HomeMy WebLinkAboutSubsoil Studyt-t ËpwCIRTH -PAWLAt( G EO'|ËCH N tCA L
I lrl,rr¡,trll -l',rrr'l.rl {.ir, *r.l r¡ ¡x.rl. lu
i¡.ìit"! t ¡ru¡¡tt ß,'rJ l5.T
( ilç¡trrrr.nl S¡'r'ttl,.t., t '',!,,r,¡,l,r IIt¡tlI
I'l r, ¡¡tr: tlTtr' tl.l i" iQs.r
l-.r..: rr¡il-*-l i.rl i.l
r rtr.lil: li¡:c"ü l1l\L(, {i ':h i' rtrì
F==il
REGEIVED
ücT 2 0 2021
GARFIELD COUNTY
COMMUNITY DEVELOPMEI{T
SUBSOIL STUÞY
rOR FOUNDATION DESIGN
PROPOSED BARN ADDITION
AND RESIDENTIAL TRI.PLEX
ASPEN VALLEY POLO CLUB
ASPEN EQIIESTRTAN ESTATES
COUNTY ROAD IOO,
GAR¡IELD COUNY, COLORADO
It
JOBNO. lI3 459A
DECEMBER 18,2013
PREPARBD FoRr
DIVTDE CREEK BUILDERS
ATTN: II{AXFILISS
1531COTTNTyROAD 342
SILT, COLORADO t1652
¡l! ¡$ û l¡t qß"'"Ye[-q9Jgr-ì
P¿rker ]tll"S4l"7l¡9 o Cokrr¡rclc SFrings ?19'ó11-5562 u Sih'erthotn,.' 9711-4(rtì-1989
TABLE OF CONTENTS
PURPOSF AltD SCOP.E OF STUDY ..,.,.-........,.. I -
PROPOSED CONSTRUCTION......... .............,,...:. ................, I -
SITE C9¡IDTflONS ..,,,.............. .....-2-
SUBSIDENCË POÎENTIAL..,.."....,..... ........,....,2 -
FIELD Ð(PLORJq.TION..........,....;............,,.. .....- 3 -
SUBSURFACE CONDITIONS.....,.
FOUNDATION BEARTNG CONDrTrONS...,..."......,. .......,...- o -
ÞESTGN RECCIMMËNbATrONS.................,....;......, ...........- 4 -
FOUND4TIONS.......,.,..........i...........,... .-........- 4 -
FLOOR SLABS .r.,...i....!!.,...,,.,...,.......,.r¡.,.,....,.,.,r.,.,, ....,..- 6 -
TJNDERDRAIN SYSTEM ........,.." 6 -
SUR.FACE DRAINACE ...........i..,.........,...,,...' 7 -
LIMITATIONS
FIGURE I - TOCATTON OF ÐßLORATORY BORINGS
FIGURB2 - LOGS OF EXPTORATORY BORINGS
FIGI,IRE 3 - LEGEND AND NOTES
FIGURE 4 - SïVELL-CONSOTIDATION TBST RBSULTS
FTCÙRE 5 . GRADATION îEST RESUTTS
TABLE I- SUMMARY OF'LABORATORY TEST RESULTS
PURPOSE AND SCOPE OX'üTITDY
This rqport præents ttre results of a subeoil rtudy for a proposed barn addition and
rosidontial tri-plex to be located at tho Aspon ValleyPolo Club, Aspen Equæhian Estates;
CountyRoad 100, GarfieldCounty, Colorado. TheprojectsiteisshownonFiguro 1.
The purpose of tne study was to develop recommendations for thç foundation design.
Tho study was conducted in accordancs wíth our agree,ment for geotechnical engineeríng
services to Divide Creek Builders dated Ðecembe¡ ll, 2013. Hepworth-Pawlak
Geotechnical, Inc. proviously perfomred a prelirninary geotechnical study for the
proposed development (Preshana Farms) andreported our findings uuderJob Numb,er
198 501, dated August 31, 1998. We also provided ageotechnical engineering study for a
proposed connercial area on theproperty, Job Number 704'139, dnted Novçmber 30,
2004.
