HomeMy WebLinkAboutApplicationGurfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
(9701 e4s-8212
www.garfield-cou ntv.com
WPE OF
BUILDING PERMIT
APPLICATION
CommerciaUMulti-Family Demolition
Manufactured Home (Single or Multi-Level)
T ReroofResidential (SF, Duplex or Townhome)
Dwell Unit ) - MAXTMUM S|ZE OF SQUARE FEET
300 Wulfsohn Road, Apt 8313 Glenwood Spring, CO 81601
INVOIVED PARIIÉ'
Donneil HeckerProperty Owner:970 379-2825Phone
Mailing Address:
Email Address:don. hecker@comcast. net
Whit Witaker of WRW Log Works, lnc. p¡on".1970 P74-8412
1009 Cattle Creek Ridge Road, Carbondale, CO 81623
Contractor:
Email Address:wrw3@hotmail.com
Mailing Address:
960 Clubhouse Dr¡ve, New Castle, CO 81647
Architect: Patrick Stuckey Architects
Mailing Address:
Email Address:stucarch@comcast.net
pnone, r97o pB4-9220
1971 Westl2th Avenue, Denver, CO 80204
Email Address:
825-0777 ext 5015303Phone:Engineer:Justin Dolezal CTl-Thompson
Mailing Address:
Email Address:idolezal @ctlthom pson. com
Phone: I )
Mailing Address:
Manufactured Home lnrtrll"rr N/A
PROJECTDETAIT.S
Describe Work:New Construction Single Family Residence
Job Address:flg 5 Lot 3 131 River Glen Road, Carbondale, CO 81623
Assessor's parcet Number. 23931 9104003
,16. Aspen Glen
Owne/s Valuation of Work:1,200000
Sq. Ft. of Building:
Class of Work:
rot 3 r¡o.¡ flg 5
Property Size (Sq. Ft. or Acres):
25'.# of Floors 2
Addition
Garage:
4309
ed
Height:
Alteration
Detached
.51
PRO'ECT DETAII.S CONTINUED
Community
Electric
1
ll
Septic:
j Type ofHeat:
I¡- -.-- --..-Driveway
Permit:
Natural Gas Propane Other
NOTICE
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Vo¡d Permit. A Building Permit becomes null and void if the work authorized is not commenced within 1-80 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERNFICANON
I hereby certifythat I have read this Application and thatthe information contained above is true and correct. I
understand that the Buildíng Division accepts the Applicat¡on, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon not¡ce from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Build¡ng Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (21stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not const¡tute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
have
provided the required information which is correct and to the best of my
perty Owner Print and Sign Date
I
Permit #:
(r#
ç7
Plan Check Fee:i Wrl,ei.t{1"
Feifs Paid:
ç tfi12?L
oFF¡clAL usE oNtY p¿, .à trq1, Z,a'¿ cß {f I I ?ot/zslz.oz-t é;æ
':;;;it;'ä"'i*"ite,l ún co,npi ían æ d bw lÅ i nq wvel ore hù
M6nu. Home Fee: J
¡t/t+
Misc. Fees:' -<
BterevDTL,Tæ.
BP No:
9uf1ê-7o61
OWTS Ño:
Co i/\F/\u N rlt
'*0"ÉhP OCC Group:
I¿.L
Const. Type:
tfLC
Zoning:P\'D
4-z-zpz-l
Dete
BUTTDTNG / PIANNING DlvlSlON
Signed Approval
Garfteld Coanty
BUILDING DEPARTMENT
7o8 Eighth Street, Su¡te 401, Glenwood Springs, CO 8L607
Tel: (970) 945-8212
PLA NRE VI E W CHECK L IST
0t-RE-0Ø-A*7ablPermit No:
Building lssues Planning lZoninglssues ?
t/
r/
N+
t/
r/
N A
,a
t/
t'/
/
Q-woJ-ïe
Engineered Foundation
Driveway Permit 4e,ffl|VlÞì-'
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ TopograPhY 30%
Attach Residential Plan Review List
Subdivision Plat Notes
f ,\lÞ
c¿Nl'
e./
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
Building Height
Zoning Sign-Off
Road lmpact Fees
Grade/ Topography 40%
Planning lssues
Subdivision Plat
l/
t/I/
l/
Fire Department Revigw
< tezcÐF
Valuation Determinalion/ Fees
Parcel/ Schedule No'
NÊ-40# Snowload Letter - Manu' Hom
Soils Report rn
3o úpt{L6 swneal
Red Line Plans/ StamPs/ Sticker
Attach Conditions
Application Signed
Plan Reviewer to Sign APPlication
f€ÆPh's?, Õ254q1
Descri n & Summa
îqq Y 3L=
¿ll, * 3L =
4t+* lg cr
cralrtl 2385 x 16 = 42,)qó0,40
FLS æb4 Y hl,bt a 251,Uá,52
u' caûr
"4J¿o¡+-,3^rcge)
2ßt7wot
t)172,þ0
qlz Å 'Plà 77 452,@
1o sæ CTL
terh
Vq
n$"r ødiu.ded b"itWon,t 33lrrtl5,6L
(-n" qeÆ
svárti tleà)
RIF (e,8,Þ) #z,lo31o
a Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.a
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold untilthe required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will þe considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand
checklist.
abide by the requirements of this
Property er and Sign Date