1. TO ENCOURAGE THE HEALTH AND LONGEVITY OF THE OWFS SYSTEM, THE OWNER SHALL CONSIDER THE FOLLOWING: Z o % o°O� `��O° /�`^°yob �// // / /��� �j / o��/ / / / y/� ° J / i / f f % I-✓
I.A. MINIMIZE THE AMOUNT OF WATER THAT GOES DOWN THE DRAIN, THE BETTER YOUR SYSTEM WILL WORK.
1.8. MINIMIZE SOLIDS GOING DOWN THE DRAIN.
T.C. ELIMINATE GARBAGE DISPOSALS OR KEEP THE USE OF GARBAGE DISPOSALS TO AMINIMUM.-TRENC9OVAFLOW / INSPECTION PORT AT �pk �GQ / / 0 1°°
1.D. MINIMIZE GREASE AND OILS THAT GO DOWN THE DRAIN. LATERALS (THIS END ONL / TEACH ENDO EACH
1ATERAL, TYP.
LE. USE LINT FILTERS ON LAUNDRY MACHINE DRAINS.
1.F. KEEP SAND AND DIRT OUT OF THE BUILDING DRAIN.
///
1.G. AVOID FLUSHING SANITARY NAPKINS OR PAPER PRODUCTS OTHER THAN TOILET PAPER. // f f / / I /-" -_T \ \� r
1.1-1. DO NOT USE LYE -BASED DRAIN UNCLOGGER CHEMICALS SUCH AS DRAINO, OVEN -OFF, OR OTHER STRONG
CLEANING AGENTS. 7 // / / 1 j UI TEST PIT ! J x x )
1.1. DO NOT PUT ANY "ROOT DETERRENTS" DOWN THE DRAIN. ,-OC/yTION$ / - i�-
1.J. DO NOT POUR PAINT THINNER, PESTICIDES, PAINTS OR PHOTO LAB CHEMICALS DOWN THE DRAIN �' J1 ` j t ij ( C `
1.K. MINIMIZE USE OF CHLORINE BLEACH AND TOILET ADDITIVES.
t / // J/ j /�� I I 1 \ Bar//►► # ) / �- 1 I I
2. THE OWNER SHALL CONTRACT WITH A SEPTIC TANK INSPECTOR TO INSPECT THE TANK ANNUALLY FOR GREASE AND
SEDIMENT ACCUMULATION. THE INSPECTOR SHALL REMOVED AND PROPERLY DISPOSED OF ACCUMULATED GREASE
AND SEDIMENT AS NEEDED TO ENSUREPROPER FUNCTION OF THE SYSTEM.
r 1 1 I I 1 i t A► 1 1' f `! r / a T hw z I GRA1 DIS IBUTION
BOX (USE 3 ZONES)
KUMAR
1 1 TES4
N CDPH1PI)VED PIT LQCATIONS
2050 -GALLON PRECAST TWO (2)`CHAMBER TANK (SEE DETAIL)
)\WELL
///
/
i
c
i I I o
INSTALL 4"0 SCHAAC SEWER LINE @ 2%
MIN., TYP, FITTINGS(NOTEES)
USE LARGE RADIUS 45* BENDS AND WYE
INSTALL TWO-WAY CLEANOUTS AT THE BUILDING'' 1 { J
\ \\\\\\\\\\\y\ \ \ \ \ \ a s FO(INDA�ONS AND EVERY \O LI
\ \\\\\\\\\\ \\\\\\\\\\ \\\ 1 \ \ I 1 Barnss
\\\
�1 1 Si
NSTAL 4"0 CH.40 PVC
SEWER LINE @ 2% MIN., TYP.
