Loading...
HomeMy WebLinkAboutReport from Architect 03.28.2022Jordan Architecture lnc. PO Box 1031 Glenwood springs, co 81602 97O-6L8-6690 email: bradjordanarchitect@gmail.com website: jordanarchitecture.com 28 March 2022 Matt Provost Building lnspector RE: BLRE-03-2L-6732 David Rippy Project/MDHWD LLC 803 Donegan Road, CR 130 Matt, The builder requested that the bearing wall at the existing lower level be opened up' This was structurally accomplished by adding a 4-5 Tr" LVL header beam, supported on each end by 4-2x8 stud pack. Please feel free to contact me with any questions. Respectfu I ly su bm itted, Brad Jordan Brad Jordan Principal Architect, CO 202968