Loading...
HomeMy WebLinkAboutGrading PlansI Ë ì P c P Ë 4 v d ü É ö ü +2 WilliãrñS? PRELIMINARY ALIGNMENT SHEET SET FOR COTTONWOOD DRIP CUTOUT 24'' NATURAL GAS PIPETII{E PICEAI{CE SOUTH GATHERING GARFIELD COUNTY, COLORADO nstE,H-p; ISSUED FOR AREA REVIEW SHEET INDEX: VICINITY [/AP NTS SHARRARD PARK PUCKET/ NOGLE ANVIL POINTS '€f t .a-' I 10/FRoM PÀRACHUTE cotoBADo RIVER No.SHEET NAME DESCRIPTION I CO- GARFIELD_CIf DCO-COVER-IFR COVER SHEET )CO_GARFIELD_CIf DCO-GNOT_IFR GENERAT NOTES SHEÐT 3 CO-GARFIELD-CIIDCO-GNOTz-IFR GINERAI NOTES SHEET 4 CO-GARFIELD-CIÍDCO_INDEX-IFR ALIGNMENT INDEX SHEET 5 CO-GARFIELD-CIfDCO-AtIGNl -IFR PUCKET/NOGLE DRIP CUTOUT AIIGNMENT CO- GARFIELD_CWDCO-FAB 1 -IFR PUCKET/NOGIE FABRICATION ASSEMBTY 7 CO- GARFIELD-CWDCO_FAB2-IFR PUCKET/NOGtE I'ABRICATION ÁSSEMBLY I CO-GÁRFIELD-CWDCO-FAB3-IFR PUCKET,/NOGIE FABRICATION ÁSSEMBtY I CO-GARFIELD-ClfDCO-ALIGNz-IFR SHÁRRÁRD PARK DRIP CUTOUT ALIGNMENT 10 CO-GARFIELD-CIIDCO-TAB4-IFR SHARRARD PARK FABRICATION ÀSSEMBLY CO-GARFIILD_CI{DCO-tr'AB5-IFR SHÂRRARD PARK FABRICATION ÀSSEMBLY CO-GARFIEtD-ClrDCO-FAB6-IFR SHÀRRÀRD PARK FABRICATION ÂSSEMBIYAPRIL 2022 : gl XXXXXX ülz¡ Hl Ø O ,l ù.ÐF z N FÞoFÞ C) a ! âoo zôFFo L) úUl! ØFf¡ rÐ Ø Fzgàzrl I CONTRACTOR NOTTS: 1. ALL EXISTING UTILI-TY DATA IS PROVIDED FOR INFORMATIONAL USE ONLY. ALTHOUGH 'THE DATA IS SHOWN AS ACCURATELY AS POSS¡BLE, THE CONTRACTOR IS CAUTIONED THAT THE DEVELOPER AND THE ENGINEER NEITHER ASSUME NOR IMPLY ANY RESPONSIBILITY FOR THE ACCURACY OF THIS DATA. 2. THE CONTRACTOR IS TO VERIFY LOCATION AND ELEVATION OF ALL EXISTING UIILITIES PROR TO CONSTRUCÌION, 3. ALL CONÍRACTORS/SUBCONTRACIORS PERFORMTNG WORK ON TH|S PROJEC-I SHALL FAMILIARIZE IHEMSELVES WITH THE SIIE AND SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECÏLY OR INDIRECTLY FROM THEIR OPERATIONS. ANY REMOVAL OR DAMAGE IO EXISTING IMPROVEMEN'TS SHALL BE REPLACED OR REPA|RED By rHE coNTRAcroRS AT THErR EXPENSE AND SHALL BE AppRovED By fHE owNER/REp. sAtD EXts-lNG IMPROVEMENTS SHALL INCLUDE BU'I NOI BE LIMITED fO BERMS, DITCHES, FENCES AND PLANfS. 4, ALL CONS'TRUCTION, TESTING AND MÀÌERIALS SHALL MEET OR EXCEED ALL REQUIREMENIS OF THE PERMITÍING AGENCY NÁME AND THE GOVERNING ACENCY NAME, 5.6. AII -ÍFSTING SHALL BE DONE BY AN APPROVED LAEORATORY AT THE EXPENSE OF THE CONÍRACTOR. 