Loading...
HomeMy WebLinkAboutConditions of PermitCOND IT¡ONS OF PERMIT BLRE.OB -21 -7085 SCIB LLC New S/F Dwelling with attached gurage 399 Blue Heron Drive, GWS lronbridge, PH.ll, FLG 1&,2, Lot 52 1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL RESIDENTIAL CODE (t.R.c.)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS", NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND INSPECT|ONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTTFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENS]BLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) PRE-FABRICATED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION, ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR (1,500 PSF).