Loading...
HomeMy WebLinkAboutApplication>tst- t¡J Ê ËãE E .î -.ëUJ æ utE s Ë=d- ff - ıã Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 l970ls45-8212 www.ga rfield-cou ntv.com Garfield County BUILDING PERMIT APPLICATION TYPE OF CONSTRUCNON Commercial/Multi-Fam Demolition Manufactured Home (Single or Multi-Level) I Residential (SF, Duplex or Townhome)Reroof Dwell Unit U - MAXIMUM SIZE OF 1 SQUARE FEET INVOLVED PARTIES EmailAddress: Lee Gehrett 31 96662Property Owner: Emait Address. gngservicesllc@gmail.com 970Phone: Phone: Mailing Address: 864 CR 323 Rifle, CO 81650 Contrector: Mailing Address: Architect: *f m 6 f ronq Slee I Phone: t60o l3¿lS ¿'lú/0 el . Co*11r/ tJ ,s f0n Mailing Address: Email Address: Mailing Address Emait Addresr. dustin@dbsd.com Engineer:DB Structural Design Phone. (970 t319-5934 EmailAddress: PhoneManufactured Home lnstaller: Mailing Address Describe 1¡¡or¡. New Pre Engineered Metal Building garage/shop PROJECT DETAITS Job Address: 864 CR 323 Rifle, CO 81650 Assessor's parcet Number: 217 531200052 Sub. Sq. Ft. of Building: Lot 3000 20'Height: 172, o"oOwne¡rs Valuation of Work: Block Property Size (Sq. Ft. or Acres):5.11 # of Floors: 1 Remodel/Alteration ./ Class of Work:ew Addition Garage:Attached Detached Driveway Permit: PROJECT DETAITS CONTINUED Septicr Community Type of Heat:ral Gas Propane Electric Other mpt Permit #: NOTICE Authoritv. This application for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Multiple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that I have read this Application and that the information contained above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law, I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect d eer an or builder I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. Lse Gehrett 3122122 Property Owner Print and Sign Date oFFrcrALusEoNLY P¡'|D.5g.$f c.e,. ol/ZS/za ^ee cfl/vÞ/T7o/vs T2 ToSpecial Conditions Permit Fee:1q7,75 Manu. Home Fee: ñÀ Misc. Fees: , ^N,/ftValuation:Adiusted''72,ooo Plan Check Eee:6rg,l+ Balance Due: -7q-7.75 BP No: Br¡f,-1q()2 OWTS No: ìrà *"i:tåi b,zq Fees Paid: *5lt.st Const. Tvoe:l'eu Zoning:RUTAISetbícks: r OK OCC Group: IP.L hlJ,',rlh.BUTTDTNG / PTANNING DTVTSTON Signed Approval Ll-b-22 Dete Garfield Coun$ BUILDING DEPARTMENÍ 108 E¡ghth Streel Suite 407, Glenwood 'príngs, CO 87607 Tel: (970) 945-8272 PLAN REVIE WCH EC KLIST Permit No:Bt߀ -07-22-74o2 Building Issues ØÈ Engineered Foundation Driveway Permit Surveyed Site Plan Septic Permit and Setbacks Grade/ TopograPhy 30% _/ Subdivision Plat Notes N4 Fire Department Review -//' ValuationDetermination/Fees æ Red Line Plans/ StamPs/ Sticker prinÞ Pla n n ing /Toning lssues t_ Nrt ñ^ t\ñ Property Line Setbacks 30 ft. Stream Setbacks Flood Plain Building Height Zoning Sign-Off Road lmpact Fees Grade/ Topography 40% Planning lssues Subdivision Plat egcnPl-iø^ nlq,) 5 + a-Lrþttach Conditions Application Signed Plan Reviewer to Sign APPlication Parcel/Schedule No. 40# Snowload Letter - Manu' Homes Soils Report Ò4 Descri n & Summa w,gÚr- 1** z+-71oØ 1'ú4leà" bu;td;^3 Vc.[ uLa}r e'r\ l+-ø t-tt-z proJ;. z4ob{rcÐl tóaDP6r Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. 5-rJ-22 Property Owner and Sign Date a a