7. PRIOR TO CONSTRUCTION, ALL COÑTRACTORS SHALL TAMIL]ARIZE 'THEMSELVES WIH ]HE CONTRACT DOCUMENTS AND SPECIFICATIONS. THE PLANS INCLUDING ALL NOIES, IHE PERMITTTNG AGENCY NÂUE AND GOVERNING AGENCY NAME SPECIFICATIONS AND ANY OÍHER APPLICABLE STANDARDS OR SPECIFICATIONS RELEVANT TO ÏHE PROPER COMPLETION OF ÌHE WORK SPECIFIED, FAILURE ON fHE PART OF THE CONTRACTORS TO FAMILIARIZE -THEMSELVES WIIH ALL STANDARDS OR SPECIFICATIONS PERTAINING TO 'IHIS WORK SHALL IN NO WAY RELIEVE THE CONÏRAC-TORS OF RESPONSIEILITY FOR PERFORMING THE WORK IN ACCORDANCE !!IIH ALL SUCH APPLICABLE STANDARDS ÀND SPECIFICATIONS. B, CONIRACIORS SHALL HAVE IN THEIR POSSESSION, PRIOR TO COÑSÏRUCIIOÑ, ALL NECESSARY PERMITS, LICENSES, BONDS, INSURANCE, ETC. CON-TRACTORS SHALL EACH HAVE AT LEAST ONE SET OF APPROVED EÑGINEERNG PLANS AND SPECIFICATÍONS ON_SITE AÌ ALL TIMES. 9. IN fHE EVEN-T THAt AN ITEM IS NOf COVERED IN THE PERMITTING AGENCY NAME OR GOVERNING AGENCY NÁUE CONSTRUCTION SIANDARDS AND SPECIFICA'TIONS AND DETAILS, THE S-TANDARD SPECIFICAÌIONS FOR PUBLIC WORI(S coNSTRUcloN sHALL AppLy wrH coNcuRRtNG NotFtcAfroN To -rHE owNER/REP AND pRoJEc-I ENGtNEER. THE oWNER/REP SHALL HAVE THE FINÀL DECISION ON ALL CONSTRUCTION MATERIALS, METHODS AND PROCEDURES. 10. CONTRACTORS MUST CONFNE THEIR ACTIVITIES TOÌHE WORK AREA. NO EÑCROACHMENÌS ONIO DIVILOPED AREAS WLL BE ALLOWED, ANY DAMAGE RESULTINC THEREFROM SHALL AE THE CONTRAC'IOR'S RESPONSIBILITY TO REPAIR. 11. IT WLL BE tHE RESPONSIBILI-TY OF EACH CON'IRACTOR TO PROTECT ALL EXISTING PUBLIC AND PRIVA'TE UTILI'IIES THROUGHOUT THE CONSTRUCÌION OF THIS PROJECI. CONTRACTORS SHALL CONTACT THE APPROPRIATE UIILITY COMPANIFS FOR LINE LOCATES PRIOR TO COMMENCEMEN'T OF CONSTRUCTON AND SHALL ASSUME FIJLL LIÄBILITY FOR ANY DAMAGFS CAUSED TO THOSE COMPANIES' FACILITIES. 12, TR€NCHES WHICH LIE OUTSIDE EXISTING OR FUTURE PAVEMENTS SHALL BE BACK_FILLED ABOVE lHE TOP OF THE EMBEDMENT AND COMPACTED TO 95% PROCTOR DENSITY. 13. EMBEDMENT SHALL BE AS PER PERMITTING AGENCY NAME OR GOVERNING AGENCY NAME STANDARO DETAILS, 14, TOP OF NA'TURAL GAS PIPELNE SHALL BE A MINIMUM OF ____ BELOW TI]E FINISHED GROUND ELEVATION EXCEP'T WHERE SHOWN OTHERWSE IN 'IHESE PLANS. 15, CONÌRACIOR SHALL BE RESPONSIBLE FOR MAINTAINNG TRENCH SAFETY REOUIREMENTS IN ACCORDANCE WÏH STÀNDARD WLLIAMS TRENCH SAFETY GUIDELINES. EROS]ON CONTROL NOTTS: 1. ADEOUA'IE MEASURES SHALL BE TAKEN TO PREVENT EROSION. IN THE EVENT THAT EROSION OCCURS AS A RESULT OF CONSTRUCTION, THE CONTRACTOR SHALL RESTORE THE ERODED AREÀ TO I'TS OR]GNAL CONDITION PRIOR IO HYDROMULCHING. 2. THE NATIONAL POLLU'TANT DISCHARGE ELIMINATION SYSTEM (NPDES) SITE NOTCE SHALL BE POSTED AT THE SIÌE BY THE CONTRACIOR IN CONFORMANCE WTH THE GENERAL PERMIT FOR SIORM WATER OISCHARGES FROM CONSTRUCÍION AC-TIVITIES LOCA'TED IN 'THE STATE OF COLORADO. 3- THE OWNER AND CONTRACTOR SHALL PROVIDË CERTIFIED S'TA'TEMEN'TS IO GUARANTEË COMPLIANCE WTH THE GENERAL PERMIT FOR STORM WA'ÍER DISCHARGES FROM CONSÌRUCTION AC'TIVITIES WiIH fHE STORM WATER POLLUTION PREVENTION PLAN, 4. ALL CONSIRUCT¡ON, EROSION CONTROL MEASURES, AND STORM WAÌER DISCHARGES FROM IHE SITE SHALL ADHERE TO TI-IE GENIRAL PERMII FOR STORM DISCHARGES FROM CONSIRUCTION ACIIVIÍIES. 5. THE CONTRACÍOR SHALL DISCLOSE TO THE PERMIT-TING AGENCY NAME'S ENVIRONMENTAL DEPARTMENT LOCAÌIONS OF OFF-SITE BORROW AREA AND PROVIDE EVIDENCE OF COMPLIANCE W¡TH ALL APPLICABLE LAWS, ORDINANCES, AND REGULATIONS. 6. THE CONTRACTOR SHALL DISCLOSE TO THE PERMìTTING AGENCY NAME,S ENVIRONMENTAL DEPARTMENT LOCATIONS OF OFF_SITE EQUIPMENT STORAGE AREAS. LEGEND: -lD- AS BUILT WILLIAMS PIPELINE EXISTNG WILLIAMS PIPTLINE FOREIGN PIPELNE LIM¡TS OF DISTURBANCE PERMANENT EASEMENT EXIS'TING EASEMENT SECTION LINE PROPERTY LINE q ROAD Q RATLRoAD q DrrcH q STREAM FLOODPLAIN BOUNDARY CONTOUR _ MAJOR CONTOUR _ MINOR VEGETATION ROCK WALL FENCE LINE GUARD RAIL OVERHEAD CABLE TV LINE UNDERGROUND CABLE IV LINE OVERHEAD COMMUNICATION LINE UNDERGROUND COMMUNICATION LINE OVERHEAD ELECTRIC LINE UNDERGROUND ELECTRIC LINE OVERHEAD FIBER OPTIC LINE UNDERGROUND FIBER OPTIC LINE SANITARY SEWER LINI SÍORM DRAIN LINE WATER LINE SILÎ FENCE WATER BAR (PERMANENT) WATER BAR (TEMPORARY) ÏEMPORARY WORKSPACE ADDII]ONAL TEMPORARY WORKSPACE PROPOSED ACCESS ROAD PALUSTRINE EMERGENI WETIAND (PEM) PALUS'IR'NE SCRUB WETTAND (PSS) PALUS]RINE FORESIED WE'TLAND (PFO) KEEP OFF PROPERry ,r q SIGN POWER POLE LIGHT POLE IRANSMISS]ON TOWER TREE -PL- o o @ @ ı o @ a ? SANITARY SEWER MANHOLE STORM DRAIN MANHOLE CONS'IRUCTION NOTES: 1. DATUM BASED ON COLORADO STATE PLANE COORDINATE SYSÏEM, N4L2LZQNE, ÑAVD 88, ELEVATIONS MSL, DERIVED FROM GPS OASFRVATION. 2. EXISTING UTILI]IES ARE SHOWN IN APPROXIMATE LOCATIONS GENERATED FROM PREVIOUS MAPS ÀND SURVEY. CONTRACTOR SHALL VERIFY EXACT LOCATION AND ELEVA'TIOÑ OF ALL EXISIING UTILIIIES IN AREA OF WORK PRIOR TO CONSTRUCÍION AND CALL 811 AND ÀLL O-IHER UTILITY COMPANIES AT LEAST 2 WORKING DAYS (48 HOURS) PRIOR IO CONSTRUCfION. 3. IITLE INFORMAIION PROVIDED BY SUBSIDIARY NAME. L.L,C. tttrtttttttttt WATER METER FIRE HYDRANT GAS METER VALVE WELL BORE LOCAÍON PIPELINE MARKER æ -oñ- - ucw- -oHc- - ucc- -oHE - -UGE - ---l'l+ SADDLE BAG WEIGHTS $ rnrr'rcH BREAKER/DIrcH PLUG PRODUCT TRANSPORTED: NATURAL GAS a I ål + X X + + I * TEST LEAD TEST IEAD (PROFILE) TNLTNE vALVr (PRoF|LE) RELIEF VALVE (PRoFILE) TEE (PROFILE) SÏATION EQUÀTION TRTNC_] SAI-I- TY NOTTS: ALL TRENCH EXCAVAÍION SHALL BE IN ACCORDANCE W¡TH THE U.S. DEPARTMENT OF LABOR OCCUPATIONÀL SAFETY AND HEALTH ADMIN STRATOR'S STANDARDS, CONTRACÍOR IS RESPONSIBLE FOR ALL 'TRENCH SAFETY,-UGFO- -ss- ENVIRONMTNIAI NOTTS: 1. PLEASE REFER TO ENVIRONMENTAL REPORT FOR INFORMATION ON PROJECT SPECIFIC ENVIRONMENTAL CONSTRAIN'IS AND SPECIFICATIONS, GOVERNING AGENCY NAIME NOTES: 1, IT IS THE CONTRACTOR'S OR INSTALLER'S RESPONSIBILIÍY TO CALL THE WILLIAMS PERMIT AGENT AND THE GOVERN¡NG AGENCY NAME'S ¡NSPECTOR 48 HOURS PRIOR 'TO STARTING THE INSTALLA'TION. ALL NAMES AND NUMBERS ARE LOCATED IN -THE GOVERNINC AGENCY NAME,S SPECIFICATIONS. 2. ALL BORES SHALL BE ACCOMPLISHED WTH THE CONVEN-TIONAL DRY AUGER BORE METHOD UNLESS OTHERWS[ APPROVED BY fHE GOVERNINC AGENCY NAME'S INSPECTOR OR ENGINEER. -1,U'.a,atz 3mare re NQfE: NOT ALL IIEMS IN IEGENO APPAR IN DMWINO. ITEMS APPARING IN DMUNC IHAI DO NOf APPAR IN LEGEND SHALL BE CLARLY UBELED. fmrt.ü¡lelon Ga[¡ærup¡us. I I I l l i .'.i ',r1.t'ri I i"r i) ii r j PRELIMINARY D^ïa: O4-0Cr-22 REVISION PICËANCE COTTONWOOD DRIP CIJTOIJÏ GENERAL NOTES SHEET 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO wntffisCvREV NO nFscRtpftoN DAIE BY OAIE úDm WOR(OROER xMxx PIPEUNEIO aqç2 CHEC(EOBY:xü OATE:uÃxffi SHEEI zAF 12 RryIWN 1 0 tssvE0F0RRflril |tuÐ DAIE:MM SfrEEIMME cogREELD4mCodollFR ACCESS ROAD PERMIT SUMMARY LOCÀT|ON INTERSECT¡NG ROAD NAME ACCESS INTERSECTION COORDINATES DESIGN SPEED (MPH) INTERSECTION SIGHT DISTANCE oALC. (Fr.) STOPPING SIGHT DISTANCE CALC. (Fr.) SIGHI DISTANCE MEASURED (FT.) DECtStON POINI DISTANCE