Loading...
HomeMy WebLinkAboutSoils Observation 10.05.2021Huddleston-Berry' Enginecring & Tcsting, LLC 2709Riwc*h Paltwy Gard Juncl¡on, CO, 815{tl (9?0) 25ssn5 ¡nlo@huddleslonbêrru.côn SOIL OBSERVATION REPORT Clientr Lucky Seven LLC 336 Eve¡greên Dr¡vs Rifle co 81650 Proiect 10991 CR 320 - Rifle ProiectNumber O2293 - fXX)1 Technician: MallheilÀrdrew UYotk Order No: 75334 Observation llate: Odober S. 2021 Approval: Reviewed by: Jeson Collard Revlew Date: October 18,2021 G.ol¡Ghnl:âl Report Titb: Geot¡chnical Report Autùon Geotecù¡rlc¡l Repoñ l{o E Date: Geolechnical Report Bearing Gapacity, ps* Ircvdopment or Lot Spccifrc Report: 336 Evergreen Drive HBET 02293{Ð01 7t6t2021 150{¡ Lot Specific Sub-Contractor: On Slte Notlflcation: Foundalion Type: Proof.roll equipment: Excaval¡on Lim¡ts, ft: Lucky Ssven Javier Footing / Stem Wall by Soil llpc 0ùscwcd: Nalive ProposedTypcotStructur¡l Fllfo¡llert Llft: - Aúiripe¡ed Thidrnese of Strucùrral Fi[, fr: Distance below Ex¡fÞg Groürd and location of rreasurement är: ' Sunæying and devation valfrJalion are outsile of lhe scope of work and were not performed by HBET. ! Eo cot) Gauge & Date of Calibrôt¡on: Density Counts: Moisture Count3: lllunicipality: Garfiôld 4334 2t8t21 2495 712 x l-¡b*: 21-0417 llax.Drytlens¡ty,pct 12{¡-O trtGrilú Classificdlon: Sandy Siltï Clay Opù llobturc, ol"z 11.5 ProctorType: D698 A Sp€clflcation: 95 , -2 to +2 D698 ä .oiOEËÊo ä a Ê Locat¡on:Ë 'fln åËE år¡¡6o= Proof-roll s Ës ffsı -v, Remarks / Rock Corrected Proctor Vâlues: Not ApplicableNotApplicaHePass I t{ortheastSectim o o 115.0 9.8 6 96% Pass 120 pcl @ 11.5 % Moisture 2 Norülu¡est Seclion O 0 111.7 9.6 6 96% Pass 120 pcÍ @ 1'1.5 % Moisture 3 Southcast Sedion 0 0 115.2 9.6 6 96% Pass 120 pcf @ 11.5 % Moisture 4 Sor¡$wesi Seclion 0 0 115.5 9.9 6 9670 Pass 120 pct @ 1l.5 7o Moisture Cornments: 21-10-5 Huddleston-Berry Enginecring & Tcsting, LLC 27æRiffiilaPadffiy Gmd.k¡ndiql' CO, Itl)t (370)255{ns tnlòôluldldÕllotuffi REVIEW of CONSTRUCTION Client Lucky Seven LLC 336 Evergreen Drive Rife co 81650 Project: 10991 CR 320 - Rifle ProlectNumbo¡: 02293 - 0001 lechnician: MaühawAnôrew Work Ordcr No: 75334 Observation D¡fe: October 5,2021 TypeofWork Soil Revlcmd þr: Jæon Coüad Rwb llate: Oc¡ober 18. 2ll2l GeneralContractor: Subconlrac¡on Lud<ySeven OnSiÞllotlñcalion: Javier Exdanation: A representative of Huddlsston Berry was called to do soil tests br a foundation at 336 Evergreen Drive. Upon anivat, the representative w¡tnessed that the foundation walls had already been placed. The representative took 4 tests within the stem walls of the foundation and informed Javierfrom Lucky Seven that the compaction teets passed and thatthe paperwork for them would be sent over as s(x)n as possible. Diagrams: 21-10-5 B