Loading...
HomeMy WebLinkAboutSubsoil StudyHuddleston-Berry 2789 Riverside Pakway Grand Junction, Colorado 81501 Phone: 97G255-8005 Info@huddlestonberry.comEngineering & Testing, LLC January 5,2022 ProjectlÐ2401-0001 Crystal Constructors Inc. PO Box 455 Silt, Colorado 81652 Attention: Mr. John Placek Subject:Geotechnical Investigation Parcel 212728400388 Silt, Colorado Dear Mr. Placeþ This letter presents the rezults of a geotechnical investigation conducted by Huddleston-Berry Engineering & Testing, LLC (HBET) for Parcel 212728y'l00388 in Silt, Colorado. The site location is shown on Figure I - Site Location Map. The proposed construction is anticipated to consist of a single-family residence. The scope of or¡r investigation included evaluating the subsurface conditions at the site to aid in developing foundation recommendations for the proposed construction. Site Conditions At the time of the investigation, large bushes occupied the site. The site was generally sloping down to the south. Vegetation consisted of grasses, weeds, and small to large bushes. The site was bordered to the nortb v/est, and south by open land, and to the east by residentiaVagricultural property" Subsurface Investisation The subsurface investigation included six test pits at two potential build sites at the site as shown on Figure 2 - Siæ Plan. The test pits were excavated to depths ranging from 2.5 to 9.0 feet below the existing ground surface. TWed test pit logs are included in Appendix A. As indicated on the logs, the subsurface conditions at the site were variable. Test Pits TP-l through TP4, conduct€d in the northern potential build area and the northein portion of the southern potential build area, encountered 1.0 foot of topsoil above tan, moist dense clayey sand with gravel, cobble, and boulder soils to the bottoms of the excavations. Groundwater was not encountered in TP-l, TP-Z,TI-3, or TP-4 at the time of the investigation. Test Pits TP-5 and TP-60 conduct€d in the center and southern portions of the southern potential build are4 encountered 1.0 foot of topsoil above brownish-tan to reddish-tan, moist, medium stiff sandy lean cþ with gravel soils to the bottoms of the excavations. Groundwater was not encountered in TP-s or TPó at the time of the investigation. Parcnl2l272&4ffi388 #02401-000r ovoíl22 Iluddlesron-Beñy ¡ntitcdo¡ ú Tc{ÌrB, l.l.C Laboratorv Testins Laboratory testing was conducted on samples of the native soils collected f¡om the test pits. The testing included grain-size analysis, Atterberg limits determination, natural moisture content deterrninationo and maximum dry density and optimum moisture content (Proctor) determination. The laboratory testing results are included in Appendix B. The laboratory testing rezults indicate that the native