A field explorationprognm consisting ofexploratoryborings was conducted to obtain
information on the zubsurfaoe conditions. Samples of the subsoils obtained during the
field explor¡tion wsre tested in the laborahry to determine their classification,
comprossíbility or swell and other enghcoring characteristics. The results ofthe ñeld
exploration and laboratory testing were anal¡ued to dovdop reconrmendations for
foundation t¡ryes, depths and allowable pressures for the proposod building foundation.
This report summarizes the data obhined durihg this study and presents our concluiions,
ilosign rcconmcndatìons and other geotachnical engineeriugconsiderations based onthe
proposed consftuotion ånd the sr:bzurface oonditions encountered.
PROPOSED CONSTRTICTION
Theproposed bam addition will be a tall one story wood frame stucture. Ground flobr
will bo alab-on.grade. Orading for the shucture is aszumed to be relatively minor with
cut depths betweon about 2 to 4 feet. The proposed tri-plex ¡t ill be one and two story
wood ûame consüuctíon above a crawlspace. Grading for the skucturss is æsumed to be
relativoly minor with cut dopths betwson about 2 to 4 feet, lVç assumo relatively líght
Job No. I 13 4594 eeFtacn
2-
foundation loadings, t)æical of the proposed type of consfuction. Theproposed building
lo'cations are shown on Figure 1. The øristing pole bam, garage and residence wÍll be
razd prior to constructíon.
If buildittg loadings, location or grading plans chanp significantly from those desøibed
abovg we should be notified to re.evaluate the recommend¿tions contained in this report.
STTE CO¡IDITIONS
Tho property has recentiy been ussd for equesfian putposes and devolopmênt haÉ
consisted ofba.ms, sheds, indoor arena and outside stables and arenas. An existingpole
barr¡ garage aud residence consbucted prior to the subdivisiou creation aro loc¿ted in the
southeast comer of the properly, An existing stable and indoorar€na are locatcd in the
southwest comer of theproperty. The properly is relatively flat with a slight slope down
to tlrs west. There was nbout 4 inches of snow cover at the timo of our field invostigation.
STJDSIDENCE POTENTTAL
Bedrock of the Pennsylvanian age Eagle Valloy Evaporite underlies the Aspen Equeshian
Estak$ zubdivision. These rocks aro a $equence ofg¡psiferous shaie, fine-grained
sandstone and siltstone with somc massive beds of glrysum and limestone. Thers ie a
possibility that massive gypsum doposits assooiated u¡ittr the Eaglo Valley Evaporite
unde¡lie portions of thc lot. Dissolution of the gypflrm undcr cortain conditions can cãu$o
sinkholes to develop and can produce arcas of localizsd subsidenco. During provious
work in the area" $svoral sinkholes have been observed scattorcd tirouglrout the lower
Roaring Fork River Vnlley.
Sinkholes we,re not observed in the immediatc area of the subject property. No evidence
of cavitie$ w¿s encountered in the zubsurface materials; howover, the exploratory borings
were relatively shallow, for foundation design only. Based on ourpresont lmowledgs of
the subsurface conditions at the site, it cannot be said for certain that sinlúolei will not
JobNo. l13459A eëFteqrr
,3-
develop. The risk of futuro ground subsidence on the proporfy throughout the servicç life
of the proposed bam addition aud tri-þlex, ín our opinion, is low; howeve¡ thç owner
should be made âwaro of the potenti¿l for si¡¡khole development. If firf.her iuvesfigation
of possible cavities in the bedrock below the site is desíred, wo should be mntacted.
