Loading...
HomeMy WebLinkAboutCorrespondence Regarding Updated Plan DocsColleen W¡rth From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Sam lrmen Wednesday, May 18, 2022 2:05 PM Colleen Wirlh Matt Provost; John Hendricks RE: fExternal] following up on blueprints foryour pole barn Follow up Flagged Thank you Colleen. I placed them rolled up on your desk next to the originals. Thanks, Sam lrmen G*r.field County Permit Technician Com munity Development Department n arfield-cou Direct 97A-945-1377 Ext. L625 T:97A-945-8212 | F: 970-384-3470 108 8th St, Suite 401 | Glenwood Springs, CO 81601 From : Col leen Wi rth <cwirth @ga rfiel d-cou nty.com > Sent: Wednesday, May 1"8, 20222:03 PM To: Sam lrmen <sirmen@garfíeld-cou nty.com> Cc: Matt Provost <mprovost@garfield-county.com>; John Hendrícks <jhendricks@garfield-county.com> Subject: FW: lExternal] followíng up on blueprints for your pole barn Courtesy FYl... lnternal team communication RE: the Hampton Barn design corrections. John H. was spot on in his presumption the precast columns could not be locally sourced. Sam - Please put whatever Justín has dropped off on my drafting table or chaír -- l'll roll it into other project reviews on Friday morning. Colleen Wirth Plans Examiner Garfield County Building Division L08 8th Street, Suite 40L Glenwood Springs, CO 8160L cwi rth @sarfíeld-cou ntv.com office (970) 945-L377 ext. L6L0 From: Justín Hampton <iustinhampton2l@ > Sent: Wednesday, May 1-8, 2022 L:54 PM To: Col I een Wi rth <cwirth @earfield-countv. com > Subject: Re: [External] following up on blueprints for your pole barn I tried to source those perma columns and only ones I could fínd were in lllinois! And they wanted almost 52000 to ship them here! So I got the guys from keystone barns to figure it out! They sent me over some new plans and I just dropped them off wíth Sam over at the office! Also fixed other concern too! Thank you so much for the help and catching the perma column thing now instead of later! You guys have been greatl Sent from my iPhone On May 18,2022, at 8:1L AM, Justin Hampton <iust¡nhampton2l@ > wrote: Yeah I get it! I got ahold of the keystone barn company and they are gonna change it on the plans to a wet set bracket and get it to me today! Thank you for all the help Sent from my iPhone On May 18,2022, at 7:53 AM, Colleen Wirth <cwirth@sarfield-countv.com> wrote: Talk with a structural engineer who has a license in State of Colorado to provide a detail for you. l'm sorry l'm unable to provide design or assembly details for this build. Colleen Wirth Plans Examiner Garfield County Building Division l-08 8th Street, Suite 401 Glenwood Springs, CO 81601 cwirth @sa rfield-cou ntv.com office (970) 945-1377 ext. L6L0 From: J ustin Ham pton <iu stinham pton2 1 @vahoo. com > Sent: Tuesday, May t7, 2A22 7 :32 PM To: Colleen W¡rth <çwirth@sarfield-cou > Subject: Re: [External] following up on blueprints for your pole barn Ok I can can take that wordíng out! I think they wrote that ín there because they saíd I had to locally source my wood due to them being so far away! Also yeah we are having trouble sourcing them too! What do I need to do to get a wet set bracket approved! Holes are gonna be 24" around and 36" deep filled all the way up with concrete with wet set brackets installed! Does that have to be engineered? Sent from my iPhone On May 17,2022, at 5:35 PM, Colleen Wirth <cwirth@qarfíeld- counW.com> wrote: 2 BLRE-O4-22-7460 - follow up on concerns with building inspectors Hello Justin, Sorry for the delay completing the structural review on your private use pole barn. Your email from May L1-,2022 was very helpful in clarifying the building intended uses and level of peripheral work ínstalled inside. I have no remainíng use or zoning compliance questions, thanks. As Sam lrmen, Permit Technician, may have mentioned to you via phone today -- I was meeting with our building inspectors, Matt and John, to discuss some of the foundation details on you r plan drawings. There are a few notes on the blueprints which are causing concern for us to sign off on as submitted. 