January 4,2022 Project No. C1679
Henry Domville
hdomville com
Jorge Lopez
memolopezmx@vahoo.com. mx
Subsurface lnvestigation and Onsite Wastewater Treatment System Design
2-Bedroom Residence + 1 Future Bedroom
Homestead 22, Panorama Ranches
Garfield County, Colorado
Henry and Jorge,
CBO lnc. performed a subsurface investigation and completed an onsite wastewater treatment system
(OWTS) design for the subject residence. The 5.179-acre property is located outside of Carbondale, in
an area where OWTSs are necessary.
Legal Description: Section:17 Township: 7 Range: 87 Subdivision: PANORAMA RANCHES lST
AMENDED HOMESTEAD 22 5.18 ACRES
Parcel lD: 2391 -1 7 1-01-022
SITE CONDITIONS
The property is currently undeveloped. A 2-bedroom residence is proposed. The OWTS design will
accommodate the 2-bedroom residence + 1 additional bedroom in the future.
The residence will be served potable water from a community water system. The water line will enter the
property from the subdivision road. The exact route has not been noted on the site plan; however, the
water line will not come within 25-feet of any OWTS component.
The proposed soil treatment area (STA) location has an approximate 6lo 7% slope to the southwest.
The topography provided on the site plans was minimal. The trenches must follow the topography
contours. The area is vegetated with native grasses, sage, and pinion trees.
There should be no traffic or staging of material over the future STA site to avoid compaction of soils
prior to construction of the STA.
SUBSURFACE
Kumar and Associates report dated October 18,2021, Job No. 21-7-725 is enclosed.
Two soil Profile Pits (labeled PP-A and PP-B) were excavated the proposed STA.
PP-A consisted of dark brown, moist, soft, gravelly, organic sandy silty clay fill with roots to 1.O-foot,
underlain by brown, slightly moist, stiff, silty, sandy clay with gravel to a maximum depth explored of 8.0-feet.
No bedrock or groundwater was encountered.
Page2
Gradation results from a sample taken at 5 to 6.0-feet below grade consisted of 9% gravel, 30% sand, 37%
silt, and 24% clay. Soils in PP-A are consistent with Soil Type 2.
PP-B consisted of dark brown, moist, soft, gravelly, organic sandy silty clay fill with roots to 3.0-feet,
underlain by brown, slightly moist, stiff, silty, sandy clay with gravel to a maximum depth explored of B.0Jeet.
No bedrock or groundwater was encountered.
Gradation from a sample taken at 5 to 6.0-feet below grade consisted of 2o/o gravel, 33% sand, 38% silt, and
27o/o clay. Soils in PP-A are consistent with Soil f ype 2-
Based on the information presented in the Kumar and Associates report, soils align with Soil Type 2. We
are sizing the STA based on Soil Type 2. A long term acceptance rate (LTAR) of 0.6 gallons per
square foot will be used to design the OWTS.
DESIGN SPECIFICATIONS
Desiqn Calculations:
nverage Oesign Flow = 75 GPD x 2 people/bedroom x 3 Bedrooms = 450 GPD
LTAR = 0.6 GPD/SF
450 GPD / 0.6 GPD/SF x 1.0 (gravity trenches) x 0.7 (chambers) = 525 SF
The new OWTS design is based on 3-bedrooms with 2-bedrooms being developed now and for the
possibility of 1 bedroom in the future. An average daily wastewater flow of 450 GPD will be used.
For the purposes of this OWTS design, Benchmark Elevation at grade 7238.87' has been established as
100'(Finished Floor). CBO lnc. should be notified of anydiscrepancies orproblemswith grade
elevations of proposed components during installation of the OWTS.
*Elevations are based upon standard OWTS installation practices. Component elevations may change during
installation due to site conditions
The 4-inch diameter SDR-35 sewer line exiting the residence must have a double-sweep clean out and a
minimum 2o/o grade to the septic tank.
The system installation must include a 1O00-gallon, two compartment septic tank with an effluent filter on
the outlet tee. Any state-approved concrete or poly septic tank may be used. Risers must bring the
manhole lids to grade for access. lf more than one riser is added to the septic tank, an extension handle
must be installed on the effluent filter.
Effluent will gravity flow to a distribution box, and then to three gravelless chamber trenches. lf the sewer
pipe from the septic tank to the distribution box exceeds 1O0-feet in length, an additional clean out must
be installed. The distribution box must be accessible from grade and must have flow equalizers, or
similar product, installed on each outlet pipe in the distribution box to assure equalflow to each bed.
OWTS Component Minimum Elevation
Primary Tank lnlet lnvert Approximate horizontal distance 15' / min. 2% lall I
min.3.75" fall
Distribution Box Approximate horizontal distance 164' I min. 1% fall I
min.20.5" fall
lnfiltrative Surface Approximate horizontal distance to furthest trench
29' I min. 1% fall / min. 3.625" fall
Page 3
Each trench will consist of 15 'Quick 4' Standard Plus lnfiltrator@ chambers for a total 45 chambers and
540 square feet of infiltrative area. There must be at least 4-feet of undisturbed soil between each
trench. lnspection ports must be installed at the beginning and end of each trench. Ports may be cut to
grade and placed in sprinkler boxes for access.
