Loading...
HomeMy WebLinkAboutVicinity Mapsz Fl 40ÈÈâFlf,<oËúú,*"O ^ts5Fìrã ä 8 3ãsiüBSB>,ú € u Ð,ï F 3e v F = r 4 Éãe (J FlÊ(t) (J .i¿ ¡ì- C) útrl Q ,IT\ CAERUS OIL & GAS LLC ulh¡ran+ VICINITY MAP NPM G35 496 PAD LOCATED IN: sEcTloNs 26 & 35, T4S, R96W, 6th P.M GARFIELD COUNTY, COLORADO 85 South 200 East Vernal, UT 84078 O: 435.789.1017 urrrv.uintah group.com . SINCE 1964 - WYOMING NEBRASKA MOFFAT LARIMER LOGAN $\\$ù1sJACKSON\IEtD D[NVIR PROJECT LOCATION ROUll IIIORGAN RIO BLAICO GRÄND GILPIN IU¡IÄ ADAùIS GÄRFIELD IAGtI ARAPÂHOE ILBIRT KITCÄRSON PITKIN IUESÄ DETTA PARK il, PÂSO CHIYINNE CUNNISON LINCOLN FREIIONT xt0wÀ SACUACHE PUËBLO SÀN MIGUEL OTORO BINT PROTIERS DOLORIS HUERFANO MONTEZUMÄ RIO CRÁNDE LA PLATA LAS ÂNtnßS BACA ÁRCHULITA c0N[,¡0s $ut ëhr$ä È N v7 øe ü NEII/MEXICO STATE OF COLORADO SOURCE: 30x60 TOPOGRAPHIC MAP, GRAND JUNCTION & DOUGLAS PASS, CO (U.S.c,S,, 1981) 0' 5,000' 10,000' 1" = 10,000' SCALE LATITUDE: 39' 39'40.63" N LONGITUDE¡ lO8' 08'06.92" W (ilAD 83) PROPOSED LOCATION¡ NPM G35 496 PAD ï\\ l,rUiñtJt'\'Nfl\l ^ J,{ R 96 \ü il\r T5S T6S J ¡ ''' .,I REV DATE BY REVTSIONS SCALE: ASSHOWN DRAWN BY: SLW DATE DRAWN;09-30-2021 UELSFILENO.: C-7067 PROJ.NO; CAE0I-le-0062 VICINITY MAP SHEET I NOT TO SCALE OKLAHOMA SCALE: 1" = 10,000' OWNER INFORTIATIOil: PARCEL * 15172740001 CAERUS PICEAI{CE LLC SGU T23 496 PAD NG LOGATION: PROPOSED LOGATIONT BJU N23 496 GDP PAD\i\\\ \ t { I ! ( PROPOSED 826 496 PAD I ì F26 496 PAD LOGA.fION: I 5 I 2 I I I I 2 i' I,] . l I I i IJINT¡¡1 85 South 200 East Vernal, UT 84078 O: 435.789.1017 www.uintahgroup.com - SINCE 1964 - z ÉEBJ¡<ôË¿úr-o,rFr6Fl 3ã ä 8 3ãslü3sB>q ü Q ÈFì \ê âZù,ôtFle v H>, V lfrç-1 F( .¿ aH3 (J FlFl rt) (, c¿ FlFio(t) úfrl U ,frr\ 3 7502 09-30-202 LNA { II \ I I I j I I ! t l ì ! I I I I \ ) I J Ij I I 27 æt-toO I i i \ I / I I ! I 1 ) l I l \ r\Ìr PROPOSED LOCATION: NPM G35 496 PAD LOGATION: NPM PAD I These plans may not identify all ufility lines! Utility lines within the vicinity of this proposal must be identified prior to construction.NPIUI G35 ¿96 PAD LOGAÎION: il I ¡ I ] j I t ! t l I I J I 1 i I 1 I L . i: ¡ L l I .l REV DATE BY REVISTONS SCALE: l"-1,000' DRAWNBY: SLW DATE DRAWN:09-30-2021 UELSFILENO.: C - 7 0 6 7 PROJ. NO: CAEoI-19-0062 SITE PLAN SHEET 2 0' ¡ ¡ J 500' ---r- - -il---"--EXISTING PIPELINE 1" = 1,000' SCALE ij PROPOSED G35 FRAC SUPPORT GORRIDOR z ÉËBFlf,<OEúú*-oat<tFl 3ã ä IH:¿ô>;ı F 2sBSB >Ê( { Q 2i, F 3ü V F,> \J E¡¡ É1 .