ÏÏELD EXPLORATION
The field orploration for the project was conduoted on December 11, 2013. Fonr
exploratory borings were drilled at the'locations shown on Figure.l to evaluate the
subsurface oonditions, Two borinp were drillod at the bam atldition and two bodngs in
the arca of the hi-plex, Theborings we¡e advanced with 4 inch diamctor condnuous flight
åugers powercd by a üuck-mounted cME-458 driil rig. Tho boringe were loggod by a
rtpresentative of Hepworth-Pawlak Geofechnioal, lnc.
Samples of ihe subsoils vrere taken with l% inch and 2 inch I.D. spoon sanrplers. The
sannplers were driven intó the sub¡oils at iarious deptbs with blows ûom a 140 pound
hammer fatling 30 ínches. This test ís similar to the standard penetration test described
by ASTM Method D-t5Ù6. The poneüation resistance values are an indisation'of the
relalive density or consistenoy of the subsoils. Depths at whích tho samples were taken
and the penetration re$istance values are shown on tho Logs of Exploratory Borinp,
Fþre 2. The samplos were retutned to our laboratory for reviEw by tbe projec{ ongìneer
and testing.
SUBSTIRT'ACE CONDITIONS
Graphic logs of the subsurface conditions encountered at the site a¡o shown on Figuro 2,
Tho subsoils conri¡t of about one to two feet of fill overlying a relatively thin layer of
clay above sandy gravel witlr cobbles and small boulclers. Drilling in the dense granular
soils with auger equipment wæ difficult due to the cobbles and boulders and drilling
refiisal was encountercd in the deposit.
JobNo. l13459A c&Ftecl"r
-4-
Laboratory testing performed on samples obtained ftom tho borings included natural
moisture cotrtent and gradation analyses. Rasults of ¡well-consolidation testing'
performed on a relativcly undisturbed drive samplg preeented on Figure 4 indicate
moderats comprersibility under condítions of loadingand wetting. Rç,cults of gradation
analyses performed on a small dÍameter drivo sample (minus lYz ncbftaction) of tho
coarse granular subsoils are shown on Figure 5. The laboratory testÍng is summôrized in
Table L
No free water was çncountered in the borings at the time of drilling and the subsoils were
slightly moist to moist.
FOUNI}ATION BEARING COIIVI'ITIONS
A pit about 4 feot deep was observed alongside the existing stable. Tho existing footing
was exposed and the bottom of thc footing wao about 2 feet below srinounding grade. The
zubsoils oxposed consisted of sandy'clay fill above sandy clayoverlyinggranula¡material
at 3l¿¿ feet bolow grade. The proposed barn addition excavation adjacent to the oxistÌng
banr should oxpose the botfom of the oxisting footings and penetrate all fill ¡r¡aterial.
Tho tri-ptor fooþrint spane over tlie existing garage and a few ftçt of fill material should
be expected ín this area. Atl fill aud sandy çlay soils should bo rcmoved and the
excavation extended down to granular soils.
DE SIGN RECOMME¡IDATIONS
FOUNDATIONS
Considering the subsurface conditions encountered in the exploratoryborings and the
natura of the proposed oonstruction, we recommend tlre buitding be founded with spread
footingn beming on the natur¿l granular soíls.
Job No ll3459A c&Bteclr
5-
The design and constn¡ction criteria presented below should be obseryed for a spread
footing foundation system..
1) Footings placed on the undísturbed natural granular soils should be
designed for an allowable bearing prossure of 3,000 psf.The barn addition
can bo founded the natural sandy clay soils and designed for a maximum
soil bearingprossurs of 1,500 psf, Based on experience, wo expect
settlônênt of footings desþed and constructed as discussed in this section
will be about 1 inch or less.
2t The footings should have a minimum width of 16 inohes for continuous
walls and 2 feet for imlated pads.
3) Bxterior footings and foolings beneath unheated areas should be provided
with adequate soíl cover above their bearing olevation for ûost protection.
Placement of foundations at least 36 inches below exterior grade is
tlæicallywed-rn'tltir¡'area. A shallowet.fdotin¡iprbleðfeil-fr-oiñ fi'odtwith '-
insulation, dosigned in accordånce with the Intemational Building Code
could also be constructed.