COMPONENT SPECIFICATIONS
The component manufacturers are typical of applications used by contractors and engineers in this area.
CBO lnc. must approve alternative components prior to installation of the OWTS. Requests must
be submitted, in writing, to our office for approval prior to installation. Component technical data
sheets are available upon request.
Construction must be according to Garfield County On-Site Wastewater Treatment System Regulations, the
OWTS Permit provided by Garfield County Building Department, and this design.
I NSTALLATION CONTRAGTOR
CBO lnc. expects that the installer be experienced and qualified to perform the scope of work outlined in this
design. The installer must review this design thoroughly and coordinate with our office in advance of
installation. Any additional conditions in this design or county permit must be completed and documented
prior to final approval of the OWTS installation, Communication between the installer and this office is
expected throughout the installation.
INSTALLATION OBSERVATIONS
CBO lnc. must view the OWTS during construction. The OWTS observation should be performed before
backfill, after placement of OWTS components. Septic tanks, distribution devices, pumps, dosing
siphons, and other plumbing, as applicable, must also be observed. CBO lnc. should be notified 48 hours
in advance to observe the installation.
ln an effort to improve the accuracy of the record drawing, we request that the installer provide a
sketch of the installation, including path of the sewer lines, water line installation (if applicable),
septic tank location, STA location, and measurements from building corners or another fixed
objects on the property. This sketch is most easily provided on Sheet W2.0 of the OWTS Design
Packet. Photographs of the installation and final cover are also requested to supplement our installation
documentation.
lunruumcruRERCOMPONENT MIODEL NO.IcoMMENTS
Septic Tank
Itntittratoro
M-1060-2CP h 000-gallon, 2-compartment
lpoly septic tank (can substitute
lValley Precast concrete septic
ltank)
Biotube Effluent Filter
lorenco@
lFull Size Effluent Filter and
lhousinq
Tank Risers and Lids
lorencoo
lDou
lrio'
ble-walled PVC Risers and
(24" diameter)
Distribution Box
leotvt-ot<
lDistribution box, (3) flow
lequalizers, risers, lid
lhambers
llnfiltrator@
Standard Plus þ5 'Quick 4' Standard Plus
lChambers
Page 4
REVEGETATION REQUIREMENTS
An adequate layer of good quality topsoil capable of supporting revegetation shall be placed over the entire
disturbed area of the OWTS installation. A mixture of native grass seed that has good soil stabilizing
characteristics (but without taproots), provides a maximum transpiration rate, and competes well with
successional species. No trees or shrubs, or any vegetation requiring regular irrigation shall be placed over
the STA. Until vegetation is reestablished, erosion and sediment control measures shall be implemented
and maintained on site. The owner of the OWTS shall be responsible for maintaining proper vegetation
cover.
OPERATION INFORMATION AND MAINTENANCE
The property owner shall be responsible for the operation and maintenance of each OWTS servicing the
property. The property owner is responsible for maintaining service contracts for manufactured units,
alternating STAs, and any other components needing maintenance.
Geo-fabrics or plastics should not be used over the STA. No heavy equipment, machinery, or materials
should be placed on the backfilled STA. Machines with tracks (not wheels) should be used during
construction of the STA for better weight distribution. Livestock should not graze on the STA. Plumbing
fixtures should be checked to ensure that no additionalwater is being discharged to OWTS. For example, a
running toilet or leaky faucet can discharge hundreds of gallons of water a day and harm a STA.
lf an effluent filter or screen has been installed in the OWTS, we recommend this filter or screen be cleaned
annually, or as needed. lf the OWTS consists of a pressurized pump system, we recommend the laterals be
flushed annually, or as needed.
The homeowner should pump the septic tank every two years, or as needed gauged by measurement of
solids in the tank. Garbage disposal use should be minimized, and non-biodegradable materials should not
be placed into the OWTS. Grease should not be placed in household drains. Loading from a water softener
should not be discharged into the OWTS. No hazardous wastes should be directed into the OWTS.
Mechanical room drains should not discharge into the OWTS. The OWTS is engineered for domestic waste
only.
ADDITIONAL CONSTRUCTION NOTES
lf design includes a pump, weep holes must be installed to allow pump lines to drain to minimize risk of
freezing. The pump shall have an audible and visual alarm notification in the event of excessively high-
water conditions and shall be connected to a control breaker separate from the high-water alarm breaker
and from any other control system circuits. The pump system shall have a switch so the pump can be
manually operated.
Excavation equipment must not drive in the excavation of the STA due to the potential to compact soil.
Extensions should be placed on all septic tank components to allow access to them from existing grade.
Backfill over the STA must be uniform and granular with no material greater than minus 3-inch.
