Loading...
HomeMy WebLinkAboutConditions of Permitco NDITIONS OF PERMIT BLRE-l0-21-7 200 SCIB LLC New S/F Dwelling w/ attached garage 207 Blue Heron Dr., Glenwood lronbridge, PH 3, Lot 5ó 1) ALL WORK SHALL COMply WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (r.R.c.)AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E,C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNry BUILDING REOUIREMENTS", NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD, ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCU PANCY, 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY f ,50O PSF SOIL BEARING CAPACIry. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. (Contractor to ensure footing / foundation is adequately protected from frost, freeze, snow during winter conditions.) ó) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING BUILDING AND ROOF PROJECTIONS -- COMPLIES WITH PLAT (RECEPT|ON 8ó8309) PROVTSTONS FOR UTILITYAND DRAINAGE EASEMENTS, 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION.