Loading...
HomeMy WebLinkAboutApplication). @Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 (970) 94s-82L2 www.garfield-cou ntv.com Gar.field County BUILD¡NG PERMIT APPLICATION DemolitionMulti-FamCommercia ReroofResidentialF, DU lex or Townhome or Multi-LevelManufactured Home Dwelli Unit u), MAX|MUM SIZE OF 1,000 SQUARE FEET Mailing Address: Email Address: EmailAddress: Phone Phone: f7 )one:( Architect:OHN6TL p L, Phone: (f'Tt )7 P7, ? 3 ê,3 Mailing Address Engineer: Mailing Address: Email Address: Contractor Property Owner: Mailing Address: EmailAddress: )Phone:Manufactured Home lnstaller: Mailing Address Email Address: qRqr_ECr gETê!_t_s_ Describe Work: rot 5 alock I Property ID f, & Sub (Sq. Ft of Floors Owner's Valuation of Work: Assessor's Parcel Number Job Address: sq. Ft. or Buirding: làffiUPS:følAS Heísht: orAcres): 'Prl( ' "'3 , i S,laßl oaãyL lþfis, Remodel/Alteration Addition{ruewClass of Work: Garage:Attached Detached PROIECT EETA¡[S GONTINUED Septic:Community NOTICE Authority. This application for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby tlre Owner, rnusL be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division' Other permits. Multiple separate permits may be required: (1)State Electrical Permit, (2)County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Perm¡t. Void permit. A Building Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement' CERTIF¡GATION Electric OtherNatural Gas PropaneType of Heat: Permit #Driveway Permit: mpt *:ff.¡þ &[l I hereby certify that I have read this Application and that the information contai ned above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provis¡ons of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permlt does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect d er engineer and/ or builder I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provided the required information which is correct and accurate to the best of my knowledge. Property Owner Print and Date hil;r+h 6-5-2L er,* zq6OFFICIAT USE ONLY t 22 see abbar)ned ØND,TIONSSpecial Condítions; Fees êrManu. Home Fee; N/A-Plan Check Fee: b íqq,bL Permit Fee: ^-l"0u).þsted OWTS No: #?T'-1+t3 Bafance Due: ^1,04b,3',1 Bl¡E -Tl3ZBP No:Total'Fees:7Þ t,-î6ô.6 'Fees Pa'ld:* 7or¡.u Const, Type;l Rû Zoning:ßvpAuU:ont>, OCC Group:tRc BUILDING / PLANNING DIVISION : Signed Approval Date Gørfield County BUILDING DEPARTMENT 7OB Eíghth Street, Suite 407, Glenwood \pr¡nqs, CO 81601 Tel: {970) 945-8212 PLAN REVIE W CHECKLIST Permit No:gtRE-&4^ZZ-V\7Z Building lssues Pla nni ng lToning lssues L Scoy:l.l¿^D + 3ara3e Engineered Foundation Dríveway Permit Surveved Site Plan3àÞf1r??7433 Septíc Permit and Setbacks Grade/ Topography 30% Attach Residential Plan Review List 6,nerl Çron ú,ll &t ¿Ho, E Þ, Subdivision Plat Notes 5_5_LL UNÞ property Line setbacks ¿'- 30 ft. Stream Setbacks Flood Plain Building Height Zoning Sign-Off Grade/ Topography 40% Planning lssues Subdivision Plat Descri otion & Summa rV Road lmpact Fees E,g'D þ t 47tl o e,to"nP'l ,1 ,.- ^tA uttÇín. boeet*= 4t40.* = Q,qbL,@ = 328Ò.æ ¿."' Fire Department Review Valuation Determination/ Fees Red Line Plans/ StamPs/ Sticker Attach Conditions Application Signed Plan Reviewer to Sign APPlication Parcel/schedule No. 40# Snowload Letter - Manu' Homes K+A g-toal soits Report A4_267 P; ortltt" Poi ^l Ft' r, aln AI 6nñb FLs q0+ x74,þ$ = aârtl4S,ø 54o x 4l ve qûr qlo Y a+d,., Ø0x +lADUPmMaÀwntr c*t '¡A*ft**elz*lzz- T;il"o o1,'ì\h"le ad, n 1ØL¡t,Y. AÞU ?.05.1. nuh,rærn I Framing plans for each floor level and roof. All þeams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold untilthe required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued, The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Ce¡lificate of Occupancy (CO) is issued. Using the building without a CO will þe considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. 'ÐÐAL Property Owner P and Sign a a