LIMITS:
The design is based on information submitted. lf soil conditions encountered are different from conditions
described in report, CBO lnc. should be notified. All OWTS construction must be according to the county
regulations. Requirements not specified in this report must follow applicable county regulations. The
contractor should have documented and demonstrated knowledge of the requirements and regulations of
the county in which they are working. Licensing of Systems Contractors may be required by county
regulation.
Page 5
Please call with questions
Sincerely,
CBO lnc.
Carla Ostberg, MPH, REHS
(,' ¡r.,, ( * ûJ /t,t,r, y,
1*."
r*'"
RESIDËNCE +
1 FUTURE
BEDROOM
DRIVEWAY
PANOPêI'/IA
DRIVE
oeÑ
SCALE: I = 50'=0'
/'\ SITE PLAN\t,-ffi
.::
LINE
)
r,¿g
SEPTIC
TANK
"1 j
HOMESTEAD 22
225760ç
5.t8AC t
:
IHE LOCATION OF PROPOSÊO TMPROVÊMENTS SHOWNARE
NOT THE RESUTTOF A PROPERry SURVEY, THE LOCATIONS
ÁREÀPÞROXIMTE-ITISTHEHOMEOWNERS'DUryTO
ENSURE AIL CONSIRUCT¡ON AND IMPROVEMENT LOCATIONS
ARE ACCUMIE, PROPERry LINES AND SETBACK DISTANCES
SHOULD BE CONFIRMEO PRIORTO SCAVATION, SCALEO
:r.
FOR PRINTING ON 11'X 17" PAPER,
v ,"'
., ..-|
DRAWINGS MUST BE USED IN
CONJUNClION WTH DESIGN
LENER DATED O1/04/2022
Dala: 0110412022
Designed by: CBo
Drawn byr DD
w1.0
Sheet 1 0F 4
CBO lnc.
129 Cains Lano
Ca.bondals, Colorado 81 623
Phone 970.309.5259
cada.oslbêrg@gmâ¡1.@m
Homestead 22, Panorama Ranches
carfìeld County, Colorado
ProjectNumber: C1679
Domville-Lopez Residence
EA DRNÉ
ANORA$IIAP
SCALE: 1" = 2010"
x 7?24.90sÊ
O,,W
4547R
4 0+6BSB 7 4651C
2-BEDROOM
RESIDENCE +
1 FUIURE
BEDROO¡¿I
oo
1 00
LINE
.',,at , ,'!ì::ì,. 1. ".
..'. ':. .1
l-:,,:r:, .:
330
¿t 7¿1s.r4
DIA SDR.35 SEWER LINE TO EACH TRENCH
(MrN. '1% SLOPE TO ÍRENCH)
-. ::r, j::.. .:';INSTALL ADDITIONAL
CLEAN OUT (MIN. EVERY
f00)
4" DIA SDR-35 INSPECTION PORIAT
BEGINNINGAND END OF EACH TRENCH
:rl- ' .
,.:. !
'r": ''...'. ::"
:: j, i:
DISTRIBUTION BOX ÊF 7238.87
B[rl 100'WITH ACCESS AT GRADE
'QUICK.4' CHAMBER TRENCHES.
3 TRENCHES WITH 15 CHAMBERS PER TRENCH
FOR ATOTAL OF 45 CHAMAERS AND
540 SF.
trr,,:1-_.:
.ì].. NoÌE: TRENoHEs MUST FOLLOW THE
. . NATUML CONTOTJRS
r.:-i ,1,r;il:,
.:: r
4'DIA SDR.35 PVC SEWER LINE
(t/rN. 1% FALL TO D-BOX)
1 OOO.GALLON, TWO"COMPARTMENI
SÉPTIC TANK WITH EFFLUENT SCREEN
. 4'DIA SDR-35 SÊWER PIPE CLEANOUT. ¡.,IIN 2Ol" FALL TO TANK
^ PROPOSED OWÏS\l/-=---."..æ
Drawn
o1t04t2022 w2.0
Sheet 2 0F 4
CBO lnc.
129 Câins Lânê
Carbondale, colorado 81623
Phone 970.309.5259
@da.oslberg@gmail.æm
Homêstead 22, Panorama Ranches
Garfìeld County, Colorado
Project Number: C1679
Domville-Lopez Residence
GMVELLESSAUCK4
cwÈER {4x 3)
4. OrASDR 35 DrSlRlSUl¡ON
IINE TO $CH MÉNCH
(MtN. 1 % SLOPË fO IRÈNCH)
4'Dh SÞR-35
¡NSPÊCIION
4'CHMBERÊNO sotL
INSPECTION 'QUtCK{'
ENDOF 4CH IRENCH A CHAMAER NENCH PLANL,re
(4
90x oR lFRlølloN SOXAND COVER EROUGHT TO GMDE
ORÌHRNEO CONCREIECLilOfrÆSÊMBIY
ãñffiãfióE-
USÉ HOLÈ SAW TO BAFFLE OR
ANGLED PIPE
fO BE USEO
AT INLEI
^ INSPECTON PORT OETAIL\¿re ADISRIBUTON BOX DEIAIL\1re
oooo
OUILETS
CBO lnc.
