HomeMy WebLinkAboutPermit
Garfield County Public Health
2014 Blake Ave.
Glenwood Springs, CO 81601
Phone: (970) 945-6614 ext. 8150
For inspections, call: 970-945-6614 ext. 8150 and call the Design Engineer, if applicable
Project Address: 3062 County Road 113, Carbondale, CO 81623 Parcel No.: _239310301001
Owner Name: Rob and Kim Valesquez Owner Phone: (970) 618-6375
Designer: CBO Septic Consulting Designer Phone: (970) 255-8005
OWTS PERMIT
KEEP AVAILABLE AT PROJECT SITE
Permit Number _SEPT-7407_______________________________
Permit Type X New X Repair X Remodel/addition X Tank only
Issue Date _05/06/2022____________________ Expiration Date_05/06/2023_________________
Permit Conditions:
This OWTS Permit is approved on the condition of compliance with the recommendations in the
letter as submitted by CBO Septic Consulting (CBO) dated April 14, 2022.
A new garage with office space and a bathroom above will be constructed and utilize the existing
OWTS on the parcel. A new sewer line from the detached garage will connect to the existing, 1,000-
gallon septic tank on the property. Cleanouts shall be installed adjacent to the new garage and every
100 feet along the new sewer line.
Contact the designer and Garfield County Public Health at least 48 hours prior to requesting final
inspection of the installed system prior to backfill.
Agreement
All installations must comply with all requirements of the Garfield County OWTS regulations
including but not limited to the conditions specified above.
In consideration of the issuance of the permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location, construction, and erection of the proposed
OWTS and associated structures for which this permit is granted. The applicant further agrees
that if the above said regulations are not fully complied with in the zoning, location, erection,
and construction of the above described OWTS and structure, the permit may then be revoked
by notice from the Health Department and immediately become null and void.
The issuance of a permit and specifications of terms and conditions therein will not constitute
assumption of liability, nor create presumption that the local public health agency or its
employees may be liable for the failure or malfunctioning of any system. Permit issuance will
not constitute a certification that the system, the equipment used in the system, or any
component used for system operation will ensure continuous compliance with the provision of
the OWTS Act, the regulations adopted thereunder, or any terms and conditions of a permit.
Permit Approval
Plans and specifications for the proposed OWTS have been reviewed and are considered
satisfactory. Permission is hereby given to the property owner(s) to perform the work indicated
in accordance with the Garfield County OWTS Regulation. This Permit will expire 1 year from
the date of issuance unless construction on the system has commenced. An "as-built" drawing
must be submitted and inspection of the system must be completed by GCPH before final
approval of the system will be issued.
05/06/2022
Issued By: Garfield County Environmental Health
Department
Date