Loading...
HomeMy WebLinkAboutPercolation Test Results\Ët EEÐTECHNIIAL i l.ll;il.ii I lìliìl ì i,{.,1,',, ' SATURATION AND PREPARATION DATE: August25,2021 TIME AT START OF SATURATION: lOAM Technician: John Withers WATER IN BORINGS AFTER SATURATION x PERCOLATION TEST DATE: Augusl26,2O21 YES Depth to Water NO Grand Val Consulti LLG dba PERCOLATION TEST RESULTS HOLE NUMBER DEPTH (rNcHES) (7" DTAMETER) TIME AT START OF INTERVAL TIME INTERVAL (MTNUTES) DEPTH TO WATER START OF INTERVAL (rNcHES) END OF INTERVAL (rNcHES) CHANGE IN WATER DEPTH (rNcHES) PERCOLATION RATE (MrN/rNCH) P-1 at 3'15"'1000 10 2.5 5.5 3.0 3.3 1010 10 5.5 7.5 2.0 5.0 1020 10 7.5 9.0 1.5 6.7 1030 l0 9.0 11 0 2.0 5.0 1 040 10 11.0 12.5 1.5 6.7 1 050 10 12.5 13.0 0.5 20.0 Average =5.2 Min/inch Job No. 4645 Fig. I 'Çãl EEtrTEEHNIIAL I i'11ìl!.ji I ili,'Jlì i.!.1iii1ltGrand Val Consultin LLC dba Top of hole : -8' dry to limit of hole PERCOLATION TEST RESULTS WATER IN BORINGS AFTER SATURATION X PERCOLATION TEST DATE: August26,2O21 YES Depth to Water NO SATURATION AND PREPARATION DATE: Augusl25,2021 TIME AT START OF SATURATION: lOAM Technician: John Withers HOLE NUMBER DEPTH (rNcHES) (6" DTAMETER) TIME AT START OF INTERVAL TIME INTERVAL (MTNUTES) DEPTH TO WATER START OF INTERVAL (rNcHES) END OF INTERVAL (rNcHES) CHANGE IN WATER DEPTH (rNcHES) PERCOLATION RATE (MrN/rNCH) P-2 at6'15"1000 10 2.5 4.5 2.0 5.0 1010 10 4.5 5.5 1.0 10.0 1020 10 5.5 6.5 1.0 10.0 1 030 l0 6.5 7.0 0.5 20.0 1040 10 7.O 7.5 0.5 20.0 1 050 10 7.5 8.0 0.5 20.0 Average 10.9 Min/inch Grab s rmple from 3 fe :t depth has 51'6 passing No 200 sieve wl en tested in sr rillaboratory Fig. 2Job No. 4645 SATURATION AN D PREPARATION DATE: Augusl25,2021 TIME AT START OF SATURATION: lOAM Technician: John Withers WATER IN BORINGS AFTER SATURATION x PERCOLATION TEST DATE: August26,2021 YES Depth to Water NO Grand Val Consulti LLC dba Top ofhole: -36" PERCOLATION TEST RESULTS Fig. 3 HOLE NUMBER DEPTH (rNcHES) (7'DIAMETER) TIME AT START OF INTERVAL TIME INTERVAL (MTNUTES) DEPTH TO WATER START OF INTERVAL (rNcHES) END OF INTERVAL (rNcHES) CHANGE IN WATER DEPTH (rNcHES) PERCOLATION RATE (MrN/rNCH) P-3 at 3'16"1000 10 3.5 5.25 1.75 5.7 1010 10 5.25 7.0 1.75 5.7 1024 10 7.0 7.5 0.5 20.0 1 030 10 7.5 9.0 1.5 6.7 1040 10 9.0 10.0 1.0 10.0 1 050 10 10.0 10.5 0.5 20.0 Average 8.6 Min/inch Job No. 4645