below the proposed structure are in the floodplain. Please provide us with verifícatíon that this work in the floodplain will not cause a change in the floodplain. Also, a portion of the structure itself come very close to the floodplain. Please provide elevations of the fíníshed floor to verify floodplain provisions have been addressed. Thanks I have included CC: owner and rest of the project team so they are abreast of permit status UNDER REVIEW. Also is a courtesy CC: to Glenn Hartmann Senior Planner / Floodplain Manager and Andy Schwaller Chief Building Official. a a 2 Look forward to hearing your response when convenient' Colleen Wirth Plans Examiner Garfíeld County Building Divísion L08 8th Street, Suite 401" Glenwood Springs, CO 81601 cwirth (ô garfíel d-cou ntv. com office (970) 945-1377 ext. 1610 Max Filiss Divide Creek Builders 75 N 2ND ST STE B CARBONDALE CO 81623 MOBTLE-g70-618-7158 oFFrcE-970-963-3555 FAX-970-963-1955 5