4) Continuous foundation walls ¡hould be reinforced top and bottom to span
local anomalÍes such as by assumirrg anunsupported length of at least 10
feet. Fou¡rdation walls acting as retaining skucturæ should also be
desþed to rosist lateral a lateral earth prossure conesponding to an
equivalent fluid unit weigþt of at least 45 po[,
5) All existing fill, topsoil; sandy clny in tho tri-plex excavation and any loose
or disturbed soils should bo removed and the footing bearing level
oxtended down to the retatively donse natural granular soils. The exposed
soils in footing area.should thcn be moistened and compacted. If water
seepage is encountered, the footing areas should be dewatered before
concrete placement.
6) A representativc of the geotechrúcal engineer should observe all footing
excavations príor to sonorete placemont to evaluato bearing conditions.
JobNo. l13459A cåFtecn
-6-
FLOOR STABS
The naturål on-site soils, exclusive of topsofl, are suitable to zupport lightly loaded slab-
on-grade conshuctíon, To reduco the effects of some differcntial movement floor slabs
should be soparatod from all bearing walls and columns with expaneion joints which
allow unrestrained vortical movçmbnt. Floor slab conhol joints ehould be ueÊd to reduce
damags due to shrínkage cracking, The requiremeuts for joint spacing and slab
reinforcement shouldbe o$tûblished by ths designer'basod on experiÊnce and the intended
slab use. A minimum 4 inch layer of free-draining gravol should be placed beneath slabs
to provide a break for capillary moisture rise. This material should consist ofminus 2
ínch aggegate with at least 50% retained on the No. 4 sieve and less than 2% passing the
No.200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum ståndard Prostor density at a moisture contcnt near optimum. Required fill can
consist ofthE on-site granular soils devoid ofvegetation, topsoil and ovçrsized rock.
UNDBRDRAIN SYSTEM
Allhougb fræ water was not encountered during our oxploration, it ha¡ been our
orperienog ínmountainous aroas that looal perched groundwator can develop during timoa
of hoavy precipitation or seæonal runoff. Frozen gpund during $pr¡ng nrnoffcan'create
a perched oondition. lVe recomnend below-grade consfucfion, such as rotaining walls
and øawlspaco areâs, be protected from wetting and hydrostatic pressruo buildup by an
under'drain system,
The drains should consist of drainpipe placed in the boftom of the watl backfill
sunoundod above ile invort lsvel with fiee-draining granulãr material. Ths dlain should
be placed at each levcl of excavation âtrd at least I foot below lowost adjtcent finieh
gradeandslopedataminimuml%toasuitablcgravityoutlet. Free-draíninggranular
mateúal usod in the undordrain systern shoulct contain less than Za/o passnglhe No; 200
Job No, 1134594
7-
siove, less than 50% pæsing the No. 4 sieve and have a maxinrum size of 2 inches. The
drain gravel bacldlll should be at least lVz faetdeep.
SUR¡'ACE DR.A.INAGE
The following drainage precautions should be observed during construction and
maintained at all times ¿fter thebarn addition and ûi-plex have been completed:
1) Inundation ofths foundatÍon excavations andunderslab arcas ¡hould be
avoided during consffuctior
2) Exterior backfill should be adjusted to near optimum moisflue and
compactod to at loast 95% of the maximum standard Proctor density in
pavement and slab areæ and to at least 90% of the maximum standard
Prcctor.dçnsiþ in landscape fi€as.
3) The ground zurfacc sunoundiug the exterior of the building should be
sloped to drain away from the foundation in all dirootions' lVe
reoommond a minimum slope of 6 iuches in the.first I 0 feet in unpaved
a¡eas and a minimum slopo of 2% rnches in the first 10 feet in paved areas'
Free-draining wall backfill should be capped with about 2 feet ofthe on-
' site soils to reduce surface water infilkation'
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
LIMfTATIONS
This efudyha¡ been conducted in accordsnce with generally accepted geotechnical
engineeringprinciples and practices ln this area at this tìme. We make no warranty either
sxpress or implied. The conclusions füd resommendations submitted in this report are
based upon the data obtainod from the exploratory borings drilled at tho locations
indicated on Figuro 1, tho proposed t¡rye of constx¡ction and our expedencs in the ârea.
