HomeMy WebLinkAboutOWTS Installation Observations 10.31.20212789 Riverside Parkway
Grand Junction, Colorado 81501
Phone: 970-255-8005
Info@huddlestonberry.com
October 31, 2021
Project#02266-0006
Factory Direct Housing
2302 Highway 6 & 50
Grand Junction, Colorado 81505
Attention: Mr. Jon Ford
Subject: OWTS Installation Inspection
Parcel 217903400012
Silt, Colorado
Reference: OWTS Design, Parcel 217903400012, Silt, Colorado by Huddleston-Berry
Engineering & Testing, LLC for Jon Ford, September 21, 2021.
Dear Mr. Ford,
In accordance with Garfield County and State of Colorado regulations, Huddleston-Berry
Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater
Treatment System (OWTS) at Parcel 217903400012 in Silt, Colorado. As indicated in the
referenced report, HBET completed engineering design of the system.
Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with
the design. The as-built site plan is attached. Please contact us if you have any questions or
comments regarding the contents of this letter.
Respectfully Submitted:
Huddleston-Berry Engineering and Testing, LLC
Michael A. Berry, P.E.
Vice President of Engineering
Cc: Garfield County Building Department
11/01/21
ATTACHMENTS
REPAIR AREA
STA
WATER LINE
NEW
HOME
1,000
GALLON
TANK
PARCEL 217903400012
AS-BUILT SITE PLAN
Project # 02266-0006
Date: 10/29/21
By: WDAN Scale: 1" = 50'
2789 Riverside Parkway
Grand Junction, CO 81501