cþ soils are slightþ plastic. In general, based upon the Atterberg limits of the material and upon our experience with similar soils in the vicinity of the zubject site, the native sand soils are anticipated to be slightþ collapsible. The native clayey sand soils were indicated to be moderately plastic. Based upon the Afferberg limits of the materials, the native clay soils are antieipated to be sligbtly expansive. Foundation Reçommendgtions Based upon the results of the subsurface investigation and nature of the proposed construction, shallow foundations are generally recommended. Spread footings and monolithic (turndown) structu¡al slab foundatíons are both appropriate altern¿tives. However, as discussed previously, the native soils are anticipated to be moisture sensitive. Therefore, in order to provide a uniform bearing stratum and reduce the risk of excessive differential movements, it is recommended that the foundations be constructed above a minimum of 24-inches of structr¡ral fïll. If a basement is proposed, HBET should be contacted to conduct additional subsurface exploration to evaluate the soils at the probable basement foundation elevation. The native sandy lean clay soils are zuitable for reuse as structural fill. However, due to the plasticity of the matrrial and presence of large particles, the native clayey sand soils aÍe not suitable for reuse as stn¡ctural fill. Imported structural fill should consist of a granular, non- expansive, non-free draíníFe material approvedby HBET. For qpread footing foundations, the footing areas may be trenched. Holvever, for monolithic slab foundations, the structural fill should extend across the entire building pad area to a depth of 24- inches below the bottoms of the turndown edges. Stuctural fill should extend laterally beyond the edges of the foundations a distance equal to the thickness of structural fill for both foundation t)?es. Prior to placement of structu¡al fill, it is recommended that the bottom of the foundation excavation be scarified to a depth of ó to 8 inches, moisture conditioned, and compacted to a minimum of 95%o of the standard Proctor maximum dry density, withfur +2Yo of the optimum moishre content as determined in accordance with ASTM D698. Structural fill should be moisture conditione{ placed in maximum 8-inch loose lifls, and compacted to a minimum of 95Yo of the standard Proctor maximum dry density for fine grained soils and 90% of the modified Proctor maximum dry density for coarse grained soils, within *2% of the optimum moisture content as deterrnined in accordance with ASTM D698 and D1557, respectively. Structural fill should be extended to within 0.I-feet of the bottom of the found¿tion. No more than O.I-feet of gravel should be placed below the footings or turndown edge as a leveling course. 