HomeMy WebLinkAboutConditions of PermitcoNDlilo NS OF PERMIT
B LM F-03-2 2-7 408
sEPT-03-22-7 409
MMME WG LLC
NEW MANUFACTURED DWELLING
49893 HWY 6 & 24, GWS
SEC.O1 , T.0ó, R.90 - 21 8301 1 00070
MANUFACTURED HOUSES ARE REGULATED & INSPECÏED BY COLORADO DEPT.
oF HOUSING (C.D.O.H.)AND ALL FACTORY-BUTLT RESTDENTIAL STRUCTURES
INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR
MANUFACTURE AND INSTALLATION AT THE JOB SITE.
1) FOUNDATTON CRAWL SPACE & S|TE COVERED DECK/PATIO SHALL COMPLY WITH 2015
I.R.C., 2OO9 I.E.C.C. AND MANUFACTU RER'S I NSTALI.ATION REOU IREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENÏS AND
MAN U FACTU RER'S INSTALI-ATION REOUI REMENTS.
3) ALL PLUMB|NG AND cAS ptptNG CONNECTIONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
4) ELECTRTCAL pERMtTTtNG AND tNSPECTIONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT BASEMENT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF
OCCUPANCY.
5) pRtoR TO FTNAL BUtLDtNc tNSPECT|ON & CERTIFICATE OF OCCUPANCY, PROVIDE
BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S
PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER
TREATMENT SYSTEM.
ó) cARF|ELD COUNry BUtLDtNG DEPT. TNSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPÏH &
UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST
FOOTING INSPECTION, 1,500 PSF.
B. FOUNDATION
C. SEPTIC SYSTEM CONNECÏION
D. PLUMBINGiGAS
E. SITE / BASEMENT LIVING AND EXTERIOR DECK FRAMING
F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY'I
*NOTE; GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA ÏO BE
AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY