Loading...
HomeMy WebLinkAboutApplicationGarfield County Fz tU:g CLoJ t¡J l.lle ì-.z3 Community Development Department 108 8th Street, Suite 401 Glenwood Springs, CO 81601 lsTols4s-82t2 www.garfield-cou nW.com BUILDING PERMIT APPLICATION Commercial/Multi-Family Demolition Manufactured Home (Single or Multi-Level) T Residential (SF, Duplex or Townhome)Reroof Accessory Dwelling Unit (ADU) - MAXIMUM SIZE OF 1,000 SQUARE FEET PARTIES Property Owner:East Acres DuBois LLC - William H DuBois Phone: (970 ) 379-1864 Mailing Address: 405 Mid Valley Dr Email Addres' ham.d8@hotmail.com contracror: Tyler Mize Cleary Building Corp.Phone:970 812-7977 Mailing Address: 7't 5 Unit A Hwy 50 Delta, CO 81416 Emait Addresr. TMize@clearybuilding.com Architect: Tyler Mize Cleary Building Corp Phone:970 812-7977 Mailing Address: 715 Unit A Hwy 50 Delta, CO 81416 Emait Addres' TMize@clearybuild ing.com Engineer:Tyler Mize Cleary Building Corp Phone:970 812-7977 Mailing Address: 715 Unit A Hwy 50 Delta, CO 81416 Email Address:TMize@clearybuilding.com Manufactured Home lnstaller Phone:I Mailing Address: Email Address: PROJ€CTDSTAI¡.S Describe 1¡¡or¡. Erect partially enclosed riding arena & stall barn rob Address: 0456 Mid Valley Dr New Castle, CO 81647 Assessor,s parcel Number: 21 8107302001 sub. H.& B. Minor t-ot 7-C Btock owner'svaluation of work: Sffijll1 , n5''-froperty Size (Sq. Ft. or Acres)r 5.92 acres Sq. Ft. of Bulldlng:Helght:26',g',# of Floors:113,248 Class of Work:Addition ed Remodel/Alteration DetachedGarage: PROJECT DETAI¡.s CONTINUED Septic:tJôN&Community Natural Gas Propane Electric Other Driveway Permit: NOTICE Authoritv. ThisapplicationforaBuildingPermitmustbesignedbytheOwneroftheproperty,describedabove, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterof authority,signedby the Owner, must be provided with th¡s Application. Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other Permits. Mult¡ple separate permits may be required: (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within 1,80 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION lherebvcertifythatlhavereadthisApplicationandthattheinformationcontainedaboveistrueandcorrect. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. ln consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulationsand applicable land use regulations (County Regulation(s)). lacknowledgethatthe Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to ¡nspect the work. I further acknowledge that the issuance of the Building Perm¡t does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance w¡th federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have provid he ired is correct