2Z:\20$ ALL PROJECTS\OøO| - Cryslsl Cmstuctoa\02,{}t{001 Pæl2127284m388\200 - G@\0240¡-Oml LR0l0522.doc Parcel2127284OO388 #02401-0001 0u05/22 Huddleslon-Bcrry Èqinû.¡ira a Ì..r¡¡s, ¡-Lc For structural fill consisting of the native clay soils or approved imported granular materials, and foundation building pad preparation as recommendedn a maximum allowable bearing capacity of 1,500 psf may be used. In addition, a modulus of subgrade reaction of 150 pci may be used for structural fill consisting of the native sand soils and a modulus of 200 pci may be used for suitable imported structural fill. Foundations subject to frost should be at least 36 inches below the finished grade. Water soluble sulfates are corrmon to the soils in Western Colorado. Thereforq at a minimum, Type I-II sulfate resistant cement is recomme,nded for construction at this site. Any stemwalls or retaining walls should be designed to resist lateral earth pressures. For backfill consisting of the native soils or imported granular, non-free draining, non-expansive material, we recommend that the walls be designed for an eçtivalent active fluid unit weight of 50 pcf in a¡eas where no surcharge loads a¡e present. An at-rest equivalent ftlid unit weight of 70 pcf is recommended for braced walls. Lateral earth pressures should be increased as necessary to reflect any surcharge loading behind the walls. Non-Structural Floor Slab and Exterior FlatwoJk Recom4Fendations In order to limit the potential for excessive differential movements of slabs-on-grade it is recornmended that non-structural floating floor slabs be constructed above a minimum of 18- inches of structural fill with zubgrade preparation and fiIl placement in accordance with the Foundation Recommendafior¿s section of this report. It is recommended that exterior flatwork be constructed above a minimum of l2-inches of structural fill. Dr¡inage Recommendations Grading and draínage are crilicul ø the long-tcrrn pcrtormønce of the strucTure. Grading around the structure should be designed to carry precipitation and runoff away from the structure. It is recommended that the finished ground surface drop at least twelve inches within the first ten feet away from the structure. It is also recommended that landscaping within five feet of the struchue include primarily desert plants with low water requirements. In addition, it is recommended that automatic irrigation, including drip lines, within ten feet of foundations be minimized. HBET recommends that surface downspout extensions be used which discharge a minimum of 15 feet from the structure or beyond the backfill zoneo whichever is greater. However, if subsurface downspout drains are utilize{ they should be carefully constructed of solid-wall