HomeMy WebLinkAboutApplication>tsFu¡2ã.'..r .i o-IgÉ
r'Þ Í1H'-, J>-
'-' llJ b.Í:l |l. 5?-t É,-<=
fÐà3
J
l¡J
u¡
O
UJÉ
Community Development Department
108 8th Street, Suite 401
Glenwood Springs, CO 81601
lp7ol94s-82L2
www. ga rfield-countv.com
Gørfield CounQt
BUILD¡NG PERM¡T
APPt¡CATION
TYPE OF CONSTRUCÍION
Commercial/Multi-Demolition
Manufactured Home (Single or Multi-Level)
Residential (SF, Duplex or Townhome)Reroof
lXlAccessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET
INVOTVED PARTIES
Property Ownen
Mailing Address:
Email Addressr
løw
À- Phone:rZst t 6LQ kL5?It.*+t4
B{JËå "Ütt>*¡utxtr> er>
iå.t**s- @,- t*-¿*9"'fæg#ñ*'ê*l " {-lþv¿'\çt
,wTZ,*r*''"?s'er-ì *Contractor:Phone¡
Mailing Address
Email Address:
&?e)A #Lçp Lonc.g H*çÞ
Phone:Arch¡tect:
Mailing Address
Email Address:
r3 $KVf. $rß,æfi¿fir{* @- a"arv U
1Ò ¿{tÀ? -\?A Wx 4",Õ. Ë¡*qsrÞLj"_
\È"L phone:r of?ô tq?3,9rlc:Engineer:
Mailing Address:
Email Address:
Phone:Manufactured Home lnstaller:
Mailing Address:
Email Address:
PROJECT DETAILS
JobAddress: l{.ld}{"} WX- (2t!*{,4-þ.;-lp: . . &f7" ii '.'.:o .
Describe Work:
I R'qte Êus¿'Je, ËkÆfÆr
Addition
*\)fi{
dqz-Ò &/p7 Height:
Repode
t
â2-
diå. diï A
Sq. Ft. of Building:
Sub.
Owner's Valuation of Work: $Property Size (Sq. Ft. or Acres):
fof
Assessor's Parcel Number:üq3ö o€t I t..'r,. i
4o
Lot 'Block
I
DeLaclrerlGarãgë:hed
IOWTSSeptic:
Type of Heat:ral Gas Propane Other
Community
Electric
Authoriw, This application for a Building Permit must be signed by the Owner of the property, described above,
or an authorized agent. lf the signature below is not that of the Owner, a separate letter of authority, signed by
the Owner, must be provided with this Application,
Legal Access. A Building Permit cannot be issued w¡thout proof of legal and adequate access to the property for
purposes of inspections by the Building Division.
Other Perm¡ts. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit,
(3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access
or a State Wastewater Discharge Permit.
Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days
of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement.
CERTIFICAT¡ON
Permlt f:
NOTICE
Driveway
Permit:
I hereby certify that I have read this Application and that the information contained above is true and correct. I
understand that the Building Division accepts the Application, along with the plans and specifications and other
data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming
completeness of the submittals and approval of this Application, a Building Permit will be issued granting
permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by
the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will
comply with provisions of any federal, state or local law regulating the work and the Garfield County Building
Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the
Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use
of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any
other applicable law.
I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I
further acknowledge that the issuance of the Building Permit does not prevent the Building Official froml (1)
requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping
construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other
applicable law. Review of this Application, including submittals, and inspections of the work by the Building
Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or
discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws
and County Regulations rest with me and my authorized agents, including without limitation my architect
designer, engineer and/ or builder.
PROJECÍ DETAILS CONTINUED
! L^---L-.. ^,-L.-^..,1--J^Ã +l+++ I l++.,a.^^'¡ --,t '.*¡l¡¡¡+a+¡l +116 Àl^+i.ô =nr.l aa*ifi¡a+ian rharra ¡c.¡a!l as havoI llcl Egt olnrlvwlçsGiç ¡rvrr Y'Y'!,
provr ded the required information which is correct and accurate to the best of my knowledge.
*f wk->-
and Sign Date
zè22,.oFFtcrAr âor{.ql G,e. a3./tID
atbaúed Ø/Vb|TTAA/SSpecial Conditions:Õee
Manu. Home Fee:
fiå¡eA þ):ËËË'p /,4ryAdiusted Valuationr¡qô.d41ry Plan CheckFee:
lon4.q8
Perm¡t Fee: -
1.10,76
OWTS No:
Pl 'tð't'- * r.1 J Ê-& .+
'f(:'l I €, tJ Ë a
Fees Paid:
* f -r*ri ös?¡td$rs4"L. I 'i
Balance Dç;
8ã0. r"BP No:
fÞ r r.l É..' "*F T nì " ?¡-rt.ra's. ¡,9 dc
Totâl /ees:
1,66,71
Zon¡ng:
ilu;¡i¿¿
Setbaóksr OCC Grouol'1p,ry Const. TVne:ræ,
BUITDING / PTANNING DIVISION :
DateSigned Approval
4-8-zz*t
Garfield CounQ
BUILDING DEPARTMENT
708 Eíghth Street, Suite 407, Glenwood Spr¡ngs, CO 81607
Tel: (970) 945-8272
PLAN REVI EW CH EC KLIST
Permit No: ø LRE- â7-ZZ4ëÇ2.
Building lssues Planning/Zoning lssues KU&A
ege+Driveway permit
Read,ü.7€ Surveyed Site Plan
-Je-,?ffi,K^KK7
Engineered Foundation
Grade/ Topography 30%
Attach Residential Plan Review List
Subdívision Plat Notes
Fire Department Review
Valuation Determ ination/ Fees
Red Line Plans/ Stamps/ Sticker
Application Signed
Plan Reviewer to Sígn APPlication
Parcel/ Schedule No.
40# Snowload Letter - Manu. Homes
Property Line Setbacks
30 ft. Stream Setbacks
Flood Plain
-- Building Heíght
Zoning Sign-Off
Grade/ Topography 40%
Planning lssues
Subdivision Plat
y ø Road lmPact Fees
|,sA
ØAttach conditions å -^Ç-le 4
Descriptí on & Summarv:
-- soits Report K*A 2l-Vø/
?zs/AÞL(
u'.":
V ,rf orf krt a/ Corylaze:_ receúr4 daþd 7.8,202,?
R,t= áÒ.> : t 47
fLo 428 x 74,bØ= b?,,3Ø:4
crail)l 47( r tg = /bt70r
+eP lÀ 2z+ Y tg = qravz-
ad¡'uø/*J b'|il'
,
'híþt¿ Ørr€afr"ûts
¿lúnnV*rhst¿ P-ua/ 7
la/uaHon
7u
?7oaî,ol
t
Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses
specified. Pre-manufactured structures require the engineers stamp, signature and date.
Framing /connection details, braced wall lines, shear wall schedule, location and hold downs.
NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf
determined by the Building Official that additional information is necessary to review the application
and/or plans for compliance, the application may be placed on hold until the required information is
provided. Work may not proceed without the issuance of a permit.
The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as
well as any Road lmpact fees will be collected when the permit is issued.
The permit application must be signed by the owner or by person having written authority from the owner
to act as their representative.
Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a
CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO
inspection requirements will be attached to your approved field set of plans.)
I hereby acknowledge I have read, understand and will abide by the requirements of this
checklist.
a
a
s[Øl z8-
Property and Sign Date 3lø/az-
. Additional Dwelling Units may require Administrative Review.. A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups,
unless the homeowner is performing the work.
BUILDING PLANS: 2 sets of plans nrust be subrnitled. Plans nrust be 18"x24" minimum size, complete,
identical, legible and to scale. All plans will be checked at the counter for completeness. lf any of the
required information is missing, the building permit application cannot be accepted.
SITE PLAN: Please make sure the following information is provided on the site plan.
. PropertV address/legal description.. North Arrow and Scale on each page.
. Show all property lines, building envelopes, flood plain and easements.. Provide setback distances from boundaries, buildings, septic, well and waterways.. Location and direction of the county or private road and driveway accessing the property.
. Proposed and existing structures. lnclude sheds, barns, decks, patios, and any other buildings.. Existing and proposed grade, positive drainage around structure (to be contained on site).. Streams, rivers, creeks, springs, ponds and ditches.. Existing and proposed wells, septic tanks, leach fields and other systems (if applicable).. Retaining walls (engineer stamped detail required for walls over 4 ft., measured from bottom of
footing to top of wall).
NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property
line or not within an established building envelope shall be prepared, stamped and signed by a licensed
surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision
final plat with the proposed structure located in the building envelope.
ARCHITECTURAL PLANS: Please provide the following information on the architectural plans.
. Minimum of four (4) elevations (N,S,E,W). lndicate height of building measured from existing
grade to the midpoint between the ridge and eave of a gable or shed roof or to the top of a flat
roof.. Floor plans for each level, including dimensions and scale noted.. Clearly label each room or space (bedroom, bath, kitchen, closet, etc).. Show the location of the mechanical equipment.o Building cross sections with construction details.. Window sizes, types and operation noted on the floor plans or elevations.. Specify roof slopc/pitch, roof covcring and siding matcrials.. Stair and guard details specifying rise, run, height and spacing.. Attic, roof and crawlspace ventilation details. lndicate size and location of ventilation openings.¡ Minimum insulation shown for walls, floors, roofs/ceilings, slabs, basements and crawlspaces.. Provide stove and fireplace make, model, EPA or Colorado Phase ll Certification. Masonry
fireplaces shall be designed to the lnternational Residential Code (lRC) requirements.
