September 21, 2021
Project#02266-0006
Factory Direct Housing
2302 Highway 6 & 50
Grand Junction, Colorado 81505
Attention: Mr. Jon Ford
Subject: OWTS Design
Parcel 217903400012
Silt, Colorado
Dear Mr. Ford,
At your request, Huddleston-Berry Engineering & Testing, LLC completed design of an Onsite
Wastewater Treatment System (OWTS) for a single-family residence at Parcel 217903400012 in
Silt, Colorado. The site location is shown on Figure 1 – Site Location Map. A site plan is
included as Figure 2.
Site Description
At the time of the investigation, excavation had been conducted into the native hillside resulting
in an approximate 20-foot cut. The perimeter of the site was fenced and sloping down towards
the south outside the excavated area. Site topography is shown on Figure 2. Vegetation
consisted of weeds, grasses, and sparse small to large bushes and trees. The site was bordered to
the west, east, and south by residential properties, and to the north by a cliff face.
Subsurface Investigation
In order to evaluate the subsurface conditions at the site, two test pits were excavated in the
vicinity of the proposed OTWS. The locations of the test pits are shown on Figure 2. Copies of
the test pit logs are included in Appendix A.
As indicated on the logs, the subsurface conditions at the site were consistent. The test pits
generally encountered brownish tan, moist, loam soils from the ground surface to the bottoms of
the excavations. The soils were subangular blocky with a strong structure. Groundwater was not
encountered in the subsurface at the time of the investigation. In general, HBET believes that the
seasonal high groundwater elevation is deeper than 8.0 feet at this site.
Onsite Wastewater Treatment System
Seepage Bed Design
The design of the absorption system generally follows the requirements of the Garfield County
Department of Public Works as outlined in the Garfield County On-Site Wastewater Treatment
System Regulations, effective July 2019. The proposed construction at the site is anticipated to
include a three-bedroom home.
Parcel 2179034000012
#02266-0006
09/21/21
Z:\2008 ALL PROJECTS\02266 - Factory Direct Housing\02266-0006 13th and Linda Street\200 - Geo\02266-0006 LR092121.doc 2
Based upon visual-tactile evaluation of the site soils, a Long-Term Acceptance Rate (LTAR) of
0.6 will be utilized for the absorption field design. The daily flow of the sewage disposal system
is calculated below and a plan and profile of the absorption system are shown on Figure 3.
Average Daily Flow = (6 persons)(75 GPD/person)
= 450 GPD
Soil Treatment Area = (450 GPD / 0.6) = 750 Square Feet
Adjusted Soil Treatment Area = (750 SF)(1.2)(1.0) = 900 Square Feet
Size of STA = 12 ft x 75 ft
System Installation
The installation of the septic tank, plumbing lines, Infiltrators, etc. should be completed in
accordance with the Garfield County On-Site Wastewater Treatment System Regulations and
Infiltrator Systems, Inc. specifications. In addition, the following construction procedures are
recommended:
The septic tank and distribution box should be placed level over native soils that have
been scarified to a depth of 8 to 12 inches, moisture conditioned, and recompacted to
a minimum of 95% of the standard Proctor maximum dry density, within ±2% of
optimum moisture content. However, up to 3-inches of washed rock or pipe bedding
passing the 1-inch sieve may be used as a leveling course under the septic tank and/or
distribution box.
The bottoms of trenches and backfill around the septic tank and distribution box
which will support sewer or effluent lines should be compacted to at least 90 percent
of the standard Proctor maximum dry density, within ±2% of optimum moisture
content. Pipe bedding should have a maximum particle size of 1-inch.
Vehicular or heavy equipment traffic and placement of structures should not encroach
within 10 feet of the septic tank or distribution box.
Inspection Schedule
Huddleston-Berry Engineering & Testing LLC should be retained to monitor the construction of
the OWTS. The following schedule of observation and/or testing should be followed:
Observe the absorption bed excavation prior to placement of pipe and gravel.
Observe placement of the septic tank, distribution box, and all connecting sewer and
effluent lines prior to backfill. Verify proper fall between inverts.
Observe and verify installation of the absorption bed prior to placement of cover and
backfill.
In conformance with Garfield County regulations, HBET will be required to provide the Garfield
County Health Department with documentation certifying that the OWTS was placed in
conformance to the plan and profile and Garfield County regulations.
General Notes
The OWTS design was based upon the results of the subsurface investigation and on our local
experience. The design is valid only for the proposed construction.
Parcel 2179034000012
#02266-0006
09/21/21
Z:\2008 ALL PROJECTS\02266 - Factory Direct Housing\02266-0006 13th and Linda Street\200 - Geo\02266-0006 LR092121.doc 3
We are pleased to be of service to your project. Please contact us if you have any questions or
comments regarding the contents of this report.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Michael A. Berry, P.E.
