SOIL OBSERVATION REPORT
Clientr Lucky Seven LLC
336 Eve¡greên Dr¡vs
Rifle
co 81650
Proiect 10991 CR 320 - Rifle
ProiectNumber O2293 - fXX)1 Technician: MallheilÀrdrew
UYotk Order No: 75334 Observation llate: Odober S. 2021
Approval:
Reviewed by: Jeson Collard
Revlew Date: October 18,2021
G.ol¡Ghnl:âl Report Titb:
Geot¡chnical Report Autùon
Geotecù¡rlc¡l Repoñ l{o E Date:
Geolechnical Report Bearing Gapacity, ps*
Ircvdopment or Lot Spccifrc Report:
336 Evergreen Drive
HBET
02293{Ð01 7t6t2021
150{¡
Lot Specific
Sub-Contractor:
On Slte Notlflcation:
Foundalion Type:
Proof.roll equipment:
Excaval¡on Lim¡ts, ft:
Lucky Ssven
Javier
Footing / Stem Wall
by
Soil llpc 0ùscwcd: Nalive
ProposedTypcotStructur¡l Fllfo¡llert Llft: -
Aúiripe¡ed Thidrnese of Strucùrral Fi[, fr:
Distance below Ex¡fÞg Groürd and location of rreasurement är:
' Sunæying and devation valfrJalion are outsile of lhe scope of work and were not performed by HBET.
!
Eo
cot)
Gauge & Date of Calibrôt¡on:
Density Counts:
Moisture Count3:
lllunicipality: Garfiôld
4334 2t8t21
2495
712
x
l-¡b*: 21-0417 llax.Drytlens¡ty,pct 12{¡-O
trtGrilú Classificdlon: Sandy Siltï Clay
Opù llobturc, ol"z 11.5 ProctorType: D698 A
Sp€clflcation: 95 , -2 to +2 D698
ä
.oiOEËÊo
ä
a
Ê
Locat¡on:Ë 'fln åËE år¡¡6o=
Proof-roll
s Ës ffsı -v,
Remarks /
Rock Corrected Proctor Vâlues:
Not ApplicableNotApplicaHePass
I t{ortheastSectim o o 115.0 9.8 6 96% Pass 120 pcl @ 11.5 % Moisture
2 Norülu¡est Seclion O 0 111.7 9.6 6 96% Pass 120 pcÍ @ 1'1.5 % Moisture
3 Southcast Sedion 0 0 115.2 9.6 6 96% Pass 120 pcf @ 11.5 % Moisture
4 Sor¡$wesi Seclion 0 0 115.5 9.9 6 9670 Pass 120 pct @ 1l.5 7o Moisture
Cornments:
21-10-5
Huddleston-Berry
Enginecring & Tcsting, LLC
27æRiffiilaPadffiy
Gmd.k¡ndiql' CO, Itl)t
(370)255{ns
tnlòôluldldÕllotuffi
REVIEW of CONSTRUCTION
Client Lucky Seven LLC
336 Evergreen Drive
Rife
co 81650
Project: 10991 CR 320 - Rifle
ProlectNumbo¡: 02293 - 0001 lechnician: MaühawAnôrew
Work Ordcr No: 75334 Observation D¡fe: October 5,2021
TypeofWork Soil
Revlcmd þr: Jæon Coüad
Rwb llate: Oc¡ober 18. 2ll2l
GeneralContractor: Subconlrac¡on Lud<ySeven OnSiÞllotlñcalion: Javier
Exdanation:
A representative of Huddlsston Berry was called to do soil tests br a foundation at 336 Evergreen Drive. Upon anivat, the
representative w¡tnessed that the foundation walls had already been placed. The representative took 4 tests within the
stem walls of the foundation and informed Javierfrom Lucky Seven that the compaction teets passed and thatthe
paperwork for them would be sent over as s(x)n as possible.
Diagrams:
21-10-5 B