Loading...
HomeMy WebLinkAboutSubsoil Study 5020 County Road 154 Glenwood Springs, CO 81601 phone: (970) 945-7988 fax: (970) 945-8454 email: kaglenwood@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, and Summit County, Colorado May 10, 2021 Matt and Julie Fadden 2815 W. 115th Drive Westminster, Colorado 80234 matt.fadden@comcast.net julie.fadden@comcast.net Project No. 21-7-305 Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot 9, Roaring Fork Preserve, TBD Willow Lane, Garfield County, Colorado Dear Matt and Julie: As requested, Kumar & Associates, Inc. performed a subsoil study for design of foundations at the subject site. The study was conducted in accordance with our agreement for geotechnical engineering services to Matt and Julie Fadden dated March 25, 2021. The data obtained and our recommendations based on the proposed construction and subsurface conditions encountered are presented in this report. Proposed Construction: The proposed residence will be a single-story wood-frame residence with attached garage. The proposed barn will be a tall single-story structure with a partial loft level. The proposed residence will be located on the site in the area of the pits shown on Figure 1. Ground floor will be structural over crawlspace for the residence and slab-on-grade for the garage and barn. Cut depths are expected to range between about 2 to 4 feet. Foundation loadings for this type of construction are assumed to be relatively light and typical of the proposed type of construction. If building conditions or foundation loadings are significantly different from those described above, we should be notified to re-evaluate the recommendations presented in this report. Site Conditions: The subject site was a vacant pasture at the time of our field exploration. The ground surface is relatively flat with varied gentle slopes. Irrigation ditches are north and southwest of the building area. Vegetation consists grass and weeds with scattered aspen trees along the ditches to the north and east. - 2 - Kumar & Associates, Inc. ® Project No. 21-7-305 Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating two exploratory pits and a profile pit at the approximate locations shown on Figure 1. The logs of the pits are presented on Figure 2. The subsoils encountered, below about 1 foot of topsoil, consist of sandy gravel with cobbles down to the maximum explored depth of 8 feet. Results of a gradation analysis performed on a sample of sandy gravel (minus 5-inch fraction) obtained from Pit 1 at the site are presented on Figure 3. No free water was observed in the pits at the time of excavation and the soils were slightly moist to moist. Perforated PVC pipe was installed in the two pits for long term monitoring of the groundwater level. The nearby profile pit for septic design was logged by Carlo Ostberg of CBO Septic Consulting. Foundation Recommendations: Considering the subsoil conditions encountered in the exploratory pits and the nature of the proposed construction, we recommend spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of 2,500 psf for support of the proposed residence and barn. Footings should be a minimum width of 16 inches for continuous walls and 2 feet for columns. Loose disturbed soils, topsoil and existing fill encountered at the foundation bearing level within the excavation should be removed and the footing bearing level extended down to the undisturbed natural soils. Exterior footings should be provided with adequate cover above their bearing elevations for frost protection. Placement of footings at least 36 inches below the exterior grade is typically used in this area. Continuous foundation walls should be reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 10 feet. Foundation walls acting as retaining structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit weight of at least 45 pcf for the on-site gravel soil as backfill. Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded slab-on-grade construction. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minimum 4-inch layer of free-draining gravel should be placed beneath slabs to facilitate drainage. This material should consist of minus 2-inch aggregate with less than 50% passing the No. 4 sieve and less than 2% passing the No. 200 sieve. - 3 - Kumar & Associates, Inc. ® Project No. 21-7-305 All fill materials for support of floor slabs should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on- site soils devoid of vegetation, topsoil and oversized rock. Underdrain System: It is our understanding the proposed finished floor elevation at the lowest level is at or above the surrounding grade. Therefore, a foundation drain system is not required. If the finished floor elevation of the proposed structure is revised to have a floor level below the surrounding grade, we should be contacted to provide recommendations for an underdrain system. All earth retaining structures should be properly drained. Surface Drainage: The following drainage precautions should be observed during construction and maintained at all times after the residence and barn have been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. Free-draining wall backfill (if any) should be covered with filter fabric and capped with about 2 feet of the on-site, finer graded soils to reduce surface water infiltration. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum slope of 6 inches in the first 10 feet in unpaved areas and a minimum slope of 3 inches in the first 10 feet in pavement and walkway areas. 4) Roof downspouts and drains should discharge well beyond the limits of all backfill. Limitations: This study has been conducted in accordance with generally accepted geotechnical engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory pits excavated at the locations indicated on Figure 1 and to the depths shown on Figure 2, the proposed type of construction, and our experience in the area. Our services do not include determining the presence, prevention or possibility of mold Kumar & Associates Kumar & Associates Kumar & Associates TABLE 1 SUMMARY OF LABORATORY TEST RESULTS Project No. 21-7-305 SAMPLE LOCATION NATURAL MOISTURE CONTENT NATURAL DRY DENSITY GRADATION PERCENT PASSING NO. 200 SIEVE ATTERBERG LIMITS UNCONFINED COMPRESSIVE STRENGTH SOIL TYPE PIT DEPTH GRAVEL SAND LIQUID LIMIT PLASTIC INDEX (%) (%) (ft) (%) (pcf) (%) (%) (psf) 1 6-7 62 33 5 Slightly Silty Sandy Gravel