Loading...
HomeMy WebLinkAboutSpecial Inspection ReportsTHUI{DER MOUIYTAIN TESTII{G 2970 N. Ronlin Avenue / Grand Junctionn Colorado 81504 Cetl (970) 210-7008 / Fax (970) 314-7067 E-Mail: th u ndermountaintesting@gmail.com www.th u ndermou ntain testin g.com J Caliber Construction,Inc. April 16,2021 P.O. Box 178 Silt. CO 8ló52 ATTN: Mr. Jose Con.zalez RE Haderlie Residence 6801 County Road 233 Rifie, CO *Field Inspection Permit #BLRE-08-20-6450 Dear Mr. Gonzalez, As requested, structural steel special inspection was conducted per the IBC 2018 Edition - C'hapter l7: Structural Tests and Special Inspection and the Garfield County requirements. I arrived on-site at 8:30 AM. I met with you to review project requirements and material ready for inspection. The steel fabricator and erector for this project is Garfield Steel and Machine, Inc. (GSMI) in Rifle, Colorado. Prior to our arrival. we reviewed copies of the welding procedure specifications (WPS) and the welder certification test repCIrts (WQTR) and all were observed to be acceptable with project requirements. Copies of reports are on file with Mr. I,yle Inman with GSMI. Visual welding inspection was conducted on all levels of the residence. I observed the construction clip to beam fìllet welds, glue-lam bucket to beam fillet welds, and the shop welded fillet welds. Upon completion, I observed all fillet welds to be in compliance with project specifications and the inspection criteria as stated in Clause 6 of the AWS Dl.l Welding Code - Steel: 201 5 Edition. High strength bolt inspection was conducted on all levels of the residence. I observed all bolts tobe 3/q" & %" AS'IM 4325 plain body bolts with a hardened flat washer properly positioned under the turning surface of a heavy hex nut. All bolts were checked with a w¡ench for hand tight (HT) conditions as required per project specifications. During my inspection, I observed 2 bolts that were too short to fully engage the nut threads as required. These were replaced immediately by you on site. Upon completion, I observed all bolts to be in compliance with project specifications and the inspection criteria of the American Institute of Steel Construction (AISC) Research Council on Bolted Connections (RCBC). Studio M Engineers. LLC Structural Engineering Consultants lnnovatíon By P erception www.m ben gineering.elementfx.com studiom.engineer@gmail.com October 15,2020 Re: Tract 37 Antlers, Orchard Development Silt CO To Whom It May Concern: I inspected the rebar layout for the cast in place concrete walls for the project at the above address on Tuesday October 6th. With a few minor exceptions that were addressed in the field, the forms and rebar were checked, and found to be, in general compliance with the plans issued by my office dated September 21,2020. The exceptions were L An additional #5 longitudinal bar was put in the bottom of the wall on Grid 4 because of a large boulder conflicting with the reinforcement on the south west corner. 2. The corner reinforcement at the North West and East corners was not installed. Reference Detail B/S2.0. Site visits, field observations and framing and foundation inspections made by Studio M Engineers, LLC whether included in the basic scope of service or not, do not make Studio M Engineers, LLC responsible for warranting or approving (expressed or implied), directing, or superintending the contractor's work, means or methods of work, safety in, on or near the work site, timeliness in performance of the work, nor any other aspect of construction for which the contractor has responsibility. Site visits are for project administration, assessment, observation or testing will not relieve the contractor of its responsibilities for performing the work in accordance with the project plans and specifications. The final foundation inspections and approval sign-off shall be performed by the Governing Building Department, without exception. Respectfully, W/ç*r"o¡iÅi'i a z5o Tripp Drive a Rifle a Colorado a 8t65o .97o-366-869o . Studio M ineers^ [,T,C Structural Engineering Consultants lnnovatíon By P erceptíon www.mbengineering.elementfx.com studiom.engineer@gmail.com October 6,2020 Re: Tract 37 Antlers, Orchard Development Silt CO To Whom It May Concern: I inspectecl the rebar layout for the footings for the project at the above address on Tuesday October 6th. The forms and rebar were checked, and found to be, in general compliance with the plans issued by my office dated September 21,2020. Site visits, field observations and framing and foundation inspections made by Studio M Engineers, LLC whether inclucled in the basic scope of service or not, do not make Studio M Engineers, LLC responsible for warranting or approving (expressed or implied), directing, or superintending the contractor's work, means or methods of work, safety in, on or near the work site, timeliness in performance of the work, nor any other aspect of construction for which the contractor has responsibility. Site visits are for project administrationo assessment, observation or testing will not relieve the contractor of its responsibilities for performing the work in accordance with the project plans and specifications. The final foundation inspections and approval sign-off shall be performed by the Governing Building Department, without exception. Respectfully W/q*r,Þ 'Y't 0 t.lc /0i!ÞL z5o Tripp Drive a Rifle a Colorado a 8165o "97o-366-869o . HADERLIE RESIDENCE GARFIELD COUNTY, CO SHEET: 1 ,A STUDIO M TNGINTERS, LLC STRUCTU RAL CONS U LTANTS DRAFTED BY: MJts DESIGNED ðY: MJts DATE: lA.l.2O2O SCALË: A5 SHOWN 25O TRPT DRVE RIFLE coLoRADO A t 65c. 970-366-6G90 È.rlC 11C |/-s v \:J D t "- ¡'iÀ1. Í flr! la -.o.w T.o.W go'-a. F*_¡ ot + T.O.F 89'-6',T.O.\V ga'-o' 1.4"?tÊR 90'.4. ¿Â,-e" T 14'-6 3/4' 'r.o.91ÉR rft t T.Ö.F 86'.6' t 1.4.F 86'.6', 1a'-1/8', I G)2r+-V FCUNDATICN PL-AN \l ,j I J 6J P lltì_*ı* _ _.r frÐ @ DAOR 13'-g1/g' &9''3', +C.¡ T.O.\V. NT9 PI-AN NORTH GEOTECHNICAL AND MTN¡NG ENGTNEERING TESTING AND INSPECTION SËRVICES CAPSTONE ENTERPRfSES óIE PARIEE DRIVE GRAND JUNCTION, CO 8¡50¿ PHoNE (970) 250-¡55r WEST,LLC . ro/s/20 Job Number 4546 Jose Gonzales J Caliber Construction Rifle, CO Re: Open Hole lnspection, Lot37, Antlers Orchard Capstone enterprises West, LLC (Capstone) inspected the foundation excavation at Lot 37 in the Antlers Orchard Subdivision. The base of the excavation was sandstone bedrock. These materials were as anticipated form the original geotechnical report performed by Capstone. Capstone recommends that the excavation be cleared of any loose rock, to prevent rock pockets in the concrete footer. The concrete can be placed directly on the cleaned sandstone surface. This bedrock is suitable for foundations designed with a maximum bearing load of 4,000 psf. Please let me know if I can be of any further assistance. Res pectfu lly su bmitted, Martin W. Chenoweth P.E. Capstone Enterprises West, LLC 97784