HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-08-2L-7079
CHRISTIAN CHURCH CAMP ASSOC.
lnstall Push Piers
Foundation stabilization of Dining Hall
29LS CR 241, New Castle
s.07, T.05, R.90, 2L23O7300039
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL BUILDING CODE (l.B.C.)AND
2OO9 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJEgT TO ALL APPLICABLE ITEMS CONTAINED lN THE
ATTACHED "GARFI ELD COU NTY BUI LDI NG REQUI REM ENTS". N U M BER REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF
OCCUPANCY.
4) WtLDF|RE MtTtGATtON REQUTREMENTS: ENCOURAGËO rO COMPLY WITH WILDFIRE
MITIGATION AND DEFENSIBLE SPACE REQUIREMENTS PER COLORADO STATE FOREST
SERVICE AND LOCAL FIRE DISTRICT.
5) ENGTNEER SHALL BE ON S|TE DURTNG ANY FOUNDATTON STABTLIZATION (PUSH PIERS,
ptLE oR cAtssoN TNSTALLATTON). PROVTDE COPY OF THE ENGINEER',S APPROVAL
REPORT TO THE BUILDING INSPECTOR AT FOUNDATION INSPECflON.
6) VERTFY LANDTNGS AT EXTERIOR DOORS AT COMPLETION OF REPAIR SCOPE.
7) DRYWALL CRACKTNG tS MENTTONED tN ENGTNEER',S REPORT. VERIFY
'FANY
NEW
DRYWALL INSTALLATION WORK HAS OCCURRED (OR INSPECTIONS PERTAIN).
8) CONTRACTOR TO VER|Fy UTtLtTy CONNECTTONS - POTABLE WATER SUPPLY, ELECTRIC
powER, NATURAL cAS / PROPANE - tS SAFELY SHUT OFF AND/OR DISCONNECTED
DURING CONSTRUCTION REPAIRS. ENSURE CONSTRUCTION PARKING / STAGING AREA
ATTHE JOB SITE DOES NOT IMPACT UTILITIES. VERIFY EXISTING BUILDING MECHANICAL
FLUE PIPING, IF ANY, REMAINS SAFELY CONNECTED AND NO LEAKAGE UPON
COMPLETION OF THE FOUNDATION REPAIRS.