HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT
BLRE-05 -22-7 509
JESSE FLOWERS
New S/F Dwelling with attached g"rage
TBD Cattle Dr, Silt
Antler's Orchard, Lot 43 - 21273ó300087
1) ALL WORK SHALL COMply WITH THE 2015 INTERNATIONAL RESIDENIIAL CODE (l.R.C.)
AND 2009 TNTERNATIONAL ENERGY CONSERVATION CODE (I.E.C.C.)
2) pROPOSED TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE
ATTACH ED "GARFIELD COU NTY BU I LDING REOUI REMENTS". NU M BER REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST.
3) ELECTRTCAL PERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
4) WILDFIRE MITIGATION REOUIREMENTS: COMPLY WITH WILDFIRE MITIGATION AND
DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL
FIRE DISTRICT.
5) pRE FABRTCATED ROOF TRUSSES. HAVE ENGTNEERING FOR INSPECTOR AT TIME OF FRAME
INSPECTIOI.'1.
ó) opEN HOLE SOTLS REPORT rS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY
CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE
BUILDING INSPECTOR. 3,OOO PSF
7) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECÏED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S
FINAL REPORT TO GARFIELD COUNTY PUBLIC HEATH PRIOR TO SCHEDULING A FINAL
BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.