HomeMy WebLinkAboutDRC Approval LetterPR(- Appravo\ L¿tter
Su nday, ì,llay 22, 2m2 * 1924t249 Mou nta¡ n Dayllght Tl me
Sublect: RE: 295 Silver Mountain Drlve -Flnal DRB Submittal
Date: Wednesday, May 11, 2O22al3:22:58 PM Mountain DaylightÏme
From: Doretta Reuss
To: Patrick Westfeldt
CC: 'Megan Westfeldt'
Attachments: image006.png, image007.png, imageO08,png, imageOO9jpg, imageOl0ipg, imageOll.png
Hl Patrlckl
This has been approved, for lot 114, thanks!REGEIVED
Doretta Reuss
Prcperty Management Assistant
Doretta. reuss@integ ratedmtn.com
970.945.7653 ext 213
www. integratedmountainmanagement. com
INTEG EI'
HOUNTAIN MANAGEFENT
MAY ? 3 ?f;??
GARFIELD COUN"TY
COMMUNITY DEVELOPIIIENT
From; Patrick Westfeldt <patrick@fandmarchitects.com>
Sent: Saturday, April 30,2022 8:56 PM
To: Doretta Reuss <doreüa.reuss@integratedmtn.com>
Cc:'M egan We#eldt' <megurestfeldt@ gmail.com>
Subfecü Re: 295 Silver Mountain Drive -Final DRB Submittal
HlDoretta,
See attached revlsion to our Final DRB submittal. Sheet 41.2 - Landscape plan addressing the following
comments.
o 3.1Slte Planning - Util¡ty meters locations are shown on the site plan, screen meters with landscaping from
view of adjacent lot. {Please Provlde.f {Frovld*d huffalqr luníper shrub sereening from vieq¡ of adjacent leit}
3.7 Landscape Plans - Sopris Phase lllZone Distrlct requires 50 (1gall perennials/grass in front and 50 (1gall
perennials/grass side and rear. The plan shows only 50 totâ|. {Please Provlde and additional 5(t (1Call
perennlals/grass.l
{Provided 50 tl eal} perennials to landscape plan}
Thank you for your help,
PATRICK "PACKY' WESTFELDT
Prcject Manager I F&M ARCHITË0TS
0:970987 2lO7 I C: 970 309 5Zt9
From : Doretta Re uss <do retta. re uss @integrated mt n. co m>
Date: ThutsdaV April2L,2022 at 2:30 PM
To: Patrick Westfeldt <@
C.r:'Mega n Westfeldt' <¡¡ggwestfe ldt @-g ma il. co m >
Sublect: RE:295 Silver Mountain Drive -Final DRB Submittal
Youre welcomel This is not final approvaljust yet....submit whats missing below....its not much looks to me
like the site planning and landscape addltlons is all....so really closel And then yes an emailwill suffrce for
approval....soon !
Doretta Reuss
Property Management Assistant
Doretta. reuss@integratedmtn. com
970.945.7653 ext 213
r¡ gw.integratedmountainmanagement.com
-,---
INTEGR.ATEI}
MOUNTAIN HANAGEIIENT
Frcm: Patrick Westfeldt <@
Sent: Thursday, Aprll 2L,2022 2:18 PM
To: Doretta Reuss <dgrcSaJeuss@jnllegratedmtn.com>
Cc:'Megan Westfeldt' <negwestfeldt@-gmail.com>
Subject: Re: 295 Silver Mountain Drive -Final DRB Submittal
Thank you Dorettal And the DRB.
Just to clarlfu, is this email considered final approval? Or, shall I resubmit the Landscape Plan addressing the
screening and additional perennials/gr¡¡sses conditions to receive a final approval letter to submit with our
building perm¡t for Garfield county?
Best,
PATRICK'PAÇKY' WESTFELDT
Proj€ct Månagor I F&M AHÕHITECTS
0:970987 Ë7O7 I C: 970 309 5779
From : Doretta Re uss <doretta. re u ss fô i nte grate d mt n. co m>
Date: Thursday, April 2L,2O22 at 1:59 PM
To: Patr¡ck Westfeldt <@
Cc :' M ega n Westfeldt' <megwestfe I dt@€ma í l. co m >
Subfect: RE: 295 Silver Mountain Drive -Final DRB Submittal
Hi Patrickl Please see below the conditions for approval:
We have reviewed the submittalfor Lot tL4,295 Silver Mountain Way, 20,(Ð0 5F Residential-Sopris Zone
District of lronbridge Subdivision, Westfuldt Residence. The Design Review Board willapprove the project on
a final basis with the following conditions and request the additional information...
Conditions ln considering the FinalApproval:
¡ 3.1Site Plannlng - Utillty meters locations are shown on the site plan, screen meters with landscaping from
view of adjacent lot. (Please Provlde.)
e 3.2 Home Slze for 20,000 SF Residential-sopris Zone District is Minimum 2,000 SF and Maximum 5,500 SF.
Area noted on the plans ls 2,269 SF. (Okay.l
o 3.4.3.1 Solar Panels - There is a solar panel array noted on both the garage and house. This has been
approved.
3.7 Landscape Plans - Sopris Phase lll Zone District requires 50 (1eal) perennlals/grass in front and 50 (1 eal)
perennials/grass side and rear. The plan shows only 50 total. (Please Provlde and addltlonal 50 (1 æll
perennials/grass.f
General Comments:
r 3.4.6 Exteriorc - No bright, unfinished surfuces shall be allowed. All metallic surfaces, such as roof vents,
flashing, fireplace flues and gutters shall be coated or painted to match the predominant color of the
roolfacia or exterior siding of the house, or as approved by the DRB.
¡ 3.11 Lighting. Minimum of 3 exterior lights necessary. All lighting on the front elevation of the home shall
be on a photo cell and cannot be altered and must be on from dusk to dawn.
. 3.18 Erosion Control - Adherence to this section is required.
r The irrigation system is to be lnstalled and maintalned as noted in the Design Guidelines. Please see current
guidelines.
. Any changes to the design, colors or grading/drainage of the Residence, Site and/or Landscaplng must be
submitted to the DRB for approvals.
. Notification By General Contractor or Owner:
4.2.4 ln order to monltor compliance of construction with the approved plans, a representative of the DRB
will make periodic visits to the site during construction. The General Contractor or Owner is to notify the
Design Revlew Board two weeks prior to Certificate of Occupancy and request a review of the final
constructed residence for design compliance. The General Contractor or Owner ls to notifr the Design Review
Board one week priorto completing landscaping and to request a revlew of the final insallation for
compliance.
Ány itenn that ¡s installed, fínished sr constr{,!€ted that does not eonnply with the DesÍgn Guidelines whether
¡eviewed or not at this time, shall be rejected at the time of the Ëonformance Review and the Owner
and/or Contractor will be required to replaee or refinish such items or elements.
Doretta Reuss
Properly Management Assistant
Doretta. reuss@integratedmtn.com