Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT B LRE-09 -21 -7 11 B Uriel Mellin New SlF Dwelling with attached gurage TBD CR l03,Carbondale Ca I licotte Ra nch, LoT 24 1) ALL WORK SHALL COMply WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (r.R.c,)AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS". NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST, 3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTI FICATE OF OCCU PANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT, 5) PRE-FABRICATED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION, ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR (1,500 PSF). 7) ON.SITE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO, PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) BU|LDINGS WtTHtN COLLICOTTE RANCH EXCEEDING 6,20Q SO FT SHALL BE FIRE- SPRINKLERED, FIRE- SPRINKLER PERMITS AND INSPECTIONS ADMINISTERED