Loading...
HomeMy WebLinkAboutConditions of PermitcoNDlilo NS OF PERMIT B LM F-03-2 2-7 408 sEPT-03-22-7 409 MMME WG LLC NEW MANUFACTURED DWELLING 49893 HWY 6 & 24, GWS SEC.O1 , T.0ó, R.90 - 21 8301 1 00070 MANUFACTURED HOUSES ARE REGULATED & INSPECÏED BY COLORADO DEPT. oF HOUSING (C.D.O.H.)AND ALL FACTORY-BUTLT RESTDENTIAL STRUCTURES INSTALLED IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. 1) FOUNDATTON CRAWL SPACE & S|TE COVERED DECK/PATIO SHALL COMPLY WITH 2015 I.R.C., 2OO9 I.E.C.C. AND MANUFACTU RER'S I NSTALI.ATION REOU IREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REOUIREMENÏS AND MAN U FACTU RER'S INSTALI-ATION REOUI REMENTS. 3) ALL PLUMB|NG AND cAS ptptNG CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 4) ELECTRTCAL pERMtTTtNG AND tNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT BASEMENT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REOUIRED FOR FINAL INSPECTION & CERT. OF OCCUPANCY. 5) pRtoR TO FTNAL BUtLDtNc tNSPECT|ON & CERTIFICATE OF OCCUPANCY, PROVIDE BUILDING INSPECTOR WITH FINAL APPROVAL / SIGN-OFF FROM GARFIELD COUNTY'S PUBLIC HEALTH DEPARTMENT FOR INSTALLATION OF THE ON.SITE WASTEWATER TREATMENT SYSTEM. ó) cARF|ELD COUNry BUtLDtNG DEPT. TNSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS DESIGNED AT 1,500 PSF, VERIFY 3ó INCH MINIMUM FROST DEPÏH & UFERGROUND INSTALLED. OPEN HOLE SOILS REPORT IS REOUIRED AT FIRST FOOTING INSPECTION, 1,500 PSF. B. FOUNDATION C. SEPTIC SYSTEM CONNECÏION D. PLUMBINGiGAS E. SITE / BASEMENT LIVING AND EXTERIOR DECK FRAMING F. FINAL INSPECTION & CERTIFICATE OF OCCUPANCY'I *NOTE; GARFIELD COUNTY REOUIRES C.D.O.H. INSTALLATION INSIGNIA ÏO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY