Loading...
HomeMy WebLinkAboutApplicationGurfteld County Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 l97O)94s-82t2 www.garfield-countv.com BUILDING PERMIT APPLICATION TYP.E OF CONSTRUCTION Commercial/Multi-Family Demolition Manufactured Home (Single or Multi-Level) I Residential (SF, Duplex or Townhome)Reroof Accessorv Dwellins Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET INVOLVED PARTIES Property Owner: Mailing Address: Maura Trumble Phone:(308 )760-1726 215 Donegan Road, Glenwood Springs, CO 81601 Email Addresr. mtrumble@ccyarchitects.com Contrãctor:AML Construction - Luis Hernandez phone:t970 )309-7331 Mailing Address 1247 Hollybrook Lane, Glenwood Springs, CO 81601 Email Address:amlconstructioni nc@hotmail.com Architect: Maura Trumble Phone: { 308 \760-1726 Mailing Address 215 Donegan Road, Glenwood Springs, CO 81601 Email Addresr. mtrumble@ccyarchitects.com Engineer:Dan Doherty Phone:(970 \927-5174 Mailing Address 215 North 12th St, Unit E Carbondale, Colorado 81623 EmailAddress:ddoherty@klaa.com Manufactured Home lnstaller Phone: Mailing Address Email Address: PROJECT DETAILS Describe Work:structural repairs of floor framing over crawlspace, and interior remodel of fìnishes in same area Job Address:215 Donegan Road, Glenwood Springs, CO 81601 Assessor's Parcel Number: sub. NA 21 1 934300031 Lot -- Block owner's Valuation of Work: S 49'000 Property Size (Sq. Ft. or Acres): Sq. Ft. of Building:850 Height:12'# of Floors: 1 24,742 SF Class of Work New {Remodel/Alteration Addition Garage:ched Detached PROJECT DETAILS CONTINUED Septic:OWÏS I Community Type of Heat:I Natural Gas Propa n e E I ectri c Other Driveway Permit: pt Permit # NOTICE Authoritv. ThisapplicationforaBuildingPermitmustbesignedbytheOwnerof theproperty,describedabove, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to constructthe structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, lagreethat land myagentswill comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of thestructure(s) and facility(ies), described above, are not in compliancewith County Regulation(s) orany other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiringthe correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the uired in n hich is correct and accurate to the best of my knowledge. lô-våù\t Prope Owner Pr and Sign Date ,ôOFUSE ONLY ?d ,ôsrtl t.g? c .T "þ2t Special Conditions: Adiusted Valuatioh: âua./)Ø. Ø Plan Check Fee ¿/./1, g7 Permit Fee 633" /r5 Manu. Home Fee:u/n Misc. Fees: -.NÆ tótal rées: þ t,0,16 ,6?- Fees'Éaid $.'{lt.¡r Balance Due: . { Ç¡oaQ (N 8r-R.€ "HlLlBP No:OWTS No: H/,t Setbácks:N/A OCC Group: tÍLe Const. Type: l€.€ Zoning:n/¿ /r¿ø*%/r/h /0,21,BUTLDtNG / PLANNTNG DTVIStON Signed Approval Date CK / 3ç5 Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. lo-V-2ozl Pro Print and Sign Date a a rty