Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIO NS OF PERMIT B LRE- 10-21 -71 83 Zag Built LLC New S/F Dwelling w/ attached garage TBD Sundance Trail, Carbondale Aspen Glen, FLG 4, Lot SD-13 1) ALL WORK SHALL COMpLy W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (r.R.c,)AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REOUIREMENTS", NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) ELECTRICAL PERMITTING AND ¡NSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT, 5) OPEN-HOLE SOTLS REPORT REOUTRED AT FOOTING INSPECTION TO VERIFY 2.5OO PSF SOIL BEARING CAPACIry. PROVIDE COPY OF ENGINEER'S REPORT FOR BUILDING INSPECTOR REVIEW AT FOOTING INSPECTION. ó) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGTNEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. 7) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS - IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS.