HomeMy WebLinkAboutReport from Architect 03.28.2022Jordan Architecture lnc.
PO Box 1031 Glenwood springs, co 81602 97O-6L8-6690
email: bradjordanarchitect@gmail.com website: jordanarchitecture.com
28 March 2022
Matt Provost
Building lnspector
RE: BLRE-03-2L-6732
David Rippy Project/MDHWD LLC
803 Donegan Road, CR 130
Matt,
The builder requested that the bearing wall at the existing lower level be opened up'
This was structurally accomplished by adding a 4-5 Tr" LVL header beam, supported on
each end by 4-2x8 stud pack.
Please feel free to contact me with any questions.
Respectfu I ly su bm itted,
Brad Jordan
Brad Jordan
Principal Architect, CO 202968