Loading...
HomeMy WebLinkAboutOWTS Installation Observations 10.31.20212789 Riverside Parkway Grand Junction, Colorado 81501 Phone: 970-255-8005 Info@huddlestonberry.com October 31, 2021 Project#02266-0006 Factory Direct Housing 2302 Highway 6 & 50 Grand Junction, Colorado 81505 Attention: Mr. Jon Ford Subject: OWTS Installation Inspection Parcel 217903400012 Silt, Colorado Reference: OWTS Design, Parcel 217903400012, Silt, Colorado by Huddleston-Berry Engineering & Testing, LLC for Jon Ford, September 21, 2021. Dear Mr. Ford, In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at Parcel 217903400012 in Silt, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as-built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston-Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering Cc: Garfield County Building Department 11/01/21 ATTACHMENTS REPAIR AREA STA WATER LINE NEW HOME 1,000 GALLON TANK PARCEL 217903400012 AS-BUILT SITE PLAN Project # 02266-0006 Date: 10/29/21 By: WDAN Scale: 1" = 50' 2789 Riverside Parkway Grand Junction, CO 81501