Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-08-2L-7079 CHRISTIAN CHURCH CAMP ASSOC. lnstall Push Piers Foundation stabilization of Dining Hall 29LS CR 241, New Castle s.07, T.05, R.90, 2L23O7300039 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATTONAL BUILDING CODE (l.B.C.)AND 2OO9 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJEgT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED "GARFI ELD COU NTY BUI LDI NG REQUI REM ENTS". N U M BER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WtLDF|RE MtTtGATtON REQUTREMENTS: ENCOURAGËO rO COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REQUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) ENGTNEER SHALL BE ON S|TE DURTNG ANY FOUNDATTON STABTLIZATION (PUSH PIERS, ptLE oR cAtssoN TNSTALLATTON). PROVTDE COPY OF THE ENGINEER',S APPROVAL REPORT TO THE BUILDING INSPECTOR AT FOUNDATION INSPECflON. 6) VERTFY LANDTNGS AT EXTERIOR DOORS AT COMPLETION OF REPAIR SCOPE. 7) DRYWALL CRACKTNG tS MENTTONED tN ENGTNEER',S REPORT. VERIFY 'FANY NEW DRYWALL INSTALLATION WORK HAS OCCURRED (OR INSPECTIONS PERTAIN). 8) CONTRACTOR TO VER|Fy UTtLtTy CONNECTTONS - POTABLE WATER SUPPLY, ELECTRIC powER, NATURAL cAS / PROPANE - tS SAFELY SHUT OFF AND/OR DISCONNECTED DURING CONSTRUCTION REPAIRS. ENSURE CONSTRUCTION PARKING / STAGING AREA ATTHE JOB SITE DOES NOT IMPACT UTILITIES. VERIFY EXISTING BUILDING MECHANICAL FLUE PIPING, IF ANY, REMAINS SAFELY CONNECTED AND NO LEAKAGE UPON COMPLETION OF THE FOUNDATION REPAIRS.