¿ AHı IÊj (t) zh c¿ Fll-lo (t) útrl (J 37502 09-30-2021 A L EROSION CONTROL NOTES GENERAL NOTES BMP DETAILS ARE PROVIDED IN APPENDIX E OF THE CAERUS OILAND GAS LLC, MASTER STORMWATER MANAGEMENT PLAN. THE REQUIREMENTS STATED IN CAERUS'S MASTER PLAN SHALL OVERRULE ANY CONFLICTING REQUIREMENTS STATED BELOW. 1. AT ALL TIMES DUR]NG CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING EROSION DUE TO WIND AND RUNOFF. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR MAINTAINING THE EROSION CONTROL FACILITIES SHOWN. 2. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DUE TO UNFORESEEN PROBLEMS OR IF THE PLAN DOES NOT FUNCTION AS INTEDED, ADDITIONAL CONTROL DEVICES MAY BE REQUIRED UPON INSPECTION OF THE PROPOSED FACILITIES. 3. ALLAREAS DISTURBED DURING CONSTRUCTION SHALL BE SEEDED WITH NATIVE VEGETATOIN. 4. DUST CONTROL MEASURES SHOULD FOLLOW LOCAL AND STATE ORDINANCES FOR COMPLIANCE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (WATTLE ROLL, TRENCH BREAKERS, ETC.) DUE TO GRADE CHANGES DURtNc THE DEVELOPMENT OF THE PROJECT. 6. THE CONTRACTOR SHOULD LIMIT THE AMOUNT OF SOIL EXPOSED AND THE TIME.FRAME IT IS EXPOSED THROUGH PHASING. 7. THE CONTRACTOR SHOULD KEEP THE WORK ZONE AS NARROW AS POSSIBLE 8. THE CONTRACTOR SHOULD AVOID WORKING IN SEASONS WHEN HISTORICAL WEATHER PATTERNS INDICATE THE MOST PRECIPITATION. 9. EXISTING WELL PADS TO BE USED AS STAGING AREAS DURING CONSTRUCTION. STABILIZED CONSTRUCTION ENTRANCES SHALL BE USED ON EXISTING WELL PADS. CONTRACTOR SHOULD KEEP AREAS OF ENTEFI/EXIT TO A MINIMUM. 10. ALL MEASURES CONTAINED IN THIS PLAN SHALL BE MAINTAINED IN FULL FUNCTIONAL CONDITION UNTIL FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY FOURTEEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A O.2s.INCH RAINFALL EVENT. ANY NEEDED CLEANING AND REPAIRS NEED TO BE DONE WITHIN 7 DAYS OF DISCOVERY. 11. PRE-CONSTRUCTION, CONSTRUCTION AND POST.CONSTRUCTION SHEETS NEED TO BE UPDATED IF BMP'S ARE CHANGED. 12. POST-CONSTRUCTION CONTOURS NEED TO BE THE SAME AS PRE.CONSTRUCTION CONTOURS. 13. ALL BMP'S NEED TO BE MAINTAINED THROUGHOUT CONSTRUCTION AND UPDATED AS NECESSARY. 14. DURING CONSTRUCTION CONTRACTOR NEEDS TO MINIMIZE THE SIZE AND TIME EXPOSURE OF ALL DISTURBED SOILS. 15. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT SLOPES AND CHANNELS, REDUCE IMPERVIOUS SURFACES, PROMOTE INFILTRATION, CONTROL THE PERIMETER OF THE SITE; AND FOLLOW POLLUTION PREVENTION MEASURES. 