1\SE 45-
UAND WYE FI�TTIN S (NO TEEDS)
INSTALLTWO-,W UeSt ` `
AT THE BUILDING FOUNDATIONS \ \ \ \ \ \ N \ \ \ \\ t
111 L 1 \
�ing\ `�D E�ERY,100 MAX.\MAX. \ obi Guest
Cai
-- _
\ \\ W } ( Future 1 \ \ \ \ \
Pon
SITE EVALUATION SOIL EVALUATION
i. SITE AND SOIL EVALUATIONS WERE PERFORMED BY: i. SOIL WAS CLASSIFIED BY THE GEOTECHNICAL ENGINEER
DERIC J. WALTER, PE DANIEL E. HARDIN, PE AS USDA SANDY LOAM, LOAM, SILT LOAM TYPE 2A AND AN
BOUNDARIES UNLIMITED INC. KUMAR &ASSOCIATES, INC. LTAR OF 0.50 GPD/SF AND CONFIRMED TO BE SIMILAR BY
923 COOPER AVE., STE.201 5020 C.R.#154 BOUNDARIES UNLIMITED INC. WITH ADDITIONAL TEST PITS
GLENWOOD SPRINGS, CO 81601 GLENWOOD SPRINGS, CO 81601 120'& 340' WEST (DOWNHILL) OF THE KUMAR TEST PITS.
970.945.5252 970.945.7988
2. THE NATIVE SOILS MAY CONTAIN BOULDERS. IF
2. EVALUATION DATE(S): JUNE 2021 AND MARCH 2022. ENCOUNTERED, REMOVED THE BOULDER AND BACKFILL
THE VOID WITH LOAMY SAND OR SANDY GRAVELS.
3. SETBACK REQUIREMENTS FOR A TREATMENT LEVEL 1 STA TRENCH/BED, UNLINED
SAND FILTER OR SEEPAGE PIT (PER TABLE 7-1) AND AN ADWF=1215 GPD:
3.A, SPRING, WELL OR POTABLE CISTERN=118'
3.B. POTABLE WATER SUPPLY LINE=43'
3.C. STRUCTURE W/ BASEMENT/CRAWL SPACE=20'
3.D. STRUCTURE W/O BASEMENT/CRAWL SPACE=10'
3.E. PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F. INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=25'
3.G. LAKE, POND, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=68'
3.H. DRY GULCH, CUT BANK OR FILL AREA=25'
3.1. SEPTIC TANK=5'
3.J. RESTRICTIVE LAYER OR GROUNDWATER (VERTICAL): 4' (TREATMENT LEVEL 1,
GRAVITY FEED)
3. SETBACK REQUIREMENTS FOR THE SEPTIC TANK SHALL BE (PER TABLE 7-1):
3.A. SPRING, WELL OR POTABLE CISTERN =50'
3.B. POTABLE WATER SUPPLY LINE=10'
3.C. STRUCTURE W/ BASEMENT/CRAWL SPACE= 5'
3.D. STRUCTURE W/O BASEMENT/CRAWL SPACE=5
3.E. PROPERTY LINE, PIPE OR LINED IRRIGATION DITCH=10'
3.F. INTERMITTENT IRRIGATION LATERAL, INFILTRATION STRUCTURE=10'
3.G. LAKE, POND, WATER COURSE, IRRIGATION DITCH, STREAM OR WETLAND=50'
3.H. DRY GULCH, CUT BANK OR FILL AREA=10'
3.1. STA TRENCH/BED, UNLINED SAND FILTER OR SEEPAGE PIT=5'
ATTACH REMOVABLE CAP OR
THREADED CLEANOUT ASSEMBLY.
INSTALL MARKER IF CAP IS TO
BE BURIED.
4'0 PVC TWO-WAY
CLEANOUT TEE
FINISH GRADE
4"0 FVC RISER
� 4"0 SEWER UNE
Two- Way Cleanout
Scale: N.T.S.
12"-18'
SURFACE
\ \ PSI \ \ \
0
SILT LO
v
Site & Soils Evaluation
GENERAL ABSORPTION AREA NOTES
1. INSTALL CHAMBER UNITS IN ACCORDANCE WTH
MANUFACTURER'S RECOMMENDATIONS.
2. ABSORPTION TRENCHES SHALL BE 3WIDE OR LESS
AND PARALLEL THE GROUND SURFACE CONTOURS.
PARALLELING TRENCHES SHALL BE SEPARATED BY
A DISTANCE OF 6' MIN.
3. THE BOTTOM OF THE ABSORPTION TRENCHES
SHALL BE LEVEL AND THE BOTTOM AND
SIDEWALLS MUST BE RAKED TO REMOVE ANYSOIL
SMEARS INCURRED DURING THE EXCAVATION
FAILURE TO DO SO MAY REQUIRE THE CONTRACTOR
TO REPLACE THE ABSORPTION FIELD AT HIS/PER
OWN EXPENSE.