STRUCTURAL PLANS: Please provide the following information on the structural plans.
¡ SOILS REPORT - lf the project is located in a subdivision with a final plat requiring site specific
soils investigation report or if Structural plans make a specific reference to a soils report, then a
copy of the soils report is required to submit a building permit application.. Design specifications to include roof and deck snow load, wind and seismic design and frost
depth.. Foundation plan showing complete footing and foundation dimensions.r Footing and foundation details specifying reinforcement and referenced on plans.
GørfuId County
BUILDING DEPARTMENT
108 Eighth Street, Suite 401, Glenwood Springs, CO 81601
Tel: /970) 945-8212
Property Ownerts Certificate of ComplÍance
Accessory Dwelling Unit (ADU)
Effective Dote: October 79,2020
The undersigned property owner certifies thøt the øttoched Building Permít Applicotion
for Accessory Dwellíng llnit (ADU) is in complionce with the followíng list of støndørds,
regulotions and requirements for ADIJs per Gorfield County's Land Use & Development
Code os amended on October 79,2020.
L. Floor Area - Maximum floor area of ADU shall not exceed 1,000 square feet (excluding garage).
2. Ownership Restriction - ADU is restricted to leasehold interest (cannot be sold or subdivided).
3. One ADU per Lot - A maximum number of one ADU is allowed per lot.
4. Legal Access - Property Owner confirms legal access to proposed ADU as illustrated on site plan.
5. Water - Property Owner represents that they have notified either: (a) the¡r water supplier to
address additional tap fees (if applicable) or (b) State of Colorado's Division of Water Resources
to secure any necessary water rights to supply legal water to the ADU.
6. Sewer - Property Owner represents that they have notified either: (a) their sewer & wastewater
provider to address additional tap fees (if applicable) or (b) alternately, if an on-site wastewater
treatment system (OWTS) is employed, limitations on the number of occupants using the ADU
shall not exceed maximum recommendations of existing/proposed septic system per State of
Colorado's OWTS standa rds.
*1MSE_NøIE: This form witt be digitally scanned into the Community Development Deportment's office records
and witt be avoilable for public view ond reference in any future title seorches for the subiect property.
I hereby acknowledge having read the preceding checklist and agree to abide by these
requirements.
G z4r 2Lñ
Property Owner(s) Signature Date
OFFICE E ONLY:
Assessor's Parcel Number lD Number:
Building Perm¡t Number Reference:
Gartied County Land Use & Development Code Accessory Dwelling Units - 2020 Update
DIVISION 7. ADDITIONAL STANDARDS FOR RESIDENTIAL USES,
7.701. ACCESSORY DWELLI G &UN
A lot may be permitted to have either an Accessory Dwelling Unit or a Secondary Dwelling Unit
in addition to a Single-Unit Dwelling, but not both.
A. Accessory Dwelllng Unlt Standards
f) Maximum FloorArea.
The Floor Area of an ADU shall not exceed 1,000 square feet.
2l Ownership Restriction.
An ADU is restricted to leasehold interest in the dwelling unit and is for
residential or Home Office/Business use only.
3) Gompliance with Building Gode.
Construction shall comply with the standards set forth in this Code and with
Building Code requirements.
4l One per Lot.
One Accessory Dwelling unit which is subordinate to a Single-Unit (primary)
dwelling unit is allowed per legal lot.
B. Secondary Dwelling Unit Standards
f) Maximum FloorArea.
The Floor Area of a Secondary Dwelling Unit shall not exceed 1,500 square feet
for a lot less than 4 acres. The Floor Area of a Secondary Dwelling Unit shall not
exceed 3,000 square feet for any lot 4 acres or greater.
2l Ownership Restriction.
A Secondary Dwelling Unit is restricted to leasehold interest in the dwelling unit
and is for residential or Home Office/Business use only.
3) Compliance with Building Code.
Construction shall comply with the standards set forth in this Code and with
Building Code requirements.
4) Minimum Lot Area.
The minimum Lot Size for a Secondary Dwelling Unit is either:
a. 2 acres, or
b. For lots in zone districts with a minimum Lot Size of less than 2 acres, the
minimum Lot Size is twice the minimum required Lot Size.
5) One per Lot.
One Secondary Dwelling unit which is subordinate to a Single-Unit (primary)
dwelling unit is allowed per legal lot.
Garfield Caunty Land Use & Development Code Accessary Dwelling Units - 2020 Update