Hi Max,
Your response on behalf of the
copies of the two PDF attachm
permit BLRE-06-2L-6945?
ft-) V,.,-i i,:¡r''¡¿r,J*cl thii nt;rr;:ge ':rr ¡-,1f?'Jllil !';1-i 'l'l
Colleen Wirlh
Thursday, )uly 29,2021 10:26 AM
Max Filiss
deric@bu-inc.com; Glenn Haftmann; Andy Schwaller;
nate.simmons@backbonemedia.net;jim.dougragerarchitect@gmail.com; Ernest Kollar
RE: [External] Re: Nathan Fritz & Karyn Simmons new build project
SIMMONS property ís much appreciated. Could someone please deliver (2)full size hard
ents to the Community Development Dept front desk, ATTN: COLLEËN WIRTH, SIMMONS1-30-Zl
reætied+"lt
eiæ 5#4-
en glund L!.-Lai'aut1.Pdf
1.1 I I't
¿il'ilÏ Ê -C i'.'il 5et-*7Z7l1,pclf
-{ i lÉ!jtwld,lo
ø)oFFtce WY
1
NE
Unfortunately, I don,t have ready access to the required full size document printer and want to ensure the copies we
have for the record are 'to scale'
Thanks,
Colleen Wirth
Plans Examiner
Garfield County Buildíng Division
108 8th Street, Suite 401
Glenwood Springs, CO 81601
cwirth sarfield-cou .com
office (970) 945-1377 ext. 1610
From: Max Filiss <max@dividecreekbuilders.com>
Sent: Thursday, July 29,202L 7:38 AM
To : Col I een Wi rth <cwi rth @ garf i el d-cou nty. com>
Cc: deric@bu-inc.com; Glenn Hartmann <ghartmann@garfield-county.com>; Andy Schwaller <aschwaller@garfield-
county.com>; nate.simmons@backbonemedía.net; max@dividecreekbuilders.com; jim.dougragerarchitect@gmail.com;
Ernest Kollar <erniekollar@gmail'com>
subject: [External] Re: Nathan Frítz & Karyn simmons new build project
Colleen
Sorry for the delayed response, trying to make sure we have everything correctly coordínated'
Please see attactted
"gFF "t
a updated survey with specifics of floodplain analysis according to your accepted parameters
updated civil drawings with adjusted boulder walls
To confirm, we intend NO work within the floodplain and are content to give up the trail, etc that were drawn in the
floodplain area,
Secondly, we ere still finalizing the budget. As we do this, it may or may not bccomc ncccssary to dclctc or dclay thc
pool and the stone sitting wall surrounding the back patio area. Thus, I wanted to have you confirm my understandings
of these items in respect to the County's needs:
The short stone seating wall does not need permitting and thus could be added at a later date than the house
construction without repermitting, as long as we stay within the envelope and out of the floodplain, correct?
lf the pool is not built, thus allowing our grading to be simplified and omitting the necessity of the boulder
retainage........ I am correct in assuming that if we keep all grading within the envelope and outside of the
floodplain, the county would not require the boulder wall, correct?
Thanks, and please let us know if there is anything further that ís neecled. ln closing, we plan NO work in the floodplain
and realize that if any is required by the client in the future that separate permitting would be needed.
Max
On Thu, Jul22,2A2l at 11:28 AM Colleen Wirth <cwirth@earfield-countv.com> wrote
Referenee BLRË-06-2 1-6945
S/F dwelling at 16661 Hwy 82,
Engiur*d / Moare Subdlvision, l-ot 2
Message for Deric, Boundaríes Unlimited,
From your site plan it appears portíon of the construction of various retainíng walls and a path below the proposed
structure are in the floodplain. Please provide us with verifícatíon that this work in the floodplain will not cause a
change in the floodplain. Also, a portion of the structure itself come very close to the floodplain. Please provide
elevations of the fíníshed floor to verify floodplain provisions have been addressed.
Thanks
I have included CC: owner and rest of the project team so they are abreast of permit status UNDER REVIEW. Also is a
courtesy CC: to Glenn Hartmann Senior Planner / Floodplain Manager and Andy Schwaller Chief Building Official.
a
a
2
Look forward to hearing your response when convenient'
Colleen Wirth
Plans Examiner
Garfíeld County Building Divísion
L08 8th Street, Suite 401"
Glenwood Springs, CO 81601
cwirth (ô garfíel d-cou ntv. com
office (970) 945-1377 ext. 1610
Max Filiss
Divide Creek Builders
75 N 2ND ST STE B
CARBONDALE CO 81623
MOBTLE-g70-618-7158
oFFrcE-970-963-3555
FAX-970-963-1955