PVC and should daylight a minimum of 15 feet from the structure. In addition, ¿n imFermeable membrane is recommended below zubsurface downspout drains. Dry wells should not be used. As discussed previously, shallow groundwater was not encountered at the time of the investigation. However, a perimeter foundation drain is recommended. In general, the perimeter foundation drain should consist of prefabricated drain materials or a perforated pipe and gravel system with the flowline of the &ain at the bottom of the foundation (at the higbest poinQ. The prefabricated drain materials or gravel should extend along basement walls to within 36-inches of the finished grade. The perimeter drain should sþe at a minimum of l.ÙYo ûo daylight or to a sump with pump. The drain should also include ¿¡ impermeable membrane at the base to limit the potential for moisture to infiltrate verticaþ down below the foundations. JZ:V00s ALL PROJECTS$2,|01 - C¡yBþl CdùumB\024O1{Ð01 Pæl 21272t4{Xr3t8vm - G@$2401'Oml LR010522.ùc Patcel212728400388 #024014001 0t/0s/22 @ Huddleson-Berry hrEnÈ.r¡óÊ& L{ir8, ¡.LC General Notes The recommendations included above are based upon the results of the subsurface investigation and on our local experience. These conclusions and recommendations are valid only for the proposed construction. As discussed previously, the subsurface conditions encountered in the test pits were variable. However, the precise nature and extent of zubsurface variability may not become evident until construction. As discussed previously, it is recommended that HBET provide construction materials testing and engineering oversight during the entire construction process. In addition, the homeowner and any subcontractors working on the project should be provided a copy of this report and informed of the issues associated with the presence of moisture sensitive subgrade materials at this site. It ß ímoortant to note that the recommendatíons herein øre íntendcd to reduce the ¡úsh of sttactursl movemenl and/or dømaee. to vamíns desrces. assocíated with volume chønse of the nøtíve soíls Howeven IIBET cannot oredíct lan*term chønses ín subsu¡face moísture conditions and/or the o¡ecìse møeniÍude o¡ úenl of volurne chønqe in the nolíve soíls. l{here sísnifrcønt íncr,eases ín subsurføce ,rpistu¡e occur due to ooo¡ srød¡(s. imo¡ooer storrnwaÍer manøsement. ú¡lin línqÍaílure. æcess ínüsøtíon. or other cøuse. eìfl,re¡ duríns constîuction or the result of øctions of the o¡ooe¡ttt mwten several inches of movemcnt are oossìbl.a I& addítion. an! føílure to comolv with the recommendotìans in thß reoort releøses Huddlcston- Berrv Ensineer¡ns & Testúns. LLC of anv liøbílitv wíth reeørd to the structure oerfo¡msnce. We are pleased to be of service to your project. Please contact