FROM EOP (Fr,) COMMENTS LATITUDE LONGITUDE LEFT RIGHT B D NOTES: A = INTERSEcTING SICHT DISIANCE MEÀSURED LEFT B = INTERSECï|NG SIGHT DISTANCE MEASURED RICHÍ C - STOPPING SIGHT DISTANCE MEASURED LEFT D : STOPPING SIGHI DISTANCE MEASURED RIGHT* FOR 'TEMPORARY ACCESS MAINTENANCE OF TRAFFIC ROAD (TAR) PERMII LOCA'TIONS ÍHAT DO NOT MEET MINIMUM SIGHT DISTANCE REOUIREMENÎ FOR SSD. MEETING ODOT OMUÎCO WILL BE PROVIDED DURING PERIODS IAIHEN DRIVE WLL BE USED. UTIIJTY ENCROACHMENT SUMMARY SHEET NO, APPROX. STATION PROPERTY OWNER DESCRIPIION OF UTILITY ÏYPE OF IMPACT PROJECT NAME SPECIÁ.L FEATURE SUMMARY SHEET NO. APPROX. SÎATION OFFSET (Fr.) APPROX. COORDINATES PROPERTY OWNER AVOIDANCE (YEs,/No)DESCRIPfION PROJECT NAME ROADWAY SUMMÄRY LOCATION SHEET NO. APPROX. SÏATION ROAD NAME ROAD DESIGNATION SURFACE lYPE ñPE OF IMPACT NOIES UTILITY FACILITY OPERÁ,TOR LEGEND ÄND CONTÄCT INFORMATION NAME CONIACT INFO NAME CONTACT INFO NAME CONTACT INFO NAME CONTACT INFO NAME CONÍACT INFO NAME CONTACT INFO NAME CONTACT INFO NAME CONTACT INFO NAME CONTACT INFO NAME coNfacf rNFo NAME CONTÀCT INFO NAME CONÍACT INFO NAME CONTACI INFO NAME CONTACT INFO NAME CONTACT INFO NAME CONTACT INFO l(mwwhffibehw, Gallt*lurlng. ir r,ì t|) PRELIMINARY D^r.: 04-06-22 REVISION PICEANCE COTTONWOOD DRIP CUTOUT GENERAL NOTES SHEET 24' NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO wuffisevREV NO DESCRIPÍION DATE BY DAIE.úm WORKOROER xMX PIPEUNEID xMxx.x.x.x 1 ISSUEDFORRilM WD CHECXEDSY:OÁTE:NMM SHEEI 30F12 RWtS0N I 0 ßùn SHÊÉIMME CGdffIELD¡WDCMNOI2IFR ]t..,:.GARFIELD COUNTY I"ANDFILL Id ,l' ÀNVIL POINTS -PL PL-PL PARK DRIP STÀTION I I dËþ'a-E;jı'6 --"--Pt '.a .'l .l - 'J o .*0,--...t :-t,¡i'.'a:_. 3ìúri¡r'i -'iãL ',.'I i N eE FzÞô ..::: '' ::: ..:PUCKET/NOGLE DRIP STATION 36 0 800 1600 =F--GRAPHIC SCALE lN FEET lfiovt whatbbel0w. Gâll ¡erorc you o¡s, PRELIMINARY t::...: O4 A6-2?- REVISION PICEANCE COTTONWOOD DRIP CUÏOUÏ ALIGNMENT INDEX SHEET 24" NATURAL GAS PIPELINE PICEANCE SOUÏH GAÏHERING GARFIELD COUNTY, COLORADO wiiliffi!? REV NO DESCRIPTION DATE 8Y 03D2D2 PIPELINEID ISSUEDFORRryIM aqÈe .HECKED BY XXX DATE SHEEI l ISSUEDFORREVIEW 0t22-¿DAIE SHEEI NAME C@RFIELGCWDCOINOEX]FR CÛUW & STAÏE GARFIELD COUNTY,COLORADO OWNERSHIP TAND USE STAIIONING þ q I PUN {'-' j tr"l t PUCKET/NOGLE DRIP STATION (IO BE REMOVED) t Itt?a.