16. SOIL WPES: ACCORDING TO THE UNITED STATES DEPARTMENT OF AGRICULTURE - NATURAL RESOURCE CONSERVATION SERVICE MOST SOILS lN THE AREA ARE TYPE C 0R TYPE D WHICH MEANS A HIGHER POTENTIAL FoR RUNOFF (SLoWER INFILTRATIoN RATE). THE K FACTOR, SUSCEPT|B|L|TY OF A SO|L TO SHEET AND R|LL EROSTON By WATER, VALUES TyptCALLy RANGE FROM 0.02 TO 0.69. FoR THIS AREA THE K FACTOR HAS AN AVERAGE 0F 0.16 (HIGHER THE VALUE, THE MORE SUSCEPTTBLE THE SO|L tS TO SHEET AND R|LL EROSTON By WATER. 17, IF DEWATERING IS REQUIRED, A STATE CONSTRUCTION DISCHARGE PERMIT IS REQUIRED. 18, RECEIVING BODY OF WATER IS PICEANCE CREEK 19, THIS SWMP IS DESIGNED TO ADDRESS RUN-ON AND RUN.OFF WATER. WATER NEEDS TO BE PREVENTED FROM COMING ONTO THE CONSTRUCTION SITE AS WELL AS POSSIBLE. IN THE CASE OF THIS PROJECT MOST OF THE PIPELINES ARE AT THE TOP OF WATERSHEDS THUS DECREASING SIGNIFICANTLY THE AMOUNT OF RUN.ON TO THE SITE. RUN.OFF FROM CONSTRUCTION SITE SHOULD BE CONTAINED AS WELL AS POSSIBLE USING EARTHEN BERMS AND OTHER BMPS AS PRACTICABLE TO CAPTURE ANY EXCESS SEDIMENT AND ALLOW IT TO DEPOSIT BEFORE LEAVING THE SITE. ANY CAPTURED SEDIMENT NEEDS TO BE SPREAD OVER THE SITE ONCE CONSTRUCTION HAS BEEN COMPLETED AND REVEGETATION IS OCCURRING. 20. CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING UTILITIES. 21. CONSTRUCTION ACTIVITY WILL CONSIST OF, IN THE FOLLOWING ORDER: SITE MARKING, ESTABLISHMENT OF PERIMETER STORMWATER BMP'S, SITE CLEANING, TOPSOIL REMOVAL AND STOCKPILING, INSTALLATION OF THE PIPELINE, RESTORATION, AND FINAL SEEDING, INTERMEDIATE STORMWATER BMPS WILL BE INSTALLED AND MAINTAINED THROUGHOUT CONSTRUCTION AS REQUIRED BY THE CONTRACTORS MEANS AND METHODS. Lond Slope Pipeline Construction Equipment ã Multiple instolled to be S\üMP LEGENI) @ rnercHanalxen @t w¡rrne¡n Cnl) nweerrnnvennen ,l|Ir.tJINT¡rut¡xarrlttrra r tlID autTtYtra 85 South 200 E¡sú Vernal, UT 84078 O:435.789.1017 nww.uintahgroup.com - srNCE 1964 - nENCtt oEl tL (Tf") þæE * s s s * too ø ob ñq o r,Oa t ¡ o t.nq te *P É ð'6 eoch pipelines 2' from pipe)of (edge of pipe to tl-ow Erosion Soils = Coorse Rocky Soils, Grovel, ond Some Cloy 2High Eroslon Soils = Fine, Frioble Soils, Silt, Fine Sonds 5sîte-Specific terroin moy olso dictole spocing of woter bors other edge TABLE 2 - WATER BAR SPACTNG (3) ROW Grode %Low to Non-Erosìve Soils (1)Erosive Soils (2) 0-5 220'-270'115'-145' 6- 10 175'-225'85'-115' 11-15 125'-175'50'-80' 16-20 90'- 140'J5'-65' 21-30 75'-125'25'-55' 31+25'-75'15'-45' REV DATE BY RDVISIONS NOTES TABLE 1 _ TRENCH BREAKER SPACING Slope %Spocing (feet) 5-1 5 250-350 1 5-30 1 50-250 >30 50-1 50 SHEET 3 OWNER INFORI}IATIOI{: PARCEL # 19172740001 CAERUS PIGEANCE LLC z iEEFlt<oËúú*-oa[.t6Flrã ä 8 3ãsËsBSB>,4 ü Q 2i, F 3s V F = F 4 ¿ ã e (J FlFl(t) () c¿ j -o(t) úri (J ulNtant¡xatxllttla ¡ LArD auivlYlta 85 South 200 Easú Vernll, UT 84078 O: 435.789.1017 www.uintahgroup.com . SINCE 1964. ,l|I\ SITE B PROPOSED LOCATION: NPM G35 496 PAD l. 2. 