Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-11-2r-7228 Glenwood Adventure Park: Roller Coaster Launch Building L850 Transfer Trail Road - Glenwood Springs, Colorado 1) ALL WORK SHALL COMPLY WlrH THE 2015 l.B.C., LM.C., l.P.C., l.F.G.C., LF.C., 2009 l.E.C.C., AND ACCORDING TO MANUFACTURER'S INSTALLATION INSTRUCTIONS & REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFTELD COUNTY',S BUILDING REQUIREMENTS, PLAN REVTEW COMMENTS AND/OR REDLINES, AND INSPECTIONS POLICY. 3) WORK SHALL COMply W|TH ALL CONDTTTONS OF THE SPECIAL-USE PERMIT AND 'RURAL" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY,S LAND USE & DEVELOPMENT CODE. 4) BUtLDING APPROVED AS TypE V-B CONSTRUCTTON, FULLY FIRE-SPRINKLERED WITH THE FOLLOWING OCCUPANCIES: ASSEMBLY (GROUP A-5), BUSINESS (GROUP B) & MODERATE HAZARD FACTORY INDUSTRIAL (GROUP F-1). s) AUTOMATTC FtRE-SPRTNKLER SYSTEM rS REQUTRED THROUGHOUT THIS BUILDING. CONTACT THE LOCAL FIRE DISTRICT FOR FIRE SPRINKLER DESIGN CRITERIA, INSPECTIONS AND OTHER INTERNATIONAL FIRE CODE (I.F.C.) REQUIREMENTS. IN ADDITION, COMPLY WITH ATTACHED REQUIREMENTS AS STIPULATED BY LOCAL FIRE DISTRICT (REFERENCE LETTER DATED T/7/22 FROM GREG BAK). FtRE DISTRTCT',S StGN-OFF/APPROVAL REPORT rS REQUTRED AT FRAME INSPECTION AND PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) AMUSEMENT PARK RIDE tS SEPARATE FROM AND SPECTFICALLY NOT TNCLUDED rN THIS BUIDING PERMIT. PER I.B.C., CHAPTER ]-7,,SPECIAL INSPECTIONS", THE AMUSEMENT RIDE SHALL BE PERMITTED, INSPECTED & APPROVED BY THE STATE OF COLORADO, DEPT. OF LABOR & EMPLOYMENT. PROVIDE COPY OF APPROVED DESIGN PLANS FOR BUILDING INSPECTOR REVIEW ATTIME OF FRAME INSPECTION. FINAL CERTIFICATION & APPROVAL BY STATE IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7l VERtFy COMPLTANCE W|TH EGRESS REQUTREMENTS AS PER 201-5 l.B.C., CHAPTER 1-0 INCLUDING: A. DOOR HARDWARE, LOCKS, LATCHES & LANDINGS AT DOORS - SECTION 101.0 B. EXTTS - SECTIONS LO22,1024, LO27, LO28 C. STAIRS, RAMPS, LANDINGS, RAILINGS AND HANDRAILS _ CHAPTER 10 8) ACCESSIBtLTy REQUTREMENTS AS PER 2015 l.B.C., CHAPTER 11 & ICC ANSI 117.1-2009. THE AMUSEMENT RIDE SHALL COMPLY WITH '.8.C., SECTION LILO.4,8 & ICC ANSI 'J.L7.L-2009, sEcTtoN LL02. 9) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AlR, DUCTWORK & VENTING REQUTREMENTS AS pER TNTERNATTONAL MECHANICAL CODE (r.M.C.) AND LE.C.C., SECTION 503. MECHANICAL ROUGH-IN INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION. 10) pLUMBtNG REQUTREMENTS pER TNTERNATTONAL PLUMBING CODE (l.P.C.)AND PLUMBING ROUGH-IN INSPECTION IS REQUIRED PRIOR TO FRAME INSPECTION. 11) ELECTRTCAL REQUTREMENTS, PERMTTTING AND TNSPECTIONS AS PER COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 12) VERIFY DTRECTTONAL EX|T StcNS AND EMERGENCY LIGHTTNG LOCATTONS PR|OR TO ELECTRICAL ROUGH-IN INSPECÏION.