<.6t -ê,å 4¿rejL^ f-'..tår {i :\I J * 1 APPROXIMAIT ':. -¡e*"t ¡'I \ as-autl-r 24.[PIPELINE,'? -'; 3 tc EXCAVATION EXTENTS AI 1.5;1 SIDESLoPES (s2o cY cuT) a,-".:\ l¡T-6-S, R-95-W x.dr't"SECTION ¡ -'ttt H 16,' IEMPORÂRY BYPÀSS PIPING IO 8E FIELD ROUTED AS REQUIRED AND SUPPORTEO Af MÀXIMUM 55' SPÀN TENGÍH, 'l PROFILE 5t75 CMDE 5160 AS-BUILT 24,' N.G. PIPELINE EXCÀVAIION GRAOE AT 1.5r1 S¡DESLoPES EX 30" LIOUID 5t 71 CLASS LoC.X DESIGÑ FACTOF x.xx ANSI RATING XXX HYDR0 (P.S.l.G,)xxx MATERTAL BAR o 153' ø o a1 341' 02O4O¡- SCALE IN FEET lt¡rowüñaßüehr. Gall¡øorsyu¡ob PRELIMINARY DAra:04-06-22 SUMUIARY OF MATERIALS REFERENCE DRAWINGS REVISION PICEANCE COTTONWOOD DRIP CUTOUT PUCKET/NOGLE DRIP CUTOUT ALIGNMENT 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNW, COLORADO wntffis? ITEM NO DESCRIPIION QTY DRAWING NO DRAWING IIÍLE REV NO OESCRIPTION OATE BY ßBUlLr 24.@ o.D. x 0.312'Wt, XÉPS|¿ FBE COÁTIre €4 2 &BUlLr24.m'O.D. x 0.375 WL XruPsU, FBE co^Tlre 01 OAIE:æ@ OROR: ISSUÐ FOR RMil 0&2 CHEC(Ð8Y:K DAE:50F12 lssuÐ EoR Rfltil 012.2 M OÀTE Mru #ISIING CMP MANHOLE & 2" VALVE A DRIP POT 2'' THREAD-O-RING PUCKET/NOGLE DRIP STATION (ro BE REMoVED) UISTING 2" fHREAÐ-O'RING EXISIINê 2" PIPELINE INSTALL STOPPLE AT STATION STOPPLE AT STATION 69+54 EXISTING LIOUIO COLLEC|OR 21' MfuMI US qEINF ENSM 24, MIML &S HPELIW COMBUSTOR 16" TEMPORARY BY_PÁSS TO BE FIELD ROUTED AS REQUIRED ANO SUPPORIED A1 MAXIMUM 35'SPAN LENGTH. oro20 =---tGRAPHIC SCALE IN FÉET PT,AN EXSNNG COMAUS|OR 2,, THREÀD_O_RING EXIS\INC 2" UALVE EXßNNG CUP MNHOLE & 2" UALVE EXISTINC 2" PIPELINE I6" TEMPORARY BY_PASS TO BE FIELD ROUTED ÀS REQUIRED ÀND SUPPORIED AT MAXIMUM 35'SPAN LENGTH. ISOMETRTC VIEV rctr{ew|iarbbelfilu. Gall ¡e¡oruyou¿¡g. PRELIMINARY D^ÎL 04-06-22 DEMOLIÏON AREA REVISION PICEANCE COTTONWOOD DRIP CUTOUT PUCKET/NOGLE FABRICATION ASSEMBLY 24' NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO wmffisevRry NO DESCRIPlION DATE BY DAIE:0w PIPELINEIDI MM-X-X-X SUEOFORRWIil M62 CHECKEDBY:xu 0ÀlE M SHEETI 60F 12 RttsoN ISSUED FORR&IEW &22.2 w 0ÁlE M SHEflMME C@RHELùCWDCOFABl.IFR =: INSTÀLL 2,, ÍHREAD_O_RING FOR STOPPLE OPERATION 24" NATURAL GAS EXISTING EXISTING LIQUID ÇOLLECÍOR SECTION SHEET 6 EXISTING SIIE SPECIFIC stfE sPEctFtc EXtSÌtNô '-5" (FTELD Ftf As INSTALL 2'' THREAD-O-RING FOR STOPPLE OPERAT'ON