Our services do not include dctermining the præoncE prevention or possibility of mold or
other bíological contamÍnants (MOBC) developing in the fiiturç. If the client is
JobNo. l13459A e&Stecn
8-
conc€rned about MOBC, then a professional in this special field of practice should be
consulted. Our {indings include intetpolation and exkapolation of the subsurface
conditions identified at the exploratory borings and variations in the subsurface
conditions may not become evident until excavation is performed, If conditions
encountered during conshuction åppeâr different from those described in this repoft, we
should be notified so that re-evaluation of the recommendations maybe made.
Tlús report has been prepared for the exclusive use by our client for design purposes. 'We
are not responsible for technical interpretations by others of our information. As the
project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
veriff that the tecommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the rccommendations
præented herein, We recommend on-site observation of excavations and foundation
bearing shata and testing of struetural fill by a.represerrtative of the geotechnical
engineer.
Respectfu lly Submitted,
- PAV/LAK GEOTECHNICAL, INC.
Louis E. Eller
Reviewed by:
Hardin, P.E.
LEE//ksw
Job No. 113459Â c#fracrr
COUNTY ROAD lOO 6280
L--(
I
I
PROPOSED
TRI.PLEX
(SHADED)
BORINGs
ËXISTING
BARN
EXISTING
utoEä$ut
Ëä
#ã>É,EH
#P<
'\lErorll
HEto u¡
-*-\GARAGE
*-\ *_{Ílb---\-.\
I
I
I
I
t
I
II
I
I Ð(sïtNG
BESIDENCË
(I
\*-t/
6'e¡6
cil¡tã1-f<at
ä3d8
TFQlz-.trÈ
Ed
Hr
ıËU te,
E¡Omo
\-*
a r
I
I
I
I
I I
I
o IIt
PROPOSED L-J
BARNADDITION
(sHADËD)
APPROXIfì,4ATE SCALE
1o = 80'
1
EXISTING
BARN
EXISTING
INDOOR
ARENA
I
I
1 18 4594 LOCATION OF EXPLORATORY BORINGS Figure 1
BORING 1
ELEV,* 99.2'
BORING 2
ELEV.= 97.2'
BORINGS
ELEV.= 6278.6'
BORNq 4
ELF/.:6275.9'
0 0
416,12ß
WC-18.3
DD*109
67112
WC=2,9
+4-6fl
-200-7
10112
WC='|6,8
-200-56
ilï,1510
wc=7.0
-200*66
Ë
'rI.c
Þ..tto
5 ï 65/12 5
ü)
Ê
I.c
r:-(l,cl
10 10
BARN ADDITION TRI"PLEX
Note: Explanation of symbols ls showrt on Figure 3.
Flgure 2LOGS OF EXPLORATORY BORINGS1 13 4594
CLAY (CL); sandy, sllty, medlum stiff, molst, reddlsh brown to brown.
m
H
n
ffi
F
I
T
LEGEND:
FILL; olayey silty sand and gravolwith cobbles, loose, molst, mixed browns. About 6 inúes of road base above
fill at Boring 3.
TOP$OIL; organlc sandy clay and silt, firrn, molst, dark brown.
GRAVEL, COBBLES AND BOULDERS (GM-GP); oandy, sllghtly sllty lo slfty, {ense, molst, brown, subrounded
rocke,
Relatlvely undisturbed drive sarnple; 2-inoh l.D. California llner sample.
Drlve sampfe; standard penetration test (SPÐ, 1 3/8 lnch f.D. sptlt spoon sample, A$TM t)-1S86.