us if you have any questions or comments regarding the contents of this report Respætfully Submitted: Iluddleston-Berry Engineering and Testing LLC Michael A. Berry, P.E. Vice President of Engineering 4Z:U0m ALL pROtEcTS\o24OI -Crysral C6ectoE\û240l400l PæI21272E4æ388\400 -G@$2¡Ol40ol LR0I0522.doc FIGURES I Location Map .,r' APPENDIX A Typed Test Pit Logs PR(}'EGTI{A,TIE Patd217728 OOß8 PRO'ECT LOCATKT{si¡lr coPROIECTl{urBER 02 0l{n0l CLCI{T l:Gfd f'lsclr ¿!fæ lm 970-255{005 Junctim, CO 81501 TEST PIT NUMBER TP-I PAGE 1 OF I Huddleston-Berry Fngineering & Testing LIÆ 2789 RJverside Parkway EXCAVATI(}I{ COI{TRACTOR Clktnt GROIJIü'WATER LEI,ELS: EXCAVATTOT{ trET}lOD Trad<h/Bddræ AFTERflCAVATK'{ DATE STARTED 12t1t21 LOGGEI' BY SD ATTNEOFEXCAVATI(}I úv C,OÌIPI-ETED 12t1t21 CIGCIGD BY MAA AT EI[' tr EXCAVATXTI &v il('rEs GR(X'ND ELEI'ATKÌ{ TEST PIT SZE ATTERBERG I IM|TS rJLts rr! < 5=ù È 9u¡ ã9s=o. þzt¡lt-zOG()3) ou¡2E u¡À>Él- l¡l TgfLr =2(tt s g8 8s H {rîÞf,^z.Jãas(rz z t¡JÀ u9 ()oÁ- l- t-^ =EÉ.o C. HP f/rgo2 =o() o- ø= J- Ë Tl-o-t¡rr] o.0 I *Ëo MATERJAL DESCRIPnOi¡ ,ù-'ü i"tj 'r-fJl Sardy Leon Clay u,lth OrgÐlcs CrOPSOIL) t 21 18 35GB 1 I 39 Clay€y SAl.lD rrith GRAVEL, COBBLËS, an¿ BOULfERS (SC), ttr, rnoist, dense *'Lab Claesified Gel Bdtøn dtest ¡Ít d 8.0 f€€ú. I a I a ¡ (a t r¡ I o ¡ a I a I a I i I a I at a ¡ t ¡ I Iô d.tÞ-Éuu¡*o*=3zl--ÀFU't¡¡ÞeÉÉccæ¡\TcooC)JıãEË¡¡¡E-,bt¡¡ÊãèEEI.8€ÐIèÀl¡¡obúo\æFNæo(JEEáIq?3t\o\csúIttvtèTutcçoNoÉ,t¡l$52(Jl¡¡aÉ.L2E(tt¡¡Nal,EU,t¡¡å¡9E5ñIo2tÉ,oËkI(,ıät¡¡tkîl¡J-ı3oñËrtıüf,ktsfiËE6su¡u¡ô23É(!,ôtñt0=tttt¡¡IÊbÈãoNñEgüo.6o5(,E3()tkoxl¡¡ôt¡.|EIDt¡¡c¡oqtt!c¡t¡¡g(u)Hld30oeol3lHdVUeêb-eothuJode.uJLk=u38nnN3d^r 3'rdvrvs(oou)% ^H3AOC3U(¡nrvn ¡¡)sINnocols0e)N3dt3 COd0od)r IlNn ^uo(ø) rru¡rnoc3Untstoyl¡otøffi=LJk(7o)]N3INOC SSNIJTWNotnotlIl,ï11ctrs\nd30Nt^UC[S\ndÍ;..'.{r-$ ìÐ{.i'lii ä'i::1 ..:l''J -'i.. ,-l^. -Lr'. ?-1.-.-i.'.,1 .,i,..JoIDo-gEf,ooÊE(!ocEËfi",l(fIi.IıÉ,ulofIpıUìuJJóI()jUJfr(9't2sáE$Ë$cñ'tú'aEIEË G'IÀl-É,t¡¡É=Ðzþ-ÀÞot¡Jt-]l.ot¡lodacrÊcocccc1ll\Nî!co.o(Jii6ãkIEEÉl¡¡-tt)l¡¡EjèôI{gI.tsèol¡lÞ^u5EË1'ààl¿ÉoEbúoæoooËc.€cÈUtú,òTuccIIoNoÉ,l¡lô¡2IJHóËI?rôËt-o\2gou¡NaEat¡¡¡tgt¡¡5Ë,l¡¡=o2BÉ,oãI(Jñät¡ltEËkìËäafı3()ññt8su¡t¡¡cl2BÉ,(9É0=att¡¡EÊl¡rÀËoEErðêt¡¡IüIJÊ.eo(\lN5ÈtÍã(,ã3(JñEh.Ë3tJñol¡tE(tu¡L<oôôEêl¡¡g(u)Htd30eorCIHdVUE6EÊ,()v)IJJôdEuJä=u3stiünN3d^L tldtrvs(oou)7o À83AOC3U(¡nrv¡ H)srNnocols(¡q)N3d -Lt COd(¡cd)r JNNAUO(Ð tt't¡tNoc3Unrsto$üoSo#=LJk(v,)]NSINOC S3NIJltfinornonltnllc[s\nd30Nt^lrc[s\ndii'...Ìj.:Íi:,ìi.'J.'i. .-rl.'.\.i.'.:ì:.71:{,1',-¿l''7F .S{ . -ll'.s'Ètl:.'-*r...,1'.';. :'21aoal,o-ggIo5E6ıcEJtc6atriåtıú.uJoJ=oo1¡bri-l6EojtrJàÉ.o'59sá5åE()EEulNti'aEbEEã TEST PIT NUMBER TP.4 PAGE 1 OF I PRO.ECT]{ATE ParuçA21Tf28 OO38,A PRû'ECT LOGATKTI sj¡fr coPROFCTM'TBER 02 01{n01 CLCflT lìrcfal ôrncfr .