INSTALL 2" IHREAD-O-RING FOR STOPPLE OPERATION 24" NATURAL GÀS 24" NAIURÀL CAS Ð : EX¡STING EXISIING t SHEET 6 tûþwwhaËbeloW. Gallnøoæyouog. I PRELIMINARY DAtEt 04-06-22 DEMOLITION AREA REVISION PICEANCE COTTONWOOD DRIP CUÏOUT PUCKET/NOGLE FABRICATION ASSEMBLY 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO w¡ttffisCvREl/ NO DESCRIPTION DATE BY uer I oere 03m2 xWX PIPRINEIO.uM-x-x-x ISSUED FOR RMEW W2 CHECKEO BY w I oerr SHET:70t12 RMSON:1 0 ISSOED FORRffEW &2-A APPRoV€D sY. w loere )(M SHEÍ MMEI C@RFELÈCWOCOFAS2IFR 6" IEMPORARY BY-PASS TO BE FIELD ROUIED AS REQUIRED AND SUPPORTED Af MAXIMUM 35'SPAN LENGIH. FIT AS REQ,D 21. MfuML dS PÆM SECTION SHEET 7 (rPrcÂL 2 PUCES) ffiæyoudþ. PRELIM¡NARY D^IE 04-06-22 REVISION PICEANCE COTTONWOOD DRIP CUTOUT PUCKET/NOGLE FABRICATION ASSEMBLY 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO wnffisevREV NO DESCRIPTION DATE BY woM oRDFR uxu IP|PFUNFto w.x-x ¡ MÈ22 soF 12 | FflÉoN ISSUEO FORRflIEW ß22-22 )(Jffi SHEEI MME C@RqELÈCWDCGFAS}IFR COUNTY & STATE GARFIELD COUNTY,COLORADO OWNERSHIP LAND USE STAIIONING q PUN I SHARRARD PARK DRIP STATION (ro BE RrMovro) II I \I aY 1%r t \..ta; -, t \\ I I 50LÀPPROXIMÀTE SPOIL PILE t \\! 00 t 0+oo 311 + 307+00 \ \ AS-8UILI 24'' N.G. PIPELINE \_ \ .i EXCAVÀTION EXTENTS ÀT 1.5:l SIDESLoPES (1,522 CY CUT) \I 16' I T-6-S, R-94-if SECTION 20 \.\*---------.\n. n_--16' TEMPORARY BYPÁSS PIPING TO BE F¡TTD ROUTED ÁS RIOUIRED AND SUPPORTED ÁI MAXIMUM J' sPÁN LENGTH. -w-w -*1\|- w==-_-/w 1 \ w-w-w-w- PROFILE 5400 5t75 51 JI 5 AS_BUILT 24,' N.G. PIPELI EX JO'' LlOUlO ÀT i.5:1 SIDESIoPES : TXCAVAfION CRADI CLASS LOC,X ]ESIGN FACIOR X.XX ANSIMTING HYDR0 (P.S.l.G.)XXX MAIERIAL BAR o (ù o ø o 148 6J,64 25A o2040 - SCALE IN FEET rmrrarsbeþtr, Gall¡øoreyor¡l4 PRELIM¡NARY i.:^I: 04-06 22 SUMMARY OF MATERIALS REFERENCE DRAWINGS REVISION PICEANCE COTTONWOOD DRIP CUTOUT SHARRARD PARK DRIP CUTOUT ALIGN|\ilENT 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNW. COLORADO w¡ttffisCvffÊM No DESCRIPTION QTY DRAW¡NG NO DRAWINGIIfLE REV NO DESCRIPTION DATE 8Y Â9SU1r24.000 0Ð x0312 Wl,x6tPsu FBECoAIING 458 2 ASBU|LÌ24.000 0 0. x 0.375 W.r., xTGPsU, FBE coÂflNc 12î MPH ] DArÊ 8M2 XXAXX PIPELINEIO ISSUED FORRWIM 0qù2 CHEC(ED8Y xu I orrr SBEEI 90F 12 RWtS0N ISSUED FORRNIM 0t22,D ø | o¡re SNEEIMME CO¡ARFIELD,CWDCdAUGN2]ÊF & 2" UALVE EXISNNC SHARRÄRD PARK DRIP STATION (10 BE REMOVED) EXISÍING 2" PIPELINE EXISTINC 2,' THREAD_O_RING INSIALL STOPPLE AT STAT¡ON 309+72 EXISIING 2,, THREAD-o-RING WSWG 24' MfuRAL ø5 21' ffiINSTALL Af stÀÍoN 308+77 I LIQUIO 11 EXISTING 16,, TEMPORARY 8Y-PASS IO BE FIELO ROUIED ÄS REQUIRED AND SUPPORIED ÂI MAXJMUM 35'SPAN LENGIH. 