129 Cains Lane
Caùondalo, Colorado 81623
Phone 970.309.5259
crla.oslberg@gmail.com
Domville-Lopez Residence l1ale: o1to4l2o22
loesiqneo uv' ceo
lorawn
bv: DD
Homostead 22, Pânorama Ranches
cãrlield County, colorado
ProlectNumbêr: C1679
w3.0
Shêet 3 0F 4
OESIGN
2.BEOROOM RESIDENCE + 1 FUTURE BEDROOM
(75 GPD x2 PERSONS/BEDROOM x3 AEDROoMS)
WASTEWATER FLOW = 450 GPO
OMS COMPONENTS AND MINIMUM REQUIRED APPROXIWTE PROPOSÊD
SETBACKÞHYSICAI FFÂIIIRFS
HOUSEfO SEPTICTANK 5',14'
SEPTIC TNKlO WELL 50'
SEPTIC TANK TO WAfER COURSE 50'
STATO HOUSE 20'160'
SIAfOWELL 100'
STA TO WATER COURSË 50'
TANK:
MIN. IOOOGÂLLONS
USE IOOO.GALLON, MO-COMPARTMENT SEPIIC TANK
SOL.TRSIMËNT ARS (STA)|
LONG TERMACCEPÍANCEMTE (LTAR) = 0.6 GAUSF
CALCUUTEO STA - CTLTAR = 450 / 0.6 = 750 SF
cilVlil,ÎRENCHES = 750 SF X 1.0 = 750 SF
CHMBERS = 750 sFX0.7 = 525SFl 12 SF/GHAMBER=44 CHNBERS
THREE GilVELLESS CHMBER TRENCHES
'5
AUICK4'CHAMAËRS IN ilCHTRENCH
ÍOTAL 45 'QUICK 4' CHAMBERS
FINISHED GilDE
SLIP.ON PVC
DO NOT GLUE
TMCERWRE FINISHED GRADE
4" DIASDR.35 SEWER
4'DIA
(MtN 2% SLOPE TOfAñK,
MIN.1%TOSTA)
SEWER LINE
SCREENEÐ
OR SAND FOR
AEÐDING
3'MlN.
TO
MIN,
^ CLEÀN OUT DETAIL!,l_
A RENCH DETAIL\9l_
CBO lnc.
129 Calns Lans
Ca¡bondale, Colorado 81623
€la.ostberg@gmail.@m
Domville-Lopez Residence
Homosteâd 22, Panorama Ranches
Gêrfìeld County, Colorâdo
ProjectNumb€r: C1679
Dalet 0110412022
Designed by: CBO
Drawn by: DD
w4.0
Sheet4 0F 4
rcJl åiçlå'ffifî:É$;r''Iå; å'' * *5020 Cour.rty Roacl 154
Glenrvood Springs, CO 8160 I
phone: (970) 945-7988
fax: (970) 945-8454
email: kaglenwoocl@kutnarusa.com
wn rv. kttt.narusa.cotttAn Employee Owned ComPcny
Oll'ice Locations: Denver'(llQ), Parker; Colorado Springs, Folt Collins, Glenrvoocl Springs, and Summit County, Coloraclo
October 18,2021
Jorge Guillermo Lopez
175 West 93'd Street, Apt. l2H
New York, New York 10025
rnemolnxlopez@glnaiLcotu
Project No.2l-7-725
Subject: Subsoil Study for Foundation Design, Proposed Residence, Lot22, Panorama
Ranches, Panorama Drive, Garfield County, Colorado
Dear Mr. Lopez:
As requested, Kumar & Associates, Inc. performed a subsoil study for foundation design and
septic disposal feasibility at the subject site. The study was conducted in accordance with our
proposal for geotechnical engineering services to you dated August30,202I. The data obtained
and our recommendations based on the proposed construction and subsurface conditions
encountered are presented in this reporl.
Proposed Construction: The proposed residence will be a one to two story structure over a
crawlspace or slab-on-grade, located on the site as shown on Figure l. Cut depths are expected
to range between about 4 to 8 feet. Foundation loadings for this type of construction are
assumed to be relatively light and typical of the proposed type of construction. The septic
disposal system is proposed to be located in one of the two areas indicated on the site plan.
If building conditions or foundation loadings are significantly different from those described
above, we should be notifîed to re-evaluate the recommendations presented in this reporl.
Site Conditions: The site was vacant of structures ancl vegetated with sage brush, scrub oak,
grass and weeds. The ground surface appears natural and slopes gently to moderately down to
the west-northwest. There has been some minor grading for Panorama Drive on the north, west
and south sides of the site.
Subsurface Conditions: The subsurface conditions at the site were evaluated by excavating two
exploratory pits in the building area and one profile pit in each of the designated septic disposal
areas, A and B, at the approxirnate locations shown on Figure 1. The logs of the pits are
presented on Figure 2. Thesubsoils encountered, below about 1 foot of topsoil, consist of stiff,
sandy silty clay to clayey sand with gravel (Pit 1) or medium dense, silty sand and gravel clown
to the bottom of the pits at 8 feet (Pit 2). Results of gradation analyses perfonned on samples of
the deeper soils (minus 3-inch fraction) obtained from the pits are presented on Figure 3. The
.,
laboratory test results are summarized in Table 1. No free water was observed in the pits at the
time of excavation and the soils were slightly moist to moist.
