Loading...
HomeMy WebLinkAboutGeotechnical Investigation & OWTS Design 06.07.2021Huddleston-Berrl' Engincming st Testing, LLC 2789 lìiverside Parkway Grand .lunctio¡r, Coloraóo 8ì 5û I Phone: 97G255-8005 Fax: 970-255-ó8 l8 I*fo@huddlestonbary.com lw*?,2þ21 Project No. : 02239-000 I Keith and Hanna Wittenberg 243 Elk Ridge Drive Glenwood Springs, CO 81601 Attention: Mr. Keith l#ittenberg Subject:Construction Materials Testing and Special Inspections 233 Elk Valley Lane New Castle, Colorado Reference Geotechnical Investigation & OWS Design Parcel ilfiA720Ì 138, by Huddleston-Berry Engineering & Testing, LLC, dated May 12, 2021, far Keith and Hanna Wittenberg, Project # 002176-û001. Dear Mr. Wittenberg, A representative of Huddleston-Berry Engineering and Testing,LLc (HBET) observed the foundation excavation and tested the soil compaction on May 24, 25 ,28 a¡rd June I, 202 I . Periodic testing for the subject project is complete and any exceptions have been corrected. A site specific Report was not conducted forthis lot. The open hole inspection indicated that the subsurface soil conditions on the lot are consistent with the referenced report. Therefore, based upon the recommendations in the referenced report, results of the open hole inspection, and results of the field density testing the subgrade is adequate for foundations constructed in accordance with the Geotechnical Report using a Maximum Allorvable Bearing capacity of 2000 psf. As of June l, 2ù2I, during the final testing and observations of the structural fill material for the building pad there lvere no installation of utilities and or concrete forms. Any future disturbances to the building pad require retesting and observations prior to concrete placement. HBET appreciates the opportunity to offer services úo your project. If you have any questions please call (9?o) zss-8oos. Respectfully Submitted Huddleston-Berry En g and Testing, LLC Jesse Project Manager / RSO / ICC Special [nspector