0to20 =F--CRAPHIC SCATE IN FEET PI,AN EXISIING CMP MANHOLE & 2" VALVE EXISTING 4" EXSNNC LIAUID COLLECTOR 16,' TEMPORARY BY_PÂSS TO BE FIELD ROUTED ÂS REQUIRED AND SUPPORTED AT MAXIMUM 35,SPÂN LENGTH. EXISflNG 2" VALVE 2" THREAD_O-RING ISOMETRTC VIEIY rnffirbGlow,Hmcpuca PRELIMINARY DAIET 04-06-22 DEMOL TION AREÁ REVISION PICEANCE COTTONWOOD DRIP CUTOUT SHARRARD PARK FABRICATION ASSEMBLY 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO wnffisCtz REV lio DESCRIPTION DATE BY 0ÂÌE 0w woRKoR0LR uxw I ptpnNLtD nxux-x-x-x ISSUEO FORRWIEW CHECKEOEY XXX DAIE xMw SHET:rooF r2 | RwßoN. ISSUEOFORRryIEW DAÍE ffi SBEÍ MME C@RFEtrWDCOFAB4IFR EXISTING 2" PIPELINE EXIS\INC DRIP IANK 's INSÎALL 2'' THREÄD_O_RING FOR SÍOPPLE OPERÀIION 24" NAIURAL GAS 24" NAIURAL GAS EXISIING LIQUID COLLECTOR SBEÍ t0 EXISIING s[E SPECTFTC s[E SPEC|F|C EXISilNC 24'-1- (FIELD FtT AS REO'D) INSIALL 2" THREAO-O-RING FOR STOPPLÊ OPÊRAÎION NATURAL GAS 24" NATURÄI cAs EXtSilNG SHEfl lo rnffii¡Gþ¡r, Ga[to,trepr¡cg. PRELIMINARY D^18: O4-OO-22 DEMOLìIION AREÁ REVISION PICEANCE COTTONWOOD DRIP CUTOUT SHARRARD PARK FABRICATION ASSEMBLY 24' NAÏURAL GAS PIPÊLINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO Wilfi#àCvREV NO DËSCRIPIION DAÏE 8Y OAIE \xm PIPELINEID ffi.x-x-x ESUEDfORRWIEW cÆ22 CHEC(EO8Y 0ÀtE SHEF:11 0F 12 RWISON:1 0 ISSUED FOR RMEW @n-2 DAIE W SHEEMME:C@RNELDCWDCGFAEIM =: 3 P FIELD AS REO'D I6'' ÎEMPORÁRY BY-PASS 10 BE FIELD ROUIED AS REQUIRED ÂND SUPPORIED AT MAXIMUM 35'SPAN LENGÍH, 20"x16" CONC RED (VERIFY) EXENNE Z. MTUfu ß PPANE SECTION SHEET (rPrcal 2 PucEs) l(rws,har¡bel0w. Gall reilorayou¿lg. ttl ! il il PRELIMINARY D^IE| 04-06-22 REVISION PICEANCE COTTONWOOD DRIP CUTOUT SHARfuqRD PARK FABRICATION ASSEMBLY 24" NATURAL GAS PIPELINE PICEANCE SOUTH GATHERING GARFIELD COUNTY, COLORADO witfiffisCV RW NO DESCRIPTION DATE BY OAIE w ffi PIPELINEIO:UMX-X,X-X WD :HECKED BY:OAIE MM S8Efl:12ôF 17 RWISN:1 0 ISSUEO FOR RflIEW @2-Ð OAIE Xx/M SHEIMME CMRFELùCWDCGFAÊ&IFR