Foundation Recommendations: Considering the subsoil conditions encountered in the
exploratory pits and the nature of the proposed construction, we recommend spread footings
placed on the undisturbed natural soil designed for an allowable bearing pressure of 2,000 psf for
support of the proposed residence. The soils tend to compress after wetting and there could be
some post-construction foundation settlement. Footings should be a minimum width of
16 inches for continuous walls and 2 feet for columns. Loose and disturbed soils encountered at
the foundation bearing level within the excavation should be removed and the footing bearing
level extended down to the undisturbed natural soils. We should observe the completed
foundation excavation to confrrm suitable bearing conditions. Exterior footings should be
provided with adequate cover above their bearing elevations for frost protection. Placement of
footings at least 36 inches below the exterior grade is typically used in this area. Continuous
foundation walls should be reinforced top and bottom to span local anomalies such as by
assuming an unsupported length of at least 12 feet. Foundation walls acting as retaining
structures should be designed to resist a lateral earth pressure based on an equivalent fluid unit
weight of at least 50 pcf for the on-site soil as backfill, excluding organics and rock larger than 6
inches.
Floor Slabs: The natural on-site soils, exclusive of topsoil, are suitable to support lightly loaded
slab-on-grade construction. To reduce the effects of some differential lrovetnent, floor slabs
should be separated frorn all bearing walls and colutnns with expansion joints which allow
unrestrained vertical movement. Floor slab control joints should be used to reduce damage due
to shrinkage cracking. The requirements for joint spacing ancl slab reinforcement should be
established by the designer based on experience ancl the intended slab use. A minimum 4 inch
layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage.
This material should consist of minus 2 inch aggregate with less than 50o/o passing the No. 4
sieve and less than 2Yo passingthe No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least95o/o of maxtmum
standard Proctor density at a moisture content near optimum. Required fill can consist of the on-
site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encounterecl during our exploration, it has
been our experience in the area that local perched groundwater can develop during times of
heavy precipitation or seasonal runoff. Frozen ground during spring runoffcan create a perched
condition. We recommend below-grade construction, such as retaining walls, crawlspace and
Kumar & Associates, lnc. @ Project No,21-7-725
aJ
basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain
system.
The drains should consist of drainpipe placed in the bottorn of the wall backfrll surrounded above
the invert level with free-draining granular material. The drain should be placed at each level of
excavation and at least I foot below lowest adjacent fînish grade and sloped at a minimum lo/o to
a suitable gravity outlet. Free-draining granular material used in the underdrain system should
contain less than 2o/o passingthe No. 200 sieve, less than 50% passing the No. 4 sieve and have a
maximum size of 2 inches. The drain gravel backfill should be at least lYz feet deep.
Surface Drainage: The following drainage precautions should be observed during construction
and maintained at all times after the residence has been completed:
l) Inundation ofthe foundation excavations ancl underslab areas should be avoided
during construction.
2) Exterior backfill should be adjusted to near optirnurn moisture and compactecl to
at least 95Yo of themaximum standard Proctor density in pavement and slab areas
and to at least 90% of the maximum standard Proctor density in landscape areas.
Free-draining wall backfill should be capped with about 2 feet of the on-site, finer
graded soils to reduce surface water infiltration.
3) The ground surface surrounding the exterior of the building should be sloped to
drain away from the foundation in all directions. We recommend a minimum
slope of 12 inches in the first l0 feet in unpaved areas and a minimum slope of
3 inches in the first 10 feet in pavement and walkway areas.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Landscaping which requires regular heavy irrigation should be located at least
5 feet from the building. Consideration should be given to the use of xetiscape to
lirnit potential wetting of soils below the building caused by irrigation.
Septic System: One profile pit was dug at each of the two septic field locations shown on
Figure 1. The soils exposed in the Profile Pits are shown on Figure 2 ancl consist of loam.
USDA gradations were performed on soils fi'orn each pit as shown on Figures 4 and 5. Based on
the subsurface conditions encountered, either septic area should be suitable for a conventional
inf,rltration septic disposal system. A civil engineer should design the infiltration septic disposal
systern.
Limitations: This study has been conductecl in accordance with generally accepted geotechnical
engineering principles and practices in this area at this time. We make no warranty either
Kumar & Associates, lnc. o Project No, 21-7-725
-4
express or implied. The conclusions and recommendations submitted in this report are based
upon the data obtained from the exploratory pits excavated at the locations indicated on Figure l,
the proposed type of construction and our experience in the area. Our services do not include
determining the presence, prevention or possibility of mold or other biological contaminants
(MOBC) developing in the future. If the client is concerned about MOBC, then a professional in
this special field of practice should be consulted. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory pits and variations in the
subsurface conditions may not become evident until excavation is performed. If conditions
encountered during construction appear different from those described in this report, we should
be notified at once so re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We are not
responsible for technical interpretations by others of our infonnation. As the project evolves, we
should provide continued consultation and field services during construction to review and
monitor the implementation of our recommendations, and to verifu that the recommendations
have been appropriately interpreted. Significant design changes may require additional analysis
or modifications to the recommendations presented herein. We recommend on-site observation
ofexcavations and foundation bearing strata and testing ofstructural fill by a representative of
the geotechnical engineer.
