Loading...
HomeMy WebLinkAboutEngineer's Framing Letter 06.29.2022I m[$ut00D[tstffi[niffiffiG. ?0til9í rIltunlll¡, G0 81t85 f0t0t809{s02 Shawn P. Greenwood, P.E. GREENwooD ENGINEERING, INC. P .O E x S11 Telluride, CO 81435 6-29-2422 RE:2645 East Elk Creek, New Castle, CO To Whom lt May Concern: Greenwood Éngineering, ¡nc. views lhe deck froor framing at the address above including framing member substitutions due to material availability as appropriate: All wood posts sitting on concrete are protected with vicor wrap. Allwood posts that have been notched to fit into post bases are solidly blocked with redwood down to concrete foundations, S¡ Shawn P, President Greenwood Engineering, lnc. This inspection letter does not express or imply a warranty for any structure. All warranties are provided by the builder and or subcontractor. Ë .'¡Èè,.s út o LI qónct< 0047867