4. DRAINAGE SWALES ARE TO BE PROVIDED ABOVE
AND AROUND THE FIELD, AS NECESSARY, TO
PREVENT SURFACE RUNOFF FROM ENTERING
ABSORPTION AREA.
5. NO EXCAVATION OF THE ABSORPTION FIELD IS TO
BE DONE DURING WET WEATHER AND USE OF
RUBBER TIRE VEHICLES OVER THE ABSORPTION
AREA IS STRICTLY PROHIBITED.
6. UNSUITABLE MATERIAL EXISTING WITHIN THE FIELD
SHALL BE EXCAVATED AND BACKFILL SHALL
CONSIST OF IMPORTED LOAMY SAND OR SANDY
GRAVEL. THE ENGINEER SHALL BE CONTACTED IF
BEDROCK OR GROUNDWATER IS ENCOUNTERED IN
THE OVER -EXCAVATION.
7. TOPSOIL COVER MAY BE VARIED (1 -FOOT MINIMUM,
2 -FOOT MAXIMUM) TO ALLOW FOR LANDSCAPING.
12" MIN. COVER
24' MAX. COVER
/ \ \ INFLOW AND OVERFLOW FINISHED GROUND - MAINTAIN POSITIVE
PIPES SHALL ENTER THE SLOPE AWAY FROM TOP SURFACE OF
UPPER KNOCKOUTS THE CHAMBER TRENCHES.
/\ C CIRCULAR IRRIGATION -STYLE VALVE
BOX & COVER - LID COLOR PURPLE OR
GRAVELLESS CHAMBER SYSTEM GREEN - LABEL "SEWER"
INFILTRATOR QUICK 4, ADVANCED DRAINAGE /
SYSTEMS BIODIFFUSER(STANDARD) OR
ENGINEER APPROVED EQUAL
BOTTOM TO BE LEVEL AND FLAT OVERS 36" MAX.
ENTIRE AREA TO WITHIN 0.05'±. (TYP.)
IF NECESSARY TO ACHIEVE THIS \� j
SURFACE, IMPORT CONCRETE SAND TO\\�
USE AS LEVELING MATERIAL. 4°0 SCH. 40 OR SDR35�
REMOVE ANY ENCOUNTERED PVC OVERFLOW PIPE
BOULDERS AND BACKFILL WITH LOAMY
SAND OR SANDY GRAVELS. DO NOT 6' (MIN.) -
USE COMPACTED MATERIALS.
SERIAL TRENCH SYSTEM
Typical Chamber Serial Trench System
Scale: N.T.S.
STANDARD INSPECTION PORT, TYP.
(4"0 PVC SOLID PIPE CUT TO FIT.
LOCATE PER PLAN VIEW. ATTACH
REMOVABLE CAP OR THREADED
CLEANOUT ASSEMBLY.
COUPLING FOR SUPPORT
SYSTEM DESIGN & CONSTRUCTION NOTES:
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CDPHE REGULATION 43 ONSITE WASTEWATER TREATMENT SYSTEM OVJTS REGULATION MOST CURRENT
EDITION AND LOCAL AGENCY REQUIREMENTS WHICH MAY OR MAY NOT SPECIFICALLY BE NOTED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
KNOWING AND CONFORMING TO SUCH SPECIFIC DETAILS AS ARE REFERRED TO IN THE ABOVE MENTIONED REGULATIONS, THIS DRAWING DOES NOT CONSTITUTE AN
DINTS PERMIT. A PERMIT MUST BE OBTAINED FROM APPROPRIATE LOCAL AGENCY. THE CONTRACTOR MUST CONTACT THE LOCAL AGENCY HEALTH DEPARTMENT
AND THE PROJECT ENGINEER FOR INSPECTIONS OF THE CONSTRUCTED SYSTEM BEFORE BACKFILL. A REQUEST FOR INSPECTION BY THE PROJECT ENGINEER MUST
BE MADE AT LEAST 48 HOURS PRIOR TO THE EXPECTED TIME OF BACKFILLING.