3. 4. SEGÌ|ON DETATL (SHEET 3). GONTRAGTOR TO ADJUST ETP'S AS NEEDED IN THE FIEID. AIL GI{ANGES NEED TO BE NOTED AND IIARKED U' ON THESE sHEEI8. USE EXTREME GAUÏION W¡{EN CONSTNUGTING NEAR EXISTING PIPEIINES (CONTAGT PIPELINE OWNER FOR SPECTFICATTONS). ANTIGIPATED AREA OF DISTURBANGE IS I4.O AGRES. NOÏE3: REV IIATE BY RDVISIONS SCALE: l":1,000' DRAWN BY; SLW DATE DRAWN: 09-30-2021 UELSFILENO.:C-7067 PROJ. NO: CAE0I-1 9-0062 PRE.CONSTRUCTION SHEET 4 -f - -EXISTING PIPD,LINE 0' 250' 500' lil = 500t SCALE I1{FORMATIOl{: # 15172740001 PICEAI{CE LLC z ÉEBFlf,<OEúú--o,r [-r 5 Fl =3 5 8 iäsiü3sB>É € e2i R 3(, V F aã 3 c,) FlFl u) c, .l¿ '-¡tio(t) úrc (J ,l!\L,|NÉil{ 85 South 200 East Vernal, UT 84078 O: 435.789.1017 rvrvw.uintahgroup.com - SINCE 1964 - PROPOSED LOCATION: NPM G35 496 PAD NOTEE: I. REFERTO NOTES SHEET FORTY'ICAL GROSS SEGT|ON DETAtt (SHEET 3). 2, CONTRAGTOR TO ADJUST BTIP's AS NEEDED IN T}IE FIELD. ALL GI{ANCES NEED TO BE NOTED A¡ID MARKED UP ON THESE SIIEETS. T. USE EXTRETE CAUTIONWHET{ CONSTRUGTING NEAR EXIETINC PIPELII{ES (GONTAGT PIPELINE OWNER FOR SPEGtFtGATtONS). 4. ANTICIPATED AREA OF DISTURBANGE IS I¡I.9 ACRES. R¡V IIATE BY REVISIONS SCALE: l":1,000' DRAWN BY: SLW DATE DRAWN: 09-30-2021 UELSFILENO.:C - 7 0 6 7 PROJ. NO: CAE0I-l9-0062 CONSTRUCTION SHEET 5 - - -il- - -f- É -"- -EXISTING PIPELINE 0' 500' 1,000, l" = 1,000' SCALE CAERUS PIGEANCE LLC OWI{ER INFORMATION¡ PARGEL # 19172740,001 ÍEãOEúú*^o¡[<6Flrã ä 8 3ãslü3$B>ú d u äã F 3e V F,- \/ li¡i = F 1 ¿ ã e (J Q FlFl(t) (, .l¿ ¡l =(t) úrfl (J ulNtan-t 85 South 200 East Vernal, UT 84078 O: 435.789.1017 n"n'rv.uintahgroup.com - SINCE 1964 - ,TT\ PROPOSED LOCATION: NPM G35 496 PAD NOIES: I. REFER IO NOTES SI{EEÎ FOR TYPIGAL GROSS SEGT|ON DETAT! (S|{EET 3). 2. GONTRACIOR TO ADJUST BTP'S AS NEEDED IN THE FIEID. ALL G}IAN6ES NEED TO BE NOTED AND MARKED U? ON THEEE EHEETS. 3. USE EXTREiIE GAUT¡ONWI{EN GONSIRUGTING NEAB EXISTING PIPELINE¡ (GONTAGT PIPEL|NE OWNER FOR SPEGTFtGAT|ONS). .. ANΡCIPATED AREA OF DIETUR¡ANGE IS I4.E AGRES. REV DATE BY REVISIONS SCALE: l"-1,000' DRAWNBY: SLW DATE DR A.WN: O9-30-202I UELSFILENO.: c-7o67 PROJ. NO: CAE0I-l 9-0062 POST-CONSTRUCTION SHEET 6 ,__EXISTING PIPELINE 0r 500' 1" = 1,000' SCALE