If you have any questions or if we may be of further assistance, please let us know.
Respectfully Submitted,
't¡i.. t : szr i"t i' i!.: Ìt s 5 Lt t: i it T'i. :i,''t ti :;: .
Daniel E. Hardin, P.
Rev. by: SLP
DEH/kac
attachmeuts Figure 1 - Location of Exploratory Pits
Figure 2 - Logs of Exploratory Pits
Figure 3 - Gradation Test Resuits
Figures 4 &. 5 * USDA Gradation Test Results
Table 1 * Summary of Laboratory Test Results
it.y i.it I
i{u¡¡;i¡r å À;xr:e i*1*:, lni:.íi'i,ljtr;1 ik¡. 2'i-7- it).5
Sùbto¡¡ study. P.oFd!I-t&" *r"WÆwñrtapNion Effi'-ilaìiffii3'iWM1oplion2foKryF#+',.h=+fuïil'* |,.ñr¿€-... t"í,:È*'r'ÍrlË.'#ffiâS,Yj14¡=:ffim'F#w{}xffi:71¡t}3#^ò&-#*ff'tË.FffiffiÌs,¡F ..,ltúr\rilrl?lrs..XGNl¿ë..-qÈ\i,,:rffiÈrÈ*W.-67(roo-E-unox-lr(nC)rrI-rìrr--lrOC)-loz.o-ÎtrrlX-or-On-+OÐ-U=U)-1.ì(oYI--,1I!N)C¡xc3o)-AoØØoo.0)oØ
¡
Ê
I
I
PIT 1 Pfi2 PP-A PP_B
0 0
F-U
LdtL
I-f-o-
LJô
WC= 1 0.1
DD= 1 07
t-Ut!
LL
IIFo-
LJo
5 WC=8.7
DD= 86 ¡ WC=7.9- GRAVEL=9
SAND=50
Sl LT=57
CLAY=24
¡ WC= 1 3.4- GRAVEL=2
SAN D=33
Sl LT=38
CLAY=27
5
-1 tNC=7.7- +4='l B
-200=60
-l wc=+. t
'+4=37
-200=19
10 10
LEGEND
FILL; ORGANIC SANDY SILTY CLAY WITH ROOTS, GRAVELLY, SOFT, MOIST, DARK BROWN
CLAY (CL); StLTY, SANDY, W|TH GRAVEL AND COBBLES, STIFF, SLTGHTLY MO|ST, BROWN
sAND AND GRAVEL (CV-SV); StLTY, MEDTUM DENSE, SLTGHTLY MO|ST, BROWN
F
t
I]AND DRIVE SAMPLE
DISTURBED BULK SAMPLE
NOTES
1. THE EXPLORATORY PITS WERE EXCAVATED WITH A CAT 307 BACKHOE ON OCTOBER 8, 2021
2, THE LOCATIONS OF THE EXPLORATORY PITS WERE MEASURED APPROXIMATELY BY PACING FROM
FEATURES SHOWN ON THE SITE PLAN PROVIDED.
3. THE ELEVATIONS OF THE EXPLORATORY PITS WERE NOT MEASURED AND THE LOGS OF THE
EXPLORATORY PITS ARE PLOTTED TO DEPTH,
4, THE EXPLORATORY PIT LOCATIONS SHOULD BE CONSIDERED ACCURATE ONLY TO THE DEGREE
IMPLIED BY THE METHOD USED.
5, THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY PIT LOGS REPRESENT THE
APPROXIMAÏE BOUNDARIES BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE GRADUAL.
6. GROUNDWATER WAS NOT ENCOUNTERED IN THE PITS AT THE TIME OF EXCAVATION. PITS WERE
BACKFILLED SUBSEQUENT TO SAMPLING.
7. LABORATORY TEST RESULTS:
WC = WATER CONTENT (%) (ASTM D 2216);
DD = DRY DENSITY (PCt) (ASTU D 2216);+4 = PERCENTAGE RETAINED ON NO. 4 SIEVE (ASTM D 422);
-2oo= PERCENTAGE PASSING No. 200 SIEVE (ASTM D 1140);
GRAVEL = PERCENT RETAINED ON N0. 10 SIEVE;
SAND = PERCENT PASSING NO.10 SIEVE AND RETAINED ON NO.525 SIEVE;
SILT = PERCENT PASSING NO. 325 SIEVE TO PARTICLE SIZE .002MM;
CLAY = PERCENT SMALLER THAN PARTICLE SIZE .002MM.
