HomeMy WebLinkAboutCorrespondence Regarding Final Sign-OffColleen Wirth
From:
Sent:
To:
Cc:
Subject:
Attachments:
Colleen Wirth
Friday, February 4,2022 4:26 PM
mcw7300@aol.com
Dave Argo
BLRE-O2-21 -6700 - basement finish remodel
BLRE-02-21 -6700 Residential -Final Report.pdf
HiMary,
Enclosed ís your building final inspection report.
We have received the State Electrical inspector approvals and changed the status of Garfield County's Buildíng Permit
BLRE-02-21-6700 from ACTIVE to FINAL.
As the residentíal home is an already occupied living space it is unnecessary for us to re-íssue a Certificate of Occupancy.
Thanks for working with us, hope you continue enjoying the improvements to your home.
All best
Colleen Wirth
Plans Examiner
Garfield County Building Dívision
108 8th Street, Suite 401
Glenwood Springs, CO 81601
cw i rth @ ga rf iel d-co u ntv. com
office (970) 945-t377 ext. 1610
I
ffiffiffiffiffi"ë""ffi&ffiffi
Com m unity Development Ðepartment
108 8th Street, Suite 40'l
Glenwood Springs, CO 8'1601
Phone (970) 945-8212
POST THIS IN A COI.{SPICIOUS PLACE WHEN
CONSTRUCTION IS STARTED
Permit Type Residential - Other
Work Classificat¡o¡ Remodel
PERMIT # BLRE -02-21-6704 tssue sa¡6 3t5/202r Expiration Date 9lu202l
Gcu field County
Project Address 7300 CR252 parcel No. 192120200013
Owner Name James & Mary Wheeler Owner phone 970-625-9482
Contractor(s)Andrew Womack Contractor phone 970-319-1476
Work Description convert space from unfinished to finished
AGREEMENT
ln consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning,
location, construction and erection of the proposed structure for which this permit is granted. The applicant further agrees that if the above
said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit
may then be revoked by notice from the County Building division and immediately become null and void.
lnspection Comments Pass Date
Footers
Foundation Walls
UG Plumbinq
Rouqh Plumbing JW 4-5-21
Gas
Mechanical JW 3-24-21
Framing*JW 3-24-21
lnsulation JW 3-24-21
Drvwall JW 4-5-21
Misc.
Final performed basement finish final 2.3.22; received elec inspection reports 2.4.22 CW 2.4-22
R&B Driveway
" Rough electrical inspection must be cpmpleted p rior to a framing inspection
PLEASE SEE BACK OF PERMIT FOR ELECTRICAL AND FIRE DEPARTMENT INSPECTIONS AND OTHER COMMENTS
ADDITIONAT INSPECTIONS MAY BE REQUIRED
For Irrspectious Call (970) 945-1377 x|62l
For Driveway Inspections Call (970) 625-8601