Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT BLRE-03-22-7391 ASPEN WIT LLC NEW S/F DWELLING W/ ATTACHED GARAGE 303 GOLDEN BEAR DRIVE, CARBONDALE FAIRWAYS AT ASPEN GLEN, LOT FW-B 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (r.R.c.)AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (l,E,C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN THE ATTACHED "GARFIELD COUNTY BUILDING REQUIREMENTS", NUMBER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST, 3) ELECTRICAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH.IN APPROVAL IS REOUIRED AT FRAME INSPECTION, ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) A LOT TMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS REOUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE - INCLUDING ROOF OVERHANGS, DECKS AND OTHER PROJECTIONS _ IS IN COMPLIANCE WITH MINIMUM SETBACKS AND/OR BUILDING ENVELOPE REOUIREMENTS. ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION 1500 PSF 7) PRE-ENGTNEERED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. 8) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REOUIRES SPECIAL I NSPECTOR, PROVI DE APPROVAL REPORT AT FRAM I NG I NSPECÏION.