J Caliber Construction,Inc. April 16,2021
P.O. Box 178
Silt. CO 8ló52
ATTN: Mr. Jose Con.zalez
RE Haderlie Residence
6801 County Road 233
Rifie, CO
*Field Inspection
Permit #BLRE-08-20-6450
Dear Mr. Gonzalez,
As requested, structural steel special inspection was conducted per the IBC 2018
Edition - C'hapter l7: Structural Tests and Special Inspection and the Garfield County
requirements. I arrived on-site at 8:30 AM. I met with you to review project requirements
and material ready for inspection. The steel fabricator and erector for this project is
Garfield Steel and Machine, Inc. (GSMI) in Rifle, Colorado. Prior to our arrival. we
reviewed copies of the welding procedure specifications (WPS) and the welder
certification test repCIrts (WQTR) and all were observed to be acceptable with project
requirements. Copies of reports are on file with Mr. I,yle Inman with GSMI.
Visual welding inspection was conducted on all levels of the residence. I observed
the construction clip to beam fìllet welds, glue-lam bucket to beam fillet welds, and the
shop welded fillet welds. Upon completion, I observed all fillet welds to be in compliance
with project specifications and the inspection criteria as stated in Clause 6 of the AWS
Dl.l Welding Code - Steel: 201 5 Edition.
High strength bolt inspection was conducted on all levels of the residence. I
observed all bolts tobe 3/q" & %" AS'IM 4325 plain body bolts with a hardened flat
washer properly positioned under the turning surface of a heavy hex nut. All bolts were
checked with a w¡ench for hand tight (HT) conditions as required per project
specifications. During my inspection, I observed 2 bolts that were too short to fully
engage the nut threads as required. These were replaced immediately by you on site.
Upon completion, I observed all bolts to be in compliance with project specifications and
the inspection criteria of the American Institute of Steel Construction (AISC) Research
Council on Bolted Connections (RCBC).
Studio M Engineers. LLC
Structural Engineering Consultants
lnnovatíon By P erception
www.m ben gineering.elementfx.com
studiom.engineer@gmail.com
October 15,2020
Re: Tract 37 Antlers, Orchard Development Silt CO
To Whom It May Concern:
I inspected the rebar layout for the cast in place concrete walls for the project at the above
address on Tuesday October 6th. With a few minor exceptions that were addressed in the
field, the forms and rebar were checked, and found to be, in general compliance with the
plans issued by my office dated September 21,2020.
The exceptions were
L An additional #5 longitudinal bar was put in the bottom of the wall on Grid 4
because of a large boulder conflicting with the reinforcement on the south west
corner.
2. The corner reinforcement at the North West and East corners was not installed.
Reference Detail B/S2.0.
Site visits, field observations and framing and foundation inspections made by Studio M
Engineers, LLC whether included in the basic scope of service or not, do not make Studio
M Engineers, LLC responsible for warranting or approving (expressed or implied),
directing, or superintending the contractor's work, means or methods of work, safety in,
on or near the work site, timeliness in performance of the work, nor any other aspect of
construction for which the contractor has responsibility. Site visits are for project
administration, assessment, observation or testing will not relieve the contractor of its
responsibilities for performing the work in accordance with the project plans and
specifications.
The final foundation inspections and approval sign-off shall be performed by the
Governing Building Department, without exception.
Respectfully,
W/ç*r"o¡iÅi'i
a z5o Tripp Drive a Rifle a Colorado a 8t65o .97o-366-869o .
Studio M ineers^ [,T,C
Structural Engineering Consultants
lnnovatíon By P erceptíon
www.mbengineering.elementfx.com
studiom.engineer@gmail.com
October 6,2020
Re: Tract 37 Antlers, Orchard Development Silt CO
To Whom It May Concern:
I inspectecl the rebar layout for the footings for the project at the above address on
Tuesday October 6th. The forms and rebar were checked, and found to be, in general
compliance with the plans issued by my office dated September 21,2020.
Site visits, field observations and framing and foundation inspections made by Studio M
Engineers, LLC whether inclucled in the basic scope of service or not, do not make Studio
M Engineers, LLC responsible for warranting or approving (expressed or implied),
directing, or superintending the contractor's work, means or methods of work, safety in,
on or near the work site, timeliness in performance of the work, nor any other aspect of
construction for which the contractor has responsibility. Site visits are for project
administrationo assessment, observation or testing will not relieve the contractor of its
responsibilities for performing the work in accordance with the project plans and
specifications.
The final foundation inspections and approval sign-off shall be performed by the
Governing Building Department, without exception.
Respectfully
W/q*r,Þ
'Y't
0 t.lc
/0i!ÞL
z5o Tripp Drive a Rifle a Colorado a 8165o "97o-366-869o .
HADERLIE RESIDENCE
GARFIELD COUNTY, CO
SHEET:
1 ,A
STUDIO M TNGINTERS, LLC
STRUCTU RAL CONS U LTANTS DRAFTED BY: MJts
DESIGNED ðY: MJts
DATE: lA.l.2O2O
SCALË: A5 SHOWN
25O TRPT DRVE
RIFLE
coLoRADO A t 65c.
970-366-6G90
È.rlC 11C
|/-s
v
\:J D
t "-
¡'iÀ1.
Í
flr! la
-.o.w
T.o.W
go'-a.
F*_¡
ot
+
T.O.F
89'-6',T.O.\V
ga'-o'
1.4"?tÊR
90'.4.
¿Â,-e"
T
14'-6 3/4'
'r.o.91ÉR rft
t
T.Ö.F
86'.6'
t 1.4.F
86'.6',
1a'-1/8',
I
G)2r+-V
FCUNDATICN PL-AN
\l ,j
I J
6J P lltì_*ı* _ _.r
frÐ
@ DAOR 13'-g1/g' &9''3', +C.¡
T.O.\V.
NT9
PI-AN NORTH
GEOTECHNICAL AND MTN¡NG ENGTNEERING
TESTING AND INSPECTION SËRVICES
CAPSTONE
ENTERPRfSES
óIE PARIEE DRIVE
GRAND JUNCTION, CO 8¡50¿
PHoNE (970) 250-¡55r
WEST,LLC .
ro/s/20
Job Number 4546
Jose Gonzales
J Caliber Construction
Rifle, CO
Re: Open Hole lnspection, Lot37, Antlers Orchard
Capstone enterprises West, LLC (Capstone) inspected the foundation excavation at Lot 37 in the Antlers
Orchard Subdivision. The base of the excavation was sandstone bedrock. These materials were as
anticipated form the original geotechnical report performed by Capstone.
Capstone recommends that the excavation be cleared of any loose rock, to prevent rock pockets in the
concrete footer. The concrete can be placed directly on the cleaned sandstone surface.
This bedrock is suitable for foundations designed with a maximum bearing load of 4,000 psf.
Please let me know if I can be of any further assistance.