2. DEMAND CALCULATIONS (SEC.43.6.A.2.h)
2.A. FOUR (4) BEDROOM RESIDENCE, TWO (2) ONE (1) BEDROOM GUEST CABINS, AND TWO (2) BARNS W/ TOILET/SINKMUNDRY USING TREATMENT LEVEL 1 (TL1).
2.13 AVERAGE DAILY WASTEWATER FLOW (ADWF) AND ORGANIC LOAD RATE (BODS):
2.B.1. SINGLE FAMILY DWELLING: 75 gpdc & 0.20 BOD5 lbs/day
2.6.2 GUEST CABIN: 75 gpdc & 020 BOD5lbs/day
2.8.3. BARN: 45 gpd & 0.07 8005 lbs/day (TOILET/HAND SINK/MOP SINK & LAUNDRY USES PER PITKIN COUNTY OWTS REGULATIONS)
2.B.4 ADWF: 75 gpd * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSON) = 525 gpd
75 gpd * (2 GUEST CABINS * 2 BEDROOMS * 2 PERSONS/CABIN) = 600 gpd
45 gpd * 2 BARNS = 90 gdp
TOTAL = 1215 gpd
2.13.5 BOD5: 0.20lbs/day * (3 BEDROOMS * 2 PERSONS/BEDROOM + 1 BEDROOM * 1 PERSON)=1.40lbs/day
0.20 lbs/day * (2 GUEST CABINS * 2 BEDROOMS * 2 PERSONS/CABIN) = 1.60lbs/day
0.07lbs/day * 2 BARNS = 0.14lbs/day
TOTAL = 3.14lbs/day
BODS mg/L = 8005*1,000,000 = 3.14lbs/day*1,000,000 = 310 mg/L
ADWF*8.34 1215 gpd*8.34
2.86 CBOD5 = BODS * 0.85 = 264 mg/L
3. SEPTIC TANKS (SEC.43 9 6.2.a):
3.A. 48 HOURS MINIMUM DETENTION TIME: 48 hours/ 24 hours per day* 1215 gpd = 2430 gallons. USE A 2500 -GALLON STANDARD STORAGE TWO-COMPARTMENT
SEPTIC TANK WITH AN EFFLUENT FILTER,
3.B. THE TANK IS NOT SUBJECT TO BUOYANCY.
4. ABSORPTION AREA CALCULATIONS:
4.A. THE ABSORPTION AREA SLOPES GENTLY. SOILS WERE STUDIED BY KUMAR & ASSOCIATES, INC. (PROJECT NO. 21-7-392, JUNE 7, 2021) WITH A LONG TERM
ACCEPTANCE RATE (LTAR) FOR TREATMENT LEVEL 1 (TL1) OF 0.50 gpd/SF (SEE SITE & SOILS EVALUATION NOTES/DETAIL).
4,B. MINIMUM SOIL TREATMENT AREA, A:
A= ADWF = 1215 = 2430 S.F.
LTAR 0.50gpd/S.F.
4.0. SIZE ADJUSTMENT FACTORS: GRAVITY TRENCH = 1.0; CHAMBER TRENCH = 0.70 (TABLE 10-1 A).
4.C.1. A,adj = 2430 SF * 1.0 * 0.7 =1701 SF
4.D. GRAVELLESS CHAMBER TRENCH SYSTEM:
4.D.1. INFILTRATOR OUICK4:1701 SF / 12 SF/UNIT = 142 UNITS IN A TRENCH CONFIGURATION (USE 144 IN A 6 x 24 UNIT TRENCH CONFIGURATION).
4.D.2. ADS ARC 36:1701 SF / 15 SFNNIT = 114 UNITS IN A TRENCH CONFIGURATION (USE 114 IN 6 x 19 UNIT TRENCH CONFIGURATION). -
5. THIS SYSTEM IS SIZED FOR TYPICAL DOMESTIC WASTES ONLY. BACKWASH OR FLUSHING FLOWS FOR REVERSE OSMOSIS UNITS OR WATER SOFTENERS AND/OR
FILTERS SHOULD NOT BE INTRODUCED INTO THIS SYSTEM.
6. TWO-WAY CLEAN OUTS ARE REQUIRED JUST OUTSIDE THE BUILDING FOUNDATION(S) AND AT ALL BENDS AND AT LEAST EVERY 100 -FEET BETWEEN THE BUILDING(S)
AND THE SEPTIC TANK(S).