{ñ ln. Riverside hgineering & Testing IJ.C 970-255-8005 Junctim, @ 81501 1211t21 TEST PÍI SEEDATE STARTED 12t1121 LOGGEDBY SD CTGCIGD BY i,lAA E (CAVATIOÍI COÍTRACTOR Client COTIPI.ETED GROTJiE' ELEI'ATK}I ilorEs ATETI'OFEXCAVATf,T{ ÛV AFTEREXCAVATÍT{ _ EXCAVATI(I{ XET}ÍIT Trâdd!tsdôoe GRolJilDWATERIËT/EIS: ATTUEOFEXGAVATI(II ûv ATIERtsERG I tMtTSlllo->É. È- l¡¡ 5gfLa =zln * üq ãE l¡JÉ U'Wl-3 ^2-t;3soz ¿u¡ùÞêiug ()oÀ l-- F^ 3E É.cl ul e\É- l¡tPto2 =o() OL et4 fJ otrts 3=À È9u 42û t-zl¡¡Lz 88 (t, UJ2 É ¡Ë IFô-l¡lo o_o ooJ () To- Ê.(' MATERI,AL DESCRIPnON É"! ?'.:ü te¡ 'r-{!¿ SaÉy Lean qay with ûganlcs CrOPSOIL) Cl4€ysAtlDwith GRAVEL, COBBIfS, ild BOULDERS (sc),trt, rndst, dense Bdtdn dtest f,it d 8.0 fe€*. (tta tszı Àoct ıêð È NJB(JÉ À ulFd.sÞ-Ëut¡¡ sE*=32tsÀt-g,t¡¡t-ææı:cceFrEfiÀo(J-,6ËEuPt¡¡-1C't¡¡aËqH.8€Ð!¿ô.Ë >g,Ê'Ë ä>l€ uÆE.d=Ë É Eã3'& 5n!o ËS:.æ lËCti¡.\\JO\dEaÈËuçòîrcoç(¡Noñó¡¡2(tl¡¡aË2lx(,l¡¡NttEatl¡¡IlútI t¡¡ËE_kg4ttr-oo22E8ÉÉ,oc}¡tıIC'xl¡¡üTEÉI(tıä2t¡¡fããñÉhNN3ol¡¡ÞÊhdttJ!rIËEÉ¡gt)Ë.9oNN5C'É3oáä(,xl¡lil¡¡¡a3(.,xl¡Jêt¡¡Ev,l¡¡clê(¡aou¡g(u)Hld30ccieolStHdwÐ6Lb-aoo)uJôdd,l¡lt-=u3snnN3d^I 3ldmvs(osu)% ^u3AO3tU(3nï N)srNnocolg(¡s¡)N¡dr3 cod(¡cd)I TNNAUO(yo) rn¡rnoc3Unlstot¡lofftøff=LJk("¿)IN3TNOC S3NIJtl$ü1ornonJvïtlcrrs\ftd30Nt^rc[sv1dZP.,.f.-ar..Sh'j.*¡.'oi''',¿l-.'-i¡.-C.'.ÀeoøÈgEgö'5socE>ÌtÊsEEÈJ6'ÞtsdãÊã.E-¡,EJul3oËdEJE$EEqgtË'aEtEEA,HL @Io.l-É,l¡Jo=Ðzþ-À¡-ttlr¡t-l!ot¡lod@6clÉñl\(\ñTu(!o-ooJttÉktJtruËu¡.Itt¡¡ara'JJèô.8€à0ÊEéèDÉlt¡¡æItèqtE6ÈutøtOrEOçoNootbúIæctF.o\É,l¡¡*2(Jt¡¡ar2f(Ju¡Nlthv,t¡¡¡¡s¡¡¡5Ê,t¡¡=ê-tÉ,oarC'ñät¡¡IEã!Ëbf,kt3úññE6L(5t¡¡o-BÉ,('N6É(Dt¡tÞEl¡rdã()Ërc0*ÈÊl¡¡Tã3(,ñÈgüoc.coNñ5(tË.ã()ãE(Jxl¡¡ôt¡.1tsv,t¡¡kctôøoÊg(u)t{rdãoed001clHdWE6b-É.oahuJôcÉ.uJk=u38n¡nN3d^t 3ldl,tlvs(oou)%^u3^oc¡u(¡nrvn N)slNnocols0s¡)'N3d $t cod(¡cd)I IINNAHO(y,) rHErruoc3UnISþnoÉ,d¡Effi=LJt-<("Á)lN3lNOC S3NHlltïuornonr¡¡t'lcllsvld:lONl^Ltc[s\nd?r ._rl. -ä.'srt.;7t. .¡q¡':.¿1. . .ii.'.-J.'. l.'rl. f l.J .' i. . il.' .\;. ;,1..1.j3o|t)o-ot-EBotE5oËsJttcEEEÈtà.EÈ!í¿û!i,dJl¡Jàto5'5àJocEËt,ñçóoEûßo.0(ûJg)E-oñt@oct)Eotdt!'aEtÊıã APPENDIX B Laboratory Testing Results Hûddl€stm-B€rry Engirering & Testing LL.C 2789 Riverside Partway Grand Junctioo, CO 81501 97G255-8005 GRA¡N SIZE DISTRIBUTION CUEiTT Cruslal CnndnrcJom lnc.RO ECTI{A E Pa¡æl212728/;OO388 RO ECTNU BER 02,f01-0001 RO ECT LOCATIOI¡ Sitr. CO u.s. stÊvEoPENr¡tG tN fi{cflEs I U.S. S|ÉVE MriitsERS TIYDROMETER 1 1(Ð 95 Þ-I(t t¡l B oúlÍz TL t--z 1¡loÉ.t¡lo- 65 60 55 50 45 40 35 30 25 20 15 l0 5 0 10 GRAIN SIZE IN MILLIMETERS I ljl\T 'lr;r \¡ I \ lil\tq\ { rl ì \l'l \11\t \ ü ll: COBBLES GRAVEL SAND SILTOR CI.AY @arsa fine ooaße medíum fine Specimen ldentification Glassificatlon LL PL PI Cc Cu a TP-t, GB-l 121 CLAYET SA¡{D uriü GRAì/EL(SC)39 21 l8 E TP€, GB.I 121 SANDY |."EAN C|-AY(CL)n l8 l0 Specimen ldentifi cation D100 D60 D30 D10 o/oBravel %Sand %silt o/oClay a TP-1, GB-l 121 97.5 oztt r8.6 6.1 35.3 E TP6, GB-l 121 9.5 0.1 {.7 69.2 Engircering & Testing; LLÆ ATTERBERG LIM]TS' RESULTS Rive¡side Jrmction, CO 97&255-8005 CUENT êætal lÌnnqln ¡.