Loading...
HomeMy WebLinkAboutCorrespondence Regarding ADUAndy Schwaller From: Sent: To: Cc: Subject: Andy Schwaller Friday, September 10, 2021 B:12 AM Katie Tally Ho Colleen Wirth RE: IExternal] Harvey Project Sounds good. We will process the permit for just the steel building. You might need to add some column supports in the foundation for the future upper floor. Please check with an engineer. lt is ok to put in an ADU larger than 1000 sq.ft.. The zoning code calls it a secondary dwelling unit and the owner will need to speak to a planner. Andy From: Katie Tally Ho <katie@tallyhoconstruction.com> Sent: Thursday, September 9,2O2L 4:24 PM To: Andy Schwaller <aschwaller@ga rfield-county.com> Cc: Colleen Wirth <cwirth@garfield-county.com>; Sam lrmen <sirmen@garfield-county.com>; jeff@ta llyhoconstruction.co m Subject: Re: IExternal] Harvey Project Andy, Peryour conversation with Rob Parrington we would like to proceed with Steel building and foundation and then get a tenant finish permit for the ADU once we get our paperwork ln order. Please let me know if this works. Katie Parrington Sent from my iPhone On Sep 8,2021,, at 2:39 PM, katie@tallvhoconstruction.com wrote: Andy, I will have the guys drop by the site plan and updated plans with elevations tomorrow morning. Thank you, Katie Parrington Office Manager www. ta I lyhoconstruction. com <THC 2.Pngt ----Orig inal Message----- From: "Andy Schwaller" < > Sent: Tuesday, August 24,2021 8:26am To: "katie@tallvhoconstruction.com" <katie@tallyhoconstruction.com> Cc: "Colleen Wirth" <cwirth@garfield-countv.com>, "Sam lrmen" <sirmen@garfield- 1 Andy Schwaller From: Sent: lo: Cc: Subiect: Andy Schwaller Tuesday, August 24,2021 8:26 AM katie@tal lyhoconstruction.com Colleen Wirth; Sam lrmen Harvey Project Katie, We cannot review this project due to a lack of information as outlined in the building permit application checklist. Please review this checklist and resubmit. A partial list needing clarification is the framing for the znd lloor, deck, and stairs with a foundation. lnsulation, mechanical and moisture controlfor the proposed living area, a site plan, and scaled drawings. Also the application is for an ADU but the plans and design are for a secondary dwelling as defined by the zoning code. This project is on hold Andy 1 AETæ f,EIUTITITEL TALLY HO CONSTRU TION 145 COUNTY RD 225 RtFLE, CO 8165G9400 Jobsite Address: 993 COUNTY ROAÐ 227 RIFLE, CO 8L650 Date:3/3t21 Sentinel Building Systems Job lD: 840818 Dear Sir; This letter is to cert¡fy that a 40' wide, 60' long gable symmetr¡cal building wlth a 18' eave height as referenced above and manufactured by Sentinel Buildine Systems of Albion, Nebraska ís designed in accordance with the following loads: Roof Dead Load: 2,5 psf Seismic lmportance Factor: 1.00 Collateral Load: 1.0 psf Seismic Design Category: B Roof Live Load: 20.0 psf Assumed Site Class: D Rígid,Frame Live Load: 12.0 psf Seismic Coefficient: 0.465 (Ss*Fa) R¡sk Câtegory: ll - Normal ROOF SNOW LOAD FACTORS Ss=0.30 51=0.08 SDS=0.31Sd1=0.13 Ground Snow Load: 50.79 psf SEISMIC BRACING SYSTEM: StructuralSteel System Not Ffat Roof Snow Load: 42.66 psf Specifically Deta¡led for Seismic Resistance Sloped RoofSnow Load (Ps): 40 psf l=1.00 Ce=1.00 Ct=1.20 Cs=0.94 SEISMIC DATA Cs R Terrain Category: C lnterior Frame 0.10 3.00 Roof 0.10 3.00 Wind Load: V: 115 mph Vasd: 89.08 mph Left Endwall 0.10 3.00 Exposure C - Closed Right Endwall 0.10 3.00 lnternal Pressure Coefficient + 0.18 / {.18 Front Sidewall 0.10 3.00 Wind lmportance Factor: 1.00 Back Sidewall 0.10 3.00 Longitudínal Base Shear (V): 5.42 (k) Transverse Base Shear (V): 5.36 (k) Loads are applied in accordance with the IBC 15 building code. The certifying engineer does not cert¡fy that the building code or loads specifled are adequate or appropr¡ate for the intended use or location of this building. The buyer is responsible to verify specified loads are ln compliance with the local regulatory author¡t¡es. Design is in accordance with the applicable sections of the 2010 ANsl/Alsc 360-10 and the 2012 Alsl s100. Th¡s cert¡f¡cation is limited to the steel framework, the metal roof and the metal wall covering, and fasteners required for their installât¡on. This certification specifically excludes an analysis of the foundation and parts supplied by anyone other than Sentinel Building Systems. 5incerely, Q¡r r. [l/l,S)zrø9 Sr-rc ñ :- r..1 i David M. Cert¡fy¡ng Engineer i12 Þr crl /( Nç $D4- l4{r4 2 0,^t * zb- 2a¿) NIT I sentinelbuildinss.com EBtr@tr@agsrowthintl I nconowrH.coM