ùive sample blow count; indicatee thät 57 blows of a 140 pound hammer falling 30 lnches were
Ðtt t'¿ required to drive lhe Callfornia or SFT sampler 12 fnches.
Practical drllllng refusal. Where shown above bottom of log, indioates that multiþle ãttempts wêre
made to advanceihe boring.
NOTE$:
1, Exploratory borlngs were drllled on December 11, 2013 with 4-inch dlametèr contínuous flight powor augor.
2. Locallons of exploratory borings were measured approximately by pacing from featuree shown on the slto plan
provlded.
3. Elevatlons of exploratory borlngs wore measured by instrumênt leveland refer to the Bonch Malks shown on Ëlgure
I
4, the exploratory boilng locallons.and elevations should be coneldered aocuato only to thê degme lmplfed by tho
method used.
6. The llnes bôtwesn matorlals shown on th6 sxploratory borlng loge rêpresênt the approxlmate boundàriss beMeen
materlal typee and transitlons may bs gradual,
6. No free wat€r was €ncounter€d ln tho botlngs at the lime of drilllng. Fluotuatlon ln water level may occur wlth tlme.
7. l-aboratory Teoting Results:
WC = Water Contênt (%)
DD = Dry Density (pcf)
+4 = Perçent retained on tha No, 4 Blêve
{00 = Petcent passíng No.200síeve
113 4694 LEGEND AND NOTES Flgure 3
Moisture Content * 'lB.3
Dry Denslty : l0g
$ample of: gsn6t $ltyClaY
From: Borlng 1 at 2 Feet
percent
pcf
No rnovsmenl
upon,Ρiettlng7
L
\
\
ì
\)
o
1
s
co'ø
1t,
0)
o-
EoO
2
g
4
5
0.1 10 100
APPLIED PRESSURE - ksf
1.0
1 13 4594 SWELL-CO NSOLI DATI ON TEST RESU LTS Figure 4
7HH
r5MlN,
ÌIMERÈAOINGE U.S. STANDARDSERIES OPENINGS
#8 #4 Etsil 314'. 'l 1t2', 3'| 5'6' s 100
00
Ê0
70
00
60
4A
30
20
10
ô
H4û
RF-
l¡JÉ,
t- 60zIÊ,l!(L60
oz6ln
0-
þzh,oË.
l¡J0-
0
.001 ,002 ,006 .009 .01Ð .0ft7 ,074 .160 .000 t.18 U.36 4,7ı 37,ı
DIAMETËR OF FARTICLES lN lvlltl-MffERS
ct¡Yï0tlr coÐ$e
GRAVËL 63 %SAND 80 o/o SILTANDCIAY 7 %
LIOUÍD UMIÏ %PI.A$TICITY INDEX IO
FROM; Borlng 2 al?lzFeelSAMPLE OFr Sllgrhtly Sllty Sandy Gravol
Figure 51 13 4594 GRADATION TEST RESULTS
H EPWORTH-PAWIAK GEOTECÏ NICAL, INC.
TABLE 1
SUMMARY OF I.ABORATORY TEST RESULTS
Job No. 113 4594
SAMPIE fI:ÀTlrlf NANRAL
üOIsruRE
CO'{TENT
(v^\
NATURAL
DRY
DENSITY
fEdl
GRÁDAÎIÍ'I{PERGI{1
PASS¡NG
ùp.200
SIEI'E
ÀTTËNI UMIIS t¡¡CO¡,¡FINED
coilPRESS¡ìÆ
STRENGTH
tp_qn
SOIL OR
BEDROCKTYPEBOR¡NG DEPIH
tfrl
GRAì/EL
(%)
SAND
(%)
UQUIÞts4Í
lvâl
Pt¡sfrc
¡NDÞ(
I 2 18.3 109 Sandy Silty Ctay
2 21t2 2.9 63 30 7 Süehüy Silty Sady Gravel
3 I 16.8 56 SiltySaldy Clay -Fill
4 1 7,0 66 Sandy Silty Clay