-lñß lnc PR ECT I{A¡ÍE Parenl212728r';îî48,8 PR ECTÌ{UTBER ñ2An1J}00'l PR ECTL CATI N SiIt,CO @ @ P L A s T Ic I T Y I N D E X O 1 CL.ML @ @ LIQUID L'MIT Specimen ldentification LL PL PI #200 Classification TP-1, GB.I 12/1 3S 21 l8 35 C¡-AYEY SAND with GRA\JEI{SC) TP6, GB.1 12J1 n r8 lo @ SANDYLEAT{ CI"AY(CL) øt Huddlestm-Berry Engiming & Testing LIIC MOISTURE.DENSITY RELANONSHIP Riveiside Parkway co 81501J¡mctiø, 970-255-8005 CUENT Crcfâl Cônstrurdors lnc,PR(I'ECTI{A¡IE trarep,l212ll28r';0fl3Á,8 PRO.'ECT I{UTBER nr¿olJYìol PR(UECTLOCANOil s¡tt_ co Sample Date: Sample No.: Source of Material: Description of Material 12t1t20'21 2t{t986 145 140 r35 130 125 120 115 110 105 100 95 90 TP6. GB-I SA¡iIDY LEAT{ CI.AY(CLI Test Method:ASTII D@84 TEST RESULTS Maximum Dry DensÍty læ'0 PCF Optimum Water Content t5.0 % GRADAnON RESULTS (% PASSTNG) #200 Ø. 3t4' 69 100 100 ato È (1,zt¡¡o Éô ATTERBERG UTI¡TS LL 28 PL PI 't8 l0 Curves of 100o/o Saturation for Specific Gravity Equalto: 2.80 2.70 2.60 0 5 15 WATER CONTENT, 7o 10 20 30 reg COLORADO Division of Water Resourccs I lÊì1,,¡r :'i-rplr: ¡i .'.,¡it,';=i Ëi..:',.'la ¡'i DWR_3849996 imaged Documenlgo About Search Metadata Thumbnails Annotations â Entry Properties Last modified 12/9/2021 4:24:14 PlVl Creation date 12/9/2021 4:21:52 PM * Metadata Fields Template: Well Permit lnformation Permitno 324773 Receipt Number 1 001 51 99 Document Type - Well Permit Original File Annotated? No Document mänagement portal powered by Laserfiche WebLir¡k 9 O '1998-201 5 Laserfiche. All rights reserved. * 1 /12 E I PDF EI .t-e"+ 8@is"''?ölil:-i:*'WELL PÊR'{II NUÍíB€R RECÊIPT I¡UM8TR 121773. 1001 5 t 99 9¡!El!!¡'1, ¿Elri{l ^PPIJç_A!ÍSIJOHN PLÀTEK ÂPPROVED.Wzu TOCATIOTJ Water D¡vis¡oai 5 Vr'ater O¡stricl: 39 O6s¡gneted Sasnì ñ/A À,lanågrmentOistr¡cl NIA Counly. G RFIELD Percel NaÌp SCUTTËR GULCIi Ld:7 Elek: flli¡!: Physrcäl Addr€ss fvlA ñÊ îi4 SÊ 'll4 $eel¡on 28 TtvlnshrÞ å.0 S Rañge 9? o V,,/ S¡¡l¡ P l'i 3) Vy'ell to bs coûstrucled on spûcif¡åd tråct ol lend PERI¡¡T TO CON5TRUCT A NEW WETL lrll!ilol €ol{ tR r. 1'/4il-R 8tGlll rl ça[sng!$_aElPP_eavÁr Ihrr wf,ll lldll he uferl tl ilth ¿ wðy nr te c¡r!{¡ ûo ttr¿tsl¡l fìlury to e¡rftl'rq wàter nßhlr. llE tisin{c ol thil !¡€îtrrll (krt tct 6iür€ th¡i no ihlury wtl ftcur fo ¡¡dh€. velted w¿ter rilht r precludè ãnothér owner ol ã v€rtêd wðler dqht l.ø teêll¡g r({irl ir ¿ (¡v¡l ctrt ù(tidr Thc conrtructiw of thi! wcll rh¡tt bE i¡ cffipli¡ncf, øth thc wåtrr $/ctl Cñstructi@ Ruts t CfR,t0? :. u¡[cr5 âpproY¡t ol a rônôncp hi5 tÉflì q.¿ntel bf the !l¡te flûl.d ol l.