21 -7 -725 Kumar & Associates LOGS OF EXPLORATORY PITS Fi1. 2
9
Ê
r
a
HYDROMETER ANALYSIS SIEVE ANALYSIS
U.S. STANDARÐ SERIESTIME READINGS
24 HRS 7 HRS
I qMIN ¿útN
I
l I
j
I
l
l
l
I
I
I
'ì
i
I
lo0
a0
70
60
50
40
50
20
10
o
o
to
20
50
10
50
60
70
80
90
fo0
h
.o75 l
-125
DIAMETER CLES IN MILLIMETERS
CLAY TO SILT COBBLES
GRAVEL 18 % SAND
LIQUID LIMIT
SAMPLE 0F: Grovelly Sondy Silly Cloy
PLASTICITY INDEX
SILT AND CLAY 60 %
FROM:Pit1@6'-7'
=
100
90
ao
70
60
50
40
30
10
o
=h
.o75 150 .300 L600
.125
1,14 I 2.36 4,75
2.O
LLI METERS
9.5 t9 34.1 76,2 127
I
DIAMETER OF PARTICLES IN MI
CLAY TO SILT COBBLES
GRAVEL 37 % SAND
LIQUID LIMIT
SAMPLE OF: Silly Sond ond Grovel
44%SILT AND CLAY 19 %
PLASTICITY INDEX
FROM:Pil2@6'-7'
Th€s€ lêsl rêsulls opply only to lh6
sompl€s wh¡ch wore l6slod. Thê
l€sllng roport sholl not b6 roproduced,
€xcepl ln full, wlthoul lhô wrlllêh
opprovol of Kumor & Assocíolos, lnc.
Slov6 onolysls lesllng ls perlormed ln
occordoôc6 wllh ASTM 06915, ASTM 07928,
ASTM Cl56 ond/or ASTM Dl140.
GRAVELSAND
FINE MEDTUM lCOIRSe FIN E COARSE
SIEVE ANALYSISHYDROMETER ANALYSIS
TIME READINGS
24 HRS 7 HRS
U.S. SIANDARD SERIES CLEAR SQUARE OPENINGS
\/^" \/^" 1 1/r"
I
I
I
1
I
i
I
I
i
SAND GRAVEL
FI NE COARSEFIN E MEDIUM COARSE
21 -7 -725 Kumar & Associates GRADATION TEST RESULTS Fig.3
HYDROIVETER ANALYSIS SIEVE ANALYSIS
TIl\/E READINGS SERIES
#1A #10
CLEAR SQUARE OPENINGS
24 HR. 7 HB 1 MIN,
045
60t!11N.3" 5" 6', I'
100
'10
/
90
20 BO
30 70
o
Ldz.
=t-LI
É,
Fz
LJ()É
t¡JL
40 60
()
z.
tn(n
o-
Fz.
L¡l(J
É.t¡l
o_
50 50
60 40
70 30
BO 20
90 t0
100 .001 .002
DIAN/ETER OF PARTICLES IN MILLIIVIETERS
CLAY COBBLES
GRAVEL 9 %SAND 30 %SILT 37 %CLAY 24 %
USDA SOIL TYPE: Loam FROM: PP-A @ 5'-6'
SMAI L MEDIUM LARGESILT
21 -7 -725 Kumar & Associates USDA GRADATION TEST RESULTS Fig. 4
E
ï
I
SIEVE ANALYSISHYDROMETER ANALYSIS
E READINGS
60MtN. igMtN. 4
SERìES
#1A #10
CLEAR SOUARE OPENI
24 HB. 7 HB 1 MIN,
#325 +4
045
#140. #60 #35 100
10 90
20 BO
30 70
o
lrJz
f-t¡lÉ
Fz
Ld()ÉLIo-
40 60
(,z
l/'t
U)
È
t--z.
t¡JOÉ.
L¡Jo-
50 50
40
70 30
20
90 10
100 0
.001 .002 .106 .025 .500 1.00 2.00 4.75
DIAMETER OF PARTICLES IN MILLIMETERS
CLAY COBBLES
GRAVEL 2 %SAND 33 %SILT 38 %CLAY 27 %
USDA SOIL WPE: Loam FROM: PP-B @ 5'-6'
COARSF SMALL [,1EDIUl\,4 LARGESILT
21 -7 -725 Kumar & Associates USDA GRADATION TEST RESULTS Fig.5
rc ii.ril,*trtfr:Étrri:iy;*"'
è;
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
No.21-7 -725
SAMPLE LOCATION NATURAL
MOISTURE
CONTENT
t:/"1
NATURAL
DRY
DENSITY
(pcr)
GRAVEL
ti/"|
SAND
l%)
SILT & CLAY
f/"1
GRAVEL
(%)
SAND
(%)
SILT
(%\
CLAY
v"t
SOIL TYPEPITDEPTH
(ft)
I 3 10. I 107 Sandy Silty Clay
606-7 7.7 l8 22 Gravelly Sandy
Silty Clay
Clayey Sand258.7 86
6-7 4.1 37 44 19 Silty Sand and
Gravel
9 30 37 24Profile
A 5-6 7.9 Loam
Profile
B 5-6 13.4 2 33 38 27 Loam
IMPROVEMENT SURVEY PI.AT
Honestead22,
PANORAMA MNCHES, A RURAL COMMUNITY
LEGAL DESCRIPTION
\. \*t
\l
\l-\ ì
-1"¡ ' I
ilj l¡tliil
lt
I
ltl
I
i'i.
