HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLRE-03-22-7391
ASPEN WIT LLC
NEW S/F DWELLING W/ ATTACHED GARAGE
303 GOLDEN BEAR DRIVE, CARBONDALE
FAIRWAYS AT ASPEN GLEN, LOT FW-B
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE
(r.R.c.)AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l,E,C.C.)
2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED
IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS", NUMBER
REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST,
3) ELECTRICAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC
BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION,
ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION &
CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION
AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE
AND LOCAL FIRE DISTRICT.
5) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED
SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE -
INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS _ IS IN
COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE
REOUIREMENTS.
ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION 1500 PSF
7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME
OF FRAME INSPECTION.
8) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REOUIRES SPECIAL
I NSPECTOR, PROVI DE APPROVAL REPORT AT FRAM I NG I NSPECÏION.