{¡rÈrof,\ d W.ìter \{ell lÞnrlru{tisì ônd l{r¡tt lìrtðllàtio) (únt'¿(ltfs l,ì iccrdðnÊe wlth Rutc 18. Approvèd purrw¡l 1o CRt l7-9l.tt02l3l{bli¡ll(Al ¡i rh€ øty well on ð tr¿ct ol l¡nd ol 15.79 scre! dercnbed ¡3 Lot 7, scutler 6u{dl diúrtur ol lðnd. 6ürf,eld CMty. lhc ü5É ot grwÞd{¡lr:r t.trlr lìri! wr{l i} lifiltcd to lirc protú(rûl, ordir¿ry hftrLhold pqBrt ,Í¡id{ not flrqt thrn thrcc lli grnqle f¡firly dwpllrnlt, ¡hr wat¡n¡{ .rf frßrltry, armerïa ãnim¡lt ¡nd hvFrtøk m ð farm or ranah ¡Õrl the ifi8âtlm of nôt morc th¡n 6c ll i ð(rc ol hffic gàrdcñs ¡nd {ðwnr. lhc pumping r¡tc ol thii wcll shòlt not cxcccd 15 6Pt'1. Ihc return flow trm thc uic of thi: wcll mu3t bc through ¡r indiuduol w¡5trr¿tcr dirpø¡t r}8tñ ol thc nm-cÉpor¡tive typc ,herc the wùler l! retrünBJ lo (he 5ôrne ltredrn tvlteilr ln whlrh the well l! loaú(é{ lrilrwrl (r¡ qoiÉ ó.ì, ì ol thf wð{pr Witl Ccìrtf r¡(r¿* Rills. lhr: wel¡ rûrrlrur:l.tqr .:etrrl(td $ull srÙilìlt the dt.t ullt well(dðti6 ø ?dk øÞ6rta rèqured by Ruld t7. I sthiri ó0 dayr ol compt€tion úf thr wÊtl. lhc ñeã5øcd lo(a¡m mult bÊ ùccul ¡tc 10 200 lcet ot thc ¡ctudl lqdtru:. I he ledtigr {rlqûðti!íl ñult it(lúde d GFS l6¡tig! iU I y, rærdlîùtell 9ùtluùilt tù thê Drlio[ of l'/ile, Retd,ffe! gurd¡ftR!. ADVÄÌ.¡f- F xOIl( F REQülQf D - purrrËnr ro ( fi..r1¡.tiû1 flille ó l.:t .I tl ((R 4112.11, lrc.¡tpd rr prjvilr dnilêß ¿îd n{rmÞ inst¡llcÍs must provids ôdvúncc rotifìcôti@ lby I t:59 pm the d¿y bclqct to the 5tàte tngi¡4cr Frior ro c¡th ol thc fotlodin8 for (l¡t5 s('ll the ttòrt rf e,èll íorrstru:lldr, (he rn[ròt rrr!ðllôtlor of !hú frTlÌ frerùütrÈilÌ ü¡np, ðrr, the uitiðl lilçtôllðilln s/ ô critern tsnecte¡l ¡o lhe w¡ter welt supply syrlem. Âny ch¡nge rn the dåte of aørtrucljd/intt¡llãtiø mht be r€-noli(ed prior to th! drtlu(, (b, l1;5t prÍ thc d¡y l"-'lorc.l. !îfornrútio¡ r¡-'gúrdiilq l¡c ¡Dtìliut¡on prec!! ùild ¿ li'l to r-hc ci('Ltrtli( notrflanrü fôfm .ò[ bè lnr¡nd on thr 0ìvt!ffr of V$¡ler fl.sñlra¡s wehqfF al .Jwr.rnltr¡do,Îov flll [f j Ihlr p$[üt rt¡l crprrtr .nì thf e¡DrttÛ! ¡htf i¡n{¡55 lhf wtrlt rr (ùì!tn[ted bl/ th¡Î dnte Å We(l C,)r!trr(l rffì ¿ûd Ylelil Eetiñ¡te Repon l6vrt'll l mu{ be !!þñltted to Ìhe oi$lid of VJa¡er R6turce! lo rdif/ the wdl har b@n conltructed. Âñ cxtgtrlon ol thr e¡tjrdtldì ddtr rr¡y bc dvdll¡blc Cortd!t thr $\vR lq ¡ddrtiqrd{ hlluartrJtlqr r rclla tu (ftc .ixt(Ir!lø .tqugt lom l(,Vr's-il) ðlaltabl. âli dwr çf,|.¡r¡dô.tov llt_¡TF:fhtrFðrr.t11ltr,¡lediÕth*¡¿FI/{ofîheSFl t.thclf f.iaôfthe5Ff ¡{. lhe!Wlt{of (h.'1Fl/,1, lhF¡lì/lll4ôlthe SE t,i.+ ônd thc Sw 11.4 of úe llt. I ¡4 öf Strtion ?8. Iomthìp 5 süth. R¿ngc t2 wcst ol thr Sixth Prin.ip¡l tlðridiãn. lhc tclt múy [È {{nttru(lcd ùì thc rô. {f¡rr¡innr ¡hs¡¡ llrl p.rñir .¡ll !!l ù61 l:¿l ñr q4 t^ }t¡}\ I tdr.r.(.lin+.yr