HomeMy WebLinkAboutApplicationGurfteld County
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
l97O)94s-82t2
www.garfield-countv.com
BUILDING PERMIT
APPLICATION
TYP.E OF CONSTRUCTION
Commercial/Multi-Family Demolition
Manufactured Home (Single or Multi-Level)
I Residential (SF, Duplex or Townhome)Reroof
Accessorv Dwellins Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET
INVOLVED PARTIES
Property Owner:
Mailing Address:
Maura Trumble Phone:(308 )760-1726
215 Donegan Road, Glenwood Springs, CO 81601
Email Addresr. mtrumble@ccyarchitects.com
Contrãctor:AML Construction - Luis Hernandez phone:t970 )309-7331
Mailing Address 1247 Hollybrook Lane, Glenwood Springs, CO 81601
Email Address:amlconstructioni nc@hotmail.com
Architect: Maura Trumble Phone: { 308 \760-1726
Mailing Address 215 Donegan Road, Glenwood Springs, CO 81601
Email Addresr. mtrumble@ccyarchitects.com
Engineer:Dan Doherty Phone:(970 \927-5174
Mailing Address 215 North 12th St, Unit E Carbondale, Colorado 81623
EmailAddress:ddoherty@klaa.com
Manufactured Home lnstaller Phone:
Mailing Address
Email Address:
PROJECT DETAILS
Describe Work:structural repairs of floor framing over crawlspace, and interior remodel of fìnishes in same area
Job Address:215 Donegan Road, Glenwood Springs, CO 81601
Assessor's Parcel Number:
sub. NA
21 1 934300031
Lot
--
Block
owner's Valuation of Work: S 49'000 Property Size (Sq. Ft. or Acres):
Sq. Ft. of Building:850 Height:12'# of Floors: 1
24,742 SF
Class of Work New {Remodel/Alteration Addition
Garage:ched Detached
PROJECT DETAILS CONTINUED
Septic:OWÏS I Community
Type of Heat:I Natural Gas Propa n e E I ectri c Other
Driveway
Permit:
pt Permit #
NOTICE
Authoritv. ThisapplicationforaBuildingPermitmustbesignedbytheOwnerof theproperty,describedabove,
oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby
the Owner, must be provided with this Application.
Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to constructthe structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, lagreethat land myagentswill
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of thestructure(s) and facility(ies), described above, are not in compliancewith County Regulation(s) orany
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiringthe correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
designer, engineer and/ or builder.
I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have
provided the uired in n hich is correct and accurate to the best of my knowledge.
lô-våù\t
Prope Owner Pr and Sign Date
,ôOFUSE ONLY ?d ,ôsrtl t.g? c .T
"þ2t
Special Conditions:
Adiusted Valuatioh:
âua./)Ø. Ø Plan Check Fee
¿/./1, g7 Permit Fee
633" /r5 Manu. Home Fee:u/n Misc. Fees: -.NÆ
tótal rées:
þ t,0,16 ,6?-
Fees'Éaid
$.'{lt.¡r
Balance Due: . {
Ç¡oaQ (N 8r-R.€ "HlLlBP No:OWTS No:
H/,t
Setbácks:N/A OCC Group:
tÍLe
Const. Type:
l€.€
Zoning:n/¿
/r¿ø*%/r/h /0,21,BUTLDtNG / PLANNTNG DTVIStON
Signed Approval Date
CK / 3ç5
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold untilthe required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
lo-V-2ozl
Pro Print and Sign Date
a
a
rty