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALL WATER TIGHT COMPONENTS THROUGHOUT THE SYSTEM TO PREVENT INFILTRATION.
8. INSTALL RISERS AS NECESSARY TO BRING ALL ACCESS PORTS TO FINAL GRADE. PORTS SHALL BE MARKED IF CAPS ARE TO BE BURIED.
9. INSTALL 3 -INCHES OF BLUEBOARD INSULATION, 3 -FEET WIDE, OVER SEWER AND EFFLUENT PIPE WHEREVER DEPTH IS LESS THAN 5 -FEET. UNDER NO
CIRCUMSTANCES SHALL COVER BE LESS THAN 2 -FEET.
10. SITE PLAN INFORMATION FROM OTHERS. LOCATIONS OF ALL COMPONENTS MAY BE VARIED AS NECESSARY AS LONG AS ALL MINIMUM DISTANCES AND SLOPES
MEET THOSE REQUIRED.
Item a 2500 Gallon Top Seam - 2CP
250®T-2CP
DESIGN NOTES
• Design per performance test per
ASTM C1227
• Top surface area 108.88 ft'
• fe ® 28 days; concrete = 6,000
PSI Min.
Installation:
• Tank to be set an 5" min. sand bed
or pea gravel
• Tank to be backfilled uniformly on all
sides in lifts less than 24" and
mechanically compacted
• Excavated material may be used for
backfill, provided large stones are
removed
• Excavation should be dewatered and
tank filled with water prior to being
put in smite for installation with
water table less than 2' below grade
• Meets C1644-06 for resilient
connectors
• Inlet and Outlet identified above pipe
• Delivered complete with internal
• TRUCK MUST BACK UP
PERPENDICULAR TO LONG SIDE OF
HOLE, LID IS A SECOND SET
(NO EXCEPTIONS)
• 4' Maximum bury depth
ALLOWABLE BURY
(Based on Water Table)
WATER TABLE
ALLOWABLE
EARTH FILL
0'-0'
2'- 0'
i'-0'
S-0"
2'-0'
3'-0'
3'- 0'4'-
lY
DRY
40'
0'
- - - - ___201" -
PVC
�ZO• Cbar Aedes
CCK
NOTE: Top AN
HIGH DENSITY POLYETHYLENE
TANKS BY NORWESCO, INC.
ARE AN ACCEPTABLE
ALTERNATIVE TO CONCRETE.
RWIs 10 Olads
1
4" PVC TEE/RISER-- View
EFFLUENT
SecillonFILTER ON THE
TANK OUTLET
Digging Specs
Inve-t Dimensions
Net Capacity Net Wei,,
19' Long x 8' Wide
Inlet Outlet Length
Width
Height
Inlet Sid
Outlet
I Total Lid
I Tank
18200 II
56" 1 53' 201"
78"
68'
1583 gal
1053 gal
2636 gal 6420 lbs
O VALLEY
L] PRECAST, Inc.
Buena Vista, Colorado
ht
Total
.s 24620 lbs
Phone: 719395'$764
Fax: 719395-3727
Website: wwwmalleyprecastmm
ENnall: frontdesk@valleyprecastmm
ve., Ste. 201
[tF1ej3nwC=4ngs,CO 81601
970.945.5252
www.bu-inc.com
Subsurface Utility Engineering (SUE)
Required Project: NO
If "Yes",
SUE Certification by:
Firm: NIA
Job #:N/A
Date: N/A
Engineer or Surveyor Seal
CIF
p�p,DO
V;a 4!29/22 Fy:a
37110
CC
Fss/ONAI.E��\
Client Information:
Edgar Cuc
1853 County Road 109
GLENWOOD SPRINGS. CO 81601
970.456.6483
NORTH
0
50' 100'
Scale: l" = 50'
u
Know what's below.
Call before you dig.
N
M
Cz
N O
1
M
o
�h COD
V
� �
C
_ _
Q
Icz
N c
® f1!
S
a1
CZo'Iw
Inc
CIO
0
V
0)
co
m
0
m
0
rd
•d
h.:
OC
O!
PROJECT NO.
Sheet
22022
Designer:
Drafter.
DJWC.1
Daw
Date:
4/29122
-I! ii