HomeMy WebLinkAboutApplicationGurfield Coanty
GRADING PERMIT
APPLICATIONCommunity Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
19701945-82L2
www. ga rfield-cou ntv.com
WPE OF GRADING t-tr MAJOR Fl MrNoR
INVOTVED PARTIES
Property owner: AsPen Glen E3, LLC ptone, F70 )300-0123
Mailing Address: 310 Market St. Basalt, CO 81623
Emait Addrerr. jkrabacher@sah.com
contractor: Peak3 Construction Phone: PZ9-l 948-6166
Mailing Address 310 Market St. Basalt, CO 81623
EmailAddress:B ryant@peak3aspe n. co m
Architecr: Mata Design Company pton", P70 )
274-6011
Mailing Address: P.O. Box 189 - Carbondale, CO 81623
EmailAddress:matadesign@mac.com
Engineer:Kingdom E ngineering, LLC pt on", P70 )
741-4196
Mailing Address 5043 E. Cherry Creek South Dr. Denver CO, 80246
EmailAddress . Thomas.kingdom@gmail.com
PROJECT NAME AND TOCATION
Project Na As Glen - E-3
Describe Work:Ground up, new construction home. Tap ¡n-to utilities and dig
for foundation work.
rob Address. 505 E Diamond A Ranch Road. Carbondale CO.
Assessol's Parcel Number: 476330
,r5. Aspen Glen ¡-ot E-3 _Block
Earthwork (square feet).26,379 Earthwork (Cubic Yards):
Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, or
anauthorizedagent. lfthes¡gnaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedbythe
Owner, must be provided with this Application.
lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Permits. Multiple separate permits may be required: (L) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or
a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 1.80 days of
the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICATION
ALL UTITITIES MUST BE LOCATED PRIOR TO ANY GRADING
NOT¡CE
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the
Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply
with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS
regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit
may be suspended or revoked, upon notice from the County, ifthe location, construction or use ofthe structure(s)
and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction
or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law.
Review of this Application, including submittals, and inspections of the work by the Building Division do not
constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the
Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations
rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or
builder.
I hereby acknowledge that I have read and understand the Notice and Certification above as well as
have provided the required information which is correct and accurate to the best of my knowledge.
ùr¡)ói¿t /ù-21-
Property Owner Print and Sign Date
I
oFFlclAt usE oNLY Pá. + I O('.oa Ç'Çt tofttl'-.Lt æ
Soecial Conditions:JPçLrqrLvrrurrrerr)¡
7rzæ/ at a¿¿¡p. søþe& ?b
,óu ù/n7 f€rmÉ revþt¿ (B/RE- /o-z/- Tz4
Permit Fee:dloo,o'Misc Fees:Total Fees:
f loo.'o
Fees Paid:
4loo,¿"
Balance due:4F Grading Permit:
oRAÞ - 72zl
Issue Date:
ß
Ffir '6'çt, e¡, ern
S' : $ t " t a 6 'É
Zoning:
P" y'. Þ'
/0,28,BUITDING / PLANNING DIVISION
Signed Approval Date