il
Eì=Ea==1
Lègend
ìJ
Í¡¡orats i!ft {rxa¡
_ üh¡,ûrsvd.iø!4
SURVEYOR'S CEMFICÆE
HIRED GUN SURVEYING, LLC
2816 PR¡MROSE COURI
MONnOSE, COLOMDO 81401
(970)964-6105
G)qPublic.net"' Garfield County, CO
Account
Number
Parcel
Number
Acres
Land SqFt
Tax Area
2019 Mill
Levy
R011107
239r77101022
Physical
Address
Owner
Address
CARBONDALE
DOMVILLEANDRADE, HENRY DE GASPE
& LOPEZ
175 WEST 93 STREET APT 12H
NEWYORKNY 10025
Overview
Legend
i i Parcels
Roads
Parcel/Account
Numbers
Highways
: Limited Access
- Highway
Major Road
Local Road
Minor Road
Other Road
Ramp
Ferry
Pedestrian Way
Owner Name
Lakes & Rivers
- County Boundary
Line
20lgTotalActual $180,000 Last2Sales
Value Date Price
81623 s/t/2]27 $O
rr/2/2o2o $199,000
0
5
0
011
79.7760
Dale crealed:7/4/2022
Last Data Uploaded: 7/4/2022 2:57:42 AM
Dev e ro pe d by C) p,"þEB,.{ fl
114122, 12:06 PM qPublic.net - Garfield County, CO - Property Record Card: R011107
tÐqPublic.nef'' Ga rfi eld Cou nty, CO
Summary
Account
Parcel
Property
Address
Legal
Description
Acres
Land SqFt
Tax Areâ
Mill Levy
Subdivision
R011107
23911710IO22
,CARBONDALE,CO 81623
Section: 17 Townshlp: 7 Range: 87 Subdìvision: PANORAMA RANCHES
lSTAMENDED HOMESTEAD 22 5.18ACRES
5.779
0II
79.7760
PANORAMA RANCHES 1ST AMENDED
View Map
Owner
DOMVILLE ANDRADE, HENRY DE GASPE & LOPEZ
175 WEST 93 STREETAPT 12H
NEWYORKNYlOO25,
Land
Unit Type 5 AC TO L/T 10 AC - 0530 (VACANT LAND)
Square Feet 0
Actual Values
Assessed Year
Land Actual
lmprovement Actual
Total Actual
Assessed Values
Assessed Year
Land Assessed
lmprovement Assessed
Total Assessed
Tax History
2020
$4,762.16
2019
$4,199.r2
2027
$180,000.00
$0.00
$180,000.00
2027
$52,200.00
$0.00
$52,200.00
2074
63,728.4O
2020
$190,000.00
$0.00
$190,000.00
2020
$ss,100.00
$o.oo
$55,100.00
20!7
$3,5ó3.88
Tax Year
Taxes Billed
2027
$4,764.32
Click here to v¡ew the tax information for th¡s palggl-9ntbg-fu"ÚSl!!9ll-üy-tCæ!rcÉtrygÞjle.
Transfers
Sale Date Deed Type ReceptÌon Number
5/7/2027 COVENANTS 956397
17/2/2O2O SPECTALWARRANTYDEED 944740
17/17/2076 RESOLUTTON 888139
5/29/2007 WARRANTYDEED 724460
4/2O/2OOO WARRANTYDEED 562457
4/2O/2OOO AFF|DAVIT 562456
8/T6/P9? WARRANTY DEED 550óó5
7/2/1996 WARRANWDEED 4?7457
70/70/7979 SUBDIVISION IMPROVEMENTS 29838r.
8/30/r?79 COVENANTS 298349
Book - Page
1932-0232
1183-580-582
tL83-579
tLA6-LO?
0989-0667
o53ó-0878
0536-0799
Sale Price
$o
$199,000
$o
$29s,000
$138,s00
$o
$120,000
$7ó,000
$o
$o
No data available for the following modules: Buildings, Photos, Sketches.
The G¡rñeld Coir¡tty Assessor's Ofiìce makes every effort to protluce the ftost iccrl.:tÉ irtfornt:tiort possible. Nc v¡¿rr¿¡rtit-s. expreçs€d or
c;nnot be gLrarantced.
9-çer. Priçcy Pplicy
GDPR Privacy.Noticq
Last Data Uplo¿d: 114/?O?2,72:57:42.AM Ver;ion 2 3.1óE
Developed by
É)9."å'mr'4çr
https://qpublic.schneidercorp.com/Application.aspx?ApplD=1 038&LayerlD=22381&PageTypelD=4&PagelD=9447&Q=1319195659&KeyValue=R011107 111