HomeMy WebLinkAboutApplicationGarfield County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81501
1s701945-82t2
www.garfield-counw.com
WPE OF CONSTRUCTION
ulti-Fam Demolition
Manufactured Home or Multi-Level)
r Townhome)Complete unfin¡shed port¡on of basèment Reroof
UM SIZE OF I,OOO SQUARE FEET
Darell Gene Lantz Phone:970 319-3574 -
634 Battlement Creek Trail, Battlement Mesa CO 81635
ilv
r INVOIVED PARTIES
Property Owner:
Maillng Address:
Email Address:dglokie@gma¡l.com
Contractor: Self dexception of electrical and plumbing phone: { )
Mailing Address:
EmailAddress:
Architect: ñâ Phone:
Mailing Address:
Email Address:
Engineer: na Phone:
Mailing Address
EmailAddress:
Manufactured Home fnstalier:nâ Phone
Mailing Address:
EmailAddress:
PROJECT DETAITS
Describe Work:Complete unfinished portion of basement (aprox 825 sq. ft.)
ç\I
Job Address:634 Battlement Creek Trail, Battlement Mesa CO 81635
Assessor'sParcetNumber: 240708203017
,ug. Batttlement Creek Village Section 1 Lot 17 elock 2
Owne/s Valuation of Work:20,000.00 Property Size (Sq. Ft. or Acres):
# of Floors;3--
1.08
Sq. Ft. of Building:4,332
Class of Work:
Height:ranch w¡th w/o basement
Additíon
Gara8e:3 a¿¡Attached
Remodel/Alteration
Detached
] PROJECT DETAIIS CONTINUED
Septic:Community
Type of Heat:Natural Gas e Electric Other
Driveway
Permit:
Permit #:
NOTICI
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described ábou",
oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby
the Owner, must be provided with this Application.
Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division,
Other Perm¡ts. Multiple separate permits may be required: (1) State Electr¡cal Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes nulland void íf the work authorized is not commenced wíthin 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Applicatíon and that the information contained above is tiue anO corièài. t
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilíties detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Build¡ng Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Buílding
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Buíldíng Permit may be suspended or revoked, upon notice from the County, if the locat¡on, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Buílding Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
de¡ign er, engineer an builder
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the requ¡red information which is correct and accurate to the best of my knowledge.
Dargll Gene LanÞ 9t23t2021
Property Owner Print and Date
oFFrcrAt usE oNtY Pd.l loo.'o CK {Ê 29ø6 tôy'r/aozt iÉ,È
Special Conditions:
Adiusted Valuation:
d'|-tgø,oa
Plan Check Fee:
# loö,ffi
Permit Fee:
6r.12l,66
Manu. Home Fee:
ñ /,r
Misc. Fees:
Þn.u-s Rl f
Tota/Fees:
öÉ1t.56
Fees Paidrt loo .o'Balance Due:
#4L1,55
BP No:
tsuse- 1t18
OWTS No:
COrrrrtU¡l tr/
Setbacks:Nltu
OCC Group:
tl¿c_
Const. Type:
lR- ¿
Zoning:
"UDI
lzh;h /o.22- 2lBUITDING / PTANNING DIVISION :
Signed Approval Date
Gørfield County
BUILDING DEPARTMENT
1.08 Eighth Street, Su¡te 40L, Glenwood ,prîngs, CO 87607
Tel: (970) 945-8212
PLAN REV IE W CHECK L rsT
Permit No: B1-(É - lfuzl-7 t78
Building lssues Pla n n ing / Zoning lssues
N4
fUA
t/
t/
t/
NA
t/
t/ Plan Reviewer to Sign Application
Parcel/schedule No
40# Snowload Letter - Manu. Homes
Engineered Foundation
Driveway Permit
Surveyed Site Plan
Septic Permit and Setbacks
Grade/ TopograPhY 30%
Attach Residential Plan Review List
Subdivision Plat Notes
Fire DePartment Review
Valuation Determination/ Fees
Red Line Plans/ StamPs/ Sticker
Attach Conditions l
Application Signed ì
NA Frood Ptain
t/
Building Height
Zoning Sign-Off
Road lmpact Fees
Grade/ Topography 40%
Planning lssues
Subdivision Plat
t"/
NA
NA
A
,/
t'/
Property Líne Setbacks
3O ft, Stream Setback
Description & Summarv:
9oolo
N A soils Report
',Tar*ial ba*rrwb
h'nish onty
825 $,¡ baærytu,b x VV, bØ= 2yr7 & blo
6xte*in2 hono 7Z/'{Ø4 /
yesüd Kt tr crd,F o(
þ48il (s,ø,>ò,
rbt Hd,h'o,2l o rt/es no $/"1Áu
'0't Ør
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wallschedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO wilfUe considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
9Az,/zo¿ t
Property Print and Dãté-
o
a