Loading...
HomeMy WebLinkAboutScope of WorkScope Of Work L. What is our grading plan? Excavation to expose piping, once repair work is completed, backfill and compact to original grade. All above grade appurtenances will be removed. Entire site will be restored to original grade and vegetation upon completion. 2. What willthe backfill be like? 1O-L2" lifts, backfillwith excavated material and machine compacted. 3. What drainage plans do we have? Disturbed area anticipated less than 1 acre, no drainage plan is developed other than complying with industry best practices for managing erosion/run-off. 4. Add anything you can that's pertinent and easily added during excavation, if hole becomes filled with water, any dewatering will be into a filter bag with hay bale support.