HomeMy WebLinkAboutEngineer's ObservationSTNUITURAL DESIüN 1040 fuArN STREET ! CARB0NDALI, C0 81623 | {9i0) 510-0773 ev0h'eslrucl.conr FIELD OBSERVATION REPORT #2 Date: February 3,2027 To Julio Moreno Lot 38 County Road 331 Silt, Colorado A site visit to review the existing structure and construction progress was completed for the above referenced project. At the time of the site visit, the following observations were made: L The structural framing systems for the house were essentially complete. a. Roof framing was installed, roof sheathing was in place for most of the roof, with garage roof sheathing in progress, At the time of the site visit, construction appears to be in general conformance with the Structural Contract Documents. Please contact our office if you have any questions or concerns in relation to the information noted above. Evolve Structural Design Steven R, Edm ., S,E. Senior Engineer Project:Griselda's Project - Lot 38 County Road 331 ESD Project #:19.r20C Observation Date:December L8,2O2O Contractor:Owner Present at Site:Julio Moreno (Owner), Steve Edmiston (ESD)