1.. Sheet 4.3 states: "This is sn architectural plan, not construction plan. Builder shall be fully responsible to review plons ond to properly construct the building. Pleose do not rely on this plan for 700% occurocy since this plan is not intended to be a construction plon". We ask for that text to be removed from sheet A.3, or to resubmít AMENDED sheet A.3 expressing plans are intended for construction. 2. When plans examiner and two inspectors revíews sheets A.l- and 4.2 - we found some of the footing foundatíon details a líttle vague. Please confirm if you are planning to install the 70,A00 psi precost concrete column detoil 6/ A.2 ? Or will you be proceeding with alternate site constructed big foots pursuont to the foundatíon chopter 4, of the 2075 International Residential Code. As none of the foundotion plans ore wet stamped by a Colorodo licensed professionol engineer, we o considering the detoils with caution. None of Garfield County building staff have found another iob site instonce in our region where o builder has been able to locally source an 70,000 psi precøst concrete column, so we ore asking if that will continue to be the plonned detoil during your construction? ln event, you ore proposing mínor foundation and/or framing chonges to the pole born, we would like to see those prior to releasing the buílding permít for issuance. That way we can avoid confusion and surprise for everyone during construction. Colleen Wirth Plans Examiner Garfield County Building Division 108 8th Street, Suite 401 Glenwood Springs, CO 81601 cwi rth @ ga rf i el d-cou ntv. com office (970) 945-1377 ext. 161-0 3 Colleen W¡rth From: Sent: To: Subject: Colleen Wirth Tuesday, May 17,2022 5:35 PM Justin Hampton following up on blueprints foryour pole barn BLRE-o4-22-7460 -follow up on concerns w¡th building inspectors Hello Justin, Sorry for the delay completing the structural revíew on your private use pole barn. Your email from May |L,2022 was very helpful in clarifying the buildíng intended uses and level of peripheral work installed inside. I have no remainíng use or zoníng compliance questions, thanks' As Sam lrmen, Permit Technician, may have mentioned to you via phone today -- I was meeting with our building inspectors, Matt and John, to discuss some of the foundatíon details on your plan drawings. There are a few notes on the blueprints which are causing concern for us to sign off on as submitted' L. Sheet 4.3 states: "Thís is an architectural plan, not constructíon plon. Buílder shall be fully responsible to review plons ond to properly construct the building. Please do not rely on this plan for 100% dccurocy since this plan is not intended to be o construction plon". We ask for that text to be removed from sheet A.3, or to resubmit AMENDED sheet A.3 expressing plans are intended for construction, 2. When plans examiner and two inspectors reviews sheets A.L and 4.2 - we found some of the footing foundation details a little vague. Please conJirm if you are plonning to ínstoll the 70,000 psi precøst concrete column detait 6/ A.2 ? Or witl you be proceeding with alternote site constructed big foots pursuant to the foundotion chapter 4, of the 2075 tnternational Residential Code. As none of the foundation plans are wet stamped by o Colorado licensed professional engineer, we a consideríng the details with caution. None of Garfietd County buildíng staff have found onother job site instance in our region where a builder hos been able to locally source øn 70,A00 psi precøst concrete column, so we are askíng íf thot wíll continue to be the planned detail during your construction? ln evenl you are proposing minor foundation and/or froming changes to the pole barn, we would like to see those prior to releasing the building permit for issuance. That wãy we can avoid confusíon and surprise for everyone during constructíon. Colleen Wirth Plans Examiner Garfield County Building Divísion 108 8'h Street, Suite 401 Glenwood Springs, CO 81601 cwirth @earf ield-cgu ntv.com office (970) 945-t377 ext. 1610 1