Loading...
HomeMy WebLinkAboutConditions of PermitCONDITION OF PERMIT B LRE-05-2 2-7 523 Travis & Laurie Ruonavaara New S/F Dwelling with attached garage (& unfiníshed basement area) 1237 Scutter Ln, Rifle 1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (l.E.C.C.) 2) PROPOSED TMPROVEMENTS ARE SUBJECITO ALLAPPLICABLE ITEMS CONIAINED lN THE ATTACH ED "GARFI ELD COU NTY BU I LDI NG REQUIREM ENTS". NU M B ER REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LISÏ. 3) ELECTRTCAL PERMITTINc AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 4) WILDFIRE MlTlcATloN REOUIREMENTS: COMPLYWITH WILDFIRE MITIGATION AND DEFENSIBLE SPACE REOUIREMENTS PER COLORADO STATE FOREST SERVICE AND LOCAL FIRE DISTRICT. 5) PRE FABRICATED ROOF TRUSSES. HAVE ENGINEERING FOR INSPECTOR AT TIME OF FRAME INSPECTION. ó) opEN HOLE SOTLS REPORT tS REOUTRED AT FOOTING INSPECTION AND PRIOR TO ANY CONCRETE POUR. PROVIDE COPY OF GEOTECHNICAL ENGINEERS REPORT TO THE BUILDING INSPECTOR. STRUCTURAL ENGINEER HAS DESIGNED FOUNDATION SYSTEM AT 1,500 PSF SOIL BEARING. 7) ON-StrE WASTEWATER TREATMENT SYSTEM (OWTS)TO BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT TO GARFIELD COUNTY PUBLIC HEATH PRIOR TO SCHEDULING A FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) SCOPE OF WORK DESCRTBES AN UNFTNTSHED BASEMENT. SEE PLAN ATTACHMENT PAGE 9 AND ALL STAMPS ON BASEMENT PLAN A-101 FOR FURTHER INSTRUCTION. A SEPARAÏE PERMIT IS REOUIRED TO FINISH UNFINISHED BASEMENT.