Loading...
HomeMy WebLinkAboutHigh Strength Bolt Inspection Report 04.1.2021THTNDER MOUNTATNI TESTING 2970 N. Ronlin Avenue / Grand Junction, Colorado 81504 Cell (e70) 2t0-7008 / Fax (970) 314-1067 E-Mail: thu ndermountaintesting@gmail.com www.th u nderm ountain testing.com Pioneer Steel lnc. 38246 River Frontage Road New Castle, CO 81647 Allt'N: Mr. Cerald Burk Burk Residence 32 Fenwick Court - Aspen Glen Ga¡field Count¡ CO April 1.2021 Permit #BLRE-08-2A-6427RE Dear Mr. Bwk, As requested, structural steel special inspection was conducted per the IBC 2015 Edition - Chapter l7: Structural Tests and Special lnspection and Garfield Counry requirements. I arrived on-site at l0:30 AM. I met with you to review project requirements and areas ready for inspection. The steel erection company for this project is Pioneer Steel Inc. (PSI) in New Castle, CO. The welding procedure specifications (WPS) and the welder certification test reports (V/QTR) were previously reviewed, and all rvere observed to be acceptable with project requirements. Copies of certifications are on file with Mr. Aaron Lyles with PSl. Visualwelding inspection was conducted from the Foundation Plan to the Roof Framing Plan levels on the field welded beam to column fillet welded connections as required on the approved engineering stamped drawings provided by Rakowski-Millard Structural Design, LLC in Carbondale, CO.: Sheet S2.0 to Só.4 dated 7-28-20.lnspection was conducted at grid lines A -L &. I - 9. Upon completion, I observed all fillet welds ar all levels refereneed to be in compliance with project specifications and Lhe visual inspection requirements as stated in Clause 6 of the AWS Dl .l : Structural Welding Code- Steel:2015 Edition. High strength bolt inspection was conducfed from the Foundation Plan to the Roof Framing Plan levels on the %" ASTM 4325 High Strength beam to beam and beam to column bolted connections as required on Sheet Sl.0: General Requirements -- Steel, Paragraph 4.2. Inspection was conducted at grid lines A -L &,1 - 9. During inspection, I observed a total of 3 each bolts were observed to be unacceptable due to loose or were missing a hardened steel washer under the tuming surface. I brought this to your altention, and you immediately had workers on site with PSI repairing each repair location referenced. upon completion, all bolts inspecled were observed to be in PAGE 2 compliance wilh project specifications and the inspection requiremenls as sfated in Section 9 of the Specification for Structural Joints Using A3ã5 or 4490 Bolts issued by the Research Council on Structural Connections. Ultrasonic shear wave welding inspection was conducted at the Main Level Floor Framing Plan and the Roof Framing Plan on the Complete Joint Penet¡ation (CJp) groove welded connections as required on Sheet 56.3: Details l0 & 15. Please refer io thå - attached "Ultrasonic Weld Inspection" form for weld locations and test results. AWS CWI #9rc40201 ICC Certified #0863569-5l & Sz ASNT NDT Level lll #30242 Thunder Mountain @ ULTR.ASONIG WELD EXAMINATION Client Pioneer Steel lnc. 38246 River Frontase Road New Castle, CO 81647 Poject Burk Residence ililttDrn il0ü$iltfisït8t0 0 2970 N. Ronlin Avenue I Grand Junclion, CO 81S04 cer(e70)21a'7008""ffiIJJÍ;1äl,jåTii;::iff iïrainresrins@smair'c¡m Permif #:BLRE-08.2O{É,27 Report No. 't Page 1 of 1 Technician L. MaxrelllASNT NDT Level lll Time of Examination 10;394U Date 4nnï21 ProcedurelCodelSpec.AWS Dl.1 - 2015 Êdition Acceptance Criteria Clause 6 - Part F Location 32 Fenwick Court -Glen: Gartield Countv. CO. Fabricator Midwesl SteelWorks, lnc. / Lincoln, NE. Wdd ldenlification CJP Groove Weld Weld Joint AWS TC-U4a Quality Requirements - Section No.Clause 6 Remarks B Reviewed: Mâter¡al Thickness Welding Process 31 .875" SMAW +x x DISCONTINUIT DISTANCE =rP 3s-öz ¡m -aìmm<nñl ¡nrzom { ümó2JLci > oz 2p9 3qoız LÊVËL / 6RIO LINË zg c) Jozzo Irz a¡,(]comÐ zoîm 'ï Ðo31 C) r¡¡ Imo A B c D rm o{ eg, t> 3ãã--{mcëaFo¡czo Emø3 n: ä¿im3 ì TÐo3x 1uog Þr96- È8CZ>Ja2ocz1 um3Þ2x(/) Main Levol Floor Framino Plan South of O E 7: Wsst Sid6-T&8 70 A 1&2 11 ACCEPT Soulh of D & 7: East Side-T&B 70 A 1&2 14 ACCEPT Soulh of D t 8; West Side-TIB 70 A 1&2 14 ACCEPT Roof Framinq Plan E & 7.1 - No¡th Side - T &B 70 A 1 &.2 l4 ACCEPT E & 7.9 - Soulh Sida - T &8 70 A I &2 14