Brian Kurlz < kuftzengineer@yahoo.com >
Wednesday, September 8,2021 5:41 AM
Colleen Wirlh
Fw: lExternal] BLRE-07-20-6411: ADU at 4
HiColleen,
My e-mail to Dave Argo just came back undelivered (for obvious reasons)
I was not aware that Dave was no longer with Garfield Cty.
See not below
Brian Kurtz, P.E.
Kuttz & Associates, lnc.
Structural Engineers
{970)-945-6305
--- Fon¡varded Message -----
From : Brian Kurtz <kuftzengineer@yahoo.com>
To: Aaron Natoniewski <aaronnski@hotmail.com>; Dave Argo <dargo@garfield-county.com>
Sent: Wednesday, September 8,2021,05:28:28 AM MDT
Subject: Re: BLRE-07-2A-6411 : ADU at 4972 Cty Rd 113
Good morn gentlemen,
Thanks for your patience
I made a complete review of the foundation design this morn.
Dave, I am sure you noticed that our construction documents were issued 4 weeks prior to the soils report issue date.
I never make the 'assumptions'when designing for'assumed conditions.' Those assumed soils properties come from the
geotechnical engineer.
At any rate, after a close look, there are no changes necessary to the foundation design: it is in conformance with the
dual bearing properties as recommended by H-P/Kumar in their report no. 20-7-414 (dated A7-28-20).
Brian Kurtz, P.E.
Kurtz & Associates, lnc.
Structural Engineers
(970)-e45-6305
On Monday, August 30,2021,03:39:14 PM MDT, Aaron Natoniewskicaaronnski@hotmail.com> wrote
Does project 20-08 sound right, I see that on plans.
1
Sent from Mail for Windows
From: Brian Kurtz
Sent: Monday, August 30,20213:35 PM
To; Aaron Natoniewski
Subject: Re: BLRE-O7 -2A-ç41 1
HiAaron,
What is our job number?
Brian Kurtz
Kurtz & Associates, lnc.
Structural Engineers
(970)-e45-6305
On Monday, August 34,2021, 09:10:47 AM MDT, Aaron Natoniewski <aaronnski@hotmail.com> wrote:
I apologize for the time between your work and this county permitting process, I thought I would forward this to you to ask
the questiorr tlirectly (fr<lnt colleen). The project is a|4972 oounty road 113. Natoniewski. I can calldan, or if you would
prefer to speak with him directly, that's also fine. The excavation is now open for footers and compacted as
preparatory....and I just noticed the cc. -Aaron
Sent from Mail for Windows
From: Colleen Wirth
Sent: Monday, August 34,2021 8:24 AM
To : aaron nski@ hotmail. com; ku rtzenq ineer@ya hoo. com
Gc: Andy Schwaller
Subject: BLRE-07-20-641 1
2
Message for Aaron Natoniewski and Brian Kurtz:
RE: BLRE-07-20-6411 - Natoniewsk¡ ADU at4972 CR 113, Carbondale
- pending application commenced by prior plans examiner Dave Argo
Thanks Aaron for Friday's voice mail message. I am reviewing your geotechnical engineers report (K+A project 2A-7-414
and observation of recent excavation dated August24,2A2l. I notice Daniel Hardin states recommended for an
allowable bearing pressure of 1 ,500 psf (or 2,000 psf for footings wider than 3 feet). Sheet S-1 , general structural notes
dated 6/3012020 from Brian Kurtz names an assumed soil bearing capacity names an assumed soil bearing capacity at
2,000 psf. Sheet S2 Footing widths appear variable along the four faces of the detached garage / ADU..... from 28
inches along two faces of the building to those exceeding 3 feet. I am emailing now to verify and confirm the Kurtz &
Associates structural engineer is still comfortable with the designed soil bearing and expresses no need to amend the
original footing widths?
I am striving to avoid confusion with the "red lines" printed on the issued FIELD COPY, so it is clearfor both the building
inspector and builders on site.
Thanks in advance for your reply, I appreciate the clarification,
Colleen Wirth
Plans Examiner
Garfield County Building Division
108 8th Streei, Suite 401
Glenwood Springs, CO 81601
cwi rth @q a rfie ld-co u ntv. com
office (970) 945-1377 ext. 1610
5
Colleen Wirth
From:
Sent:
To:
Cc:
Subject:
Colleen Wirth
Monday, August 30,2021 8:24 AM
aaronnski @ hotm ai l.com; ku rtzeng i neer@yahoo.com
Andy Schwaller
BLRE-07-20-641 1
Message for Aaron Natoniewski and Brian Kurtz:
RE: BLRE-O7-2O-64LL- Natoniewski ADU at 4972 CR 113, Carbondale - pending
application commenced by prior plans exam¡ner Dave Argo
Thanks Aaron for Friday's voice mail message. I am reviewing your geotechnical engineers report (K+A project 20-7-41'4
and observatíon of recent excavation dated Augu st 24, 202I). I notice Daniel Hardin states recommended for an
allowable bearing pressure of L,500 psf (or 2,000 psf for footings wíder than 3 feet). Sheet 5-L, general structural notes
dated 6/3012020 from Brian Kurtz names an assumed soil bearing capacity names an assumed soil bearing capacity at
2,000 psf. Sheet 52 Footing widths appear varíable along the four faces of the detached garage 1ADU..... from 28 inches
along two faces of the buílding to those exceeding 3 feet. I am emailing now to verify and confirm the Kurtz &
Associates structural engineer is still comfortable with the desígned soil bearing and expresses no need to amend the
original footing widths?
I am striving to avoid confusion with the "red lines" printed on the issued FIELD COPY, so it is clear for both the building
inspector and builders on site.
Thanks in advance for your reply, I apprecíate the clarification,
Colleen Wirth
Plans Examíner
Garfield County Buílding Division
L08 8'h Street, Suite 401
Glenwood Springs, CO 8L601
cwi rth @ ga rf iel d-cou ntv.com
office (970) 945-1377 ext. 1610