Loading...
HomeMy WebLinkAboutPipeline Map9652PELINREV:1"', ----**DETAIL ''A''NPM G35 496 PAI)EXlSflilG LOGATION¡LOCATION:PADilPil G355.u826 496 PADPROPOSED LOGATION¡BJU N23 496 CDP PADIIIIII5lDETAIL ''APIPELIPIPELINF26 496 PADLOGAItOr{:LOGAItOr{:G35 496 FRACSGU TUI23 496 PADLOGATIOI{:IÍrrTï\f\APPROXIMATE TOTAL PROPOSED 3-PHASE PIPELINE DISTANCE : 31gJ'+l-APPROXIMATE TOTAL PROPOSED GAS LIFT PIPELINE DISTANCE: 2759' +I-APPROXIMATE TOTAL PROPOSED FRAC LINE DISTANCE: 497' +1.APPROXIMATE TOTAL PROPOSED WATER LINE DISTANCE: 4256' +I-NOTE: PARCEL DATA SHOWN HAS BEEN OBTAINED FROM VARIOUS SOURCES AND SHOULD BE USED FOR MAPPING, GRAPHIC AND PTANNINGPURPOSES ONLY. NO WARRANTY IS MADE BY UINTAH ENGINEERING AND LAND SURVEYINGFOR ACCURACY OF THE PARCEL DATA.NAfiI : 17, lXXlSCALEl0-08-19l)-)?-19DAYL'ON SLAUGH. K.C.C TVTF.DRÁ,WNBYSURVEYBD BYTOPO DPIPELINE MAPNPM G35 496 PAI)Caerus Oit & Gas LLCsw 1/4 NE 1/4, SECTION 35, T4S, Rg6W,6th p.M.GARFIELD COUNTY, COLORADO,rÑ\*JJ"N-IAh!- EXISTING 2-TRACK (NEED.q UPGRAÐEDI-*+UELS, LLCCorporate Office * 85 South 200 EastVernal, UT 84078 * (435) 789-1017EXISTING ROAD.. - PROPOSEDWATERLINE. PROPOSED 3-PHASE & GAS LIFT PIPELINEPR()POSEÐ FTIAC LÍNEEXISTING PIPELINEE}ilSTINGFENCEPROPOSED ACCESS ROADFOR BJU N23 CDP PADPROPOSED 3.PHASEEL¡NE TIE-IN POINTPROPOSED ACCESS ROADFOR BJU 826 496 PADPROPOSED WATERLINE TIE-¡N POINTxPROPOSED 3.PHASE &GAS LIFT PIPELINEPROPOSED ACCESS ROADPROPOSED WATER LINEEJXISTING 2.TRACKNEEDS UPGRADEDPROPOSED GAS LIFTATIE-IN PO¡NTPROFOSED FRAC LINfWATER LINEPROPOSED 3-PHASE &GAS LIFT PIPELINE