Vice President of Engineering
09/21/21
FIGURES
Developed by
Date created: 8/19/2021
Last Data Uploa ded: 8/19/2021 2:09:51 AM
1,601 ft
2789 Riverside Parkway
Grand Junction, CO 81501
Project No.: 02266-0006
Date: 09/21/21
By: MAB
PARCEL#217903400012
FIGURE 2 - SITE PLANTEST PIT
C.I. = 2 FT
SCALE: 1" = 40'
**NOTE:TANK AND BED LOCATIONS APPROXIMATE AND MAY SHIFT SOME DURING
CONSTRUCTION BASED UPON SITE TOPOGRAPHY, OWNER PREFERENCE, AND/OR OTHER
FACTORS AS LONG AS APPLICABLE SETBACKS ARE MET. ACTUAL LOCATION OF TANK AND
BED WILL BE INDICATED ON AS-BUILT DRAWINGS.**54805490
5500
5510
5520
5530
5500
547025' TO CREST OF SLOPE MIN.
~24'64'
29'5'
~32'
~30'
~24'
~40'
~120'
TP-1 TP-2
REPAIR AREA
STA
WATER LINE
NEW HOME
MINIMUM 1,000
GALLON TANK
75'
12'
09/21/21
2789 Riverside Parkway
Grand Junction, CO 81501
Project No.: 02266-0006
Date: 09/21/21
By: MAB
MINIMUM SETBACKS
(UNITS = FT)
**OTHER SETBACKS NOT LISTED HERE SHOULD BE IN ACCORDANCE WITH GARFIELD COUNTY OWTS REGULATIONS
**USE SWEEP 90'S OR
TWO 45'S AT 90
DEGREE BENDS**
DETAIL AREA
SCALE: 1" = 20'
PARCEL#217903400012
FIGURE 3 - SEPTIC SYSTEM
DETAILS
75'
20'
MIN
4-INCH DIAMETER SEWER AND
EFFLUENT PIPE MEETING ASTM
D1785, SCHEDULE 40 OR SDR 35
DISTRIBUTION BOX THAT
ENSURES EVEN DISTRIBUTION
OF EFFLUENT
SEPTIC TANK WITH
MINIMUM 1,000
GALLON CAPACITY
WATER LINE
4-INCH DIAMETER PERFORATED
PIPE
NEW HOME
INSPECTION PORTS
INSPECTION PORTS
GENERALIZED SYSTEM PROFILE
GENERALIZED BED PROFILE
5'
MIN
SEEPAGE BED CONSTRUCTED OF
1.5 INCH MINUS WASHED ROCK
COVER SOIL; NATIVE SOILS OR
OTHER SUITABLE TOPSOIL
4-INCH DIAMETER PERFORATED PIPE
12'
4'
2'
09/21/21
APPENDIX A
Typed Test Pit Logs
8.0
Loam, brownish-tan, moist, subangular blocky, moderate structure, firm
**Topsoil Stripped
Bottom of test pit at 8.0 feet.
NOTES
GROUND ELEVATION
LOGGED BY SD
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry
AT END OF EXCAVATION dry
AFTER EXCAVATION ---
TEST PIT SIZE
EXCAVATION CONTRACTOR Client GROUND WATER LEVELS:
CHECKED BY MAB
DATE STARTED 7/20/21 COMPLETED 7/20/21
DEPTH(ft)0.0
2.5
5.0
7.5 SAMPLE TYPENUMBERPAGE 1 OF 1
TEST PIT NUMBER TP-1
CLIENT Factory Direct Housing
PROJECT NUMBER 02266-0006
PROJECT NAME Parcel 217903400012
PROJECT LOCATION Silt, CO
GENERAL BH / TP / WELL 02266-0006 13TH AND LINDA STREET USDA.GPJ GINT US LAB.GDT 9/16/21Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
GRAPHICLOGMATERIAL DESCRIPTION
8.0
Loam, brownish-tan, moist, subangular blocky, moderate structure, firm
**Topsoil Stripped
Bottom of test pit at 8.0 feet.
NOTES
GROUND ELEVATION
LOGGED BY SD
EXCAVATION METHOD Trackh/Backhoe AT TIME OF EXCAVATION dry
AT END OF EXCAVATION dry
AFTER EXCAVATION ---
TEST PIT SIZE
EXCAVATION CONTRACTOR Client GROUND WATER LEVELS:
CHECKED BY MAB
DATE STARTED 7/20/21 COMPLETED 7/20/21
DEPTH(ft)0.0
2.5
5.0
7.5 SAMPLE TYPENUMBERPAGE 1 OF 1
TEST PIT NUMBER TP-2
CLIENT Factory Direct Housing
PROJECT NUMBER 02266-0006
PROJECT NAME Parcel 217903400012
PROJECT LOCATION Silt, CO
GENERAL BH / TP / WELL 02266-0006 13TH AND LINDA STREET USDA.GPJ GINT US LAB.GDT 9/16/21Huddleston-Berry Engineering & Testing, LLC
2789 Riverside Parkway
Grand Junction, CO 81501
970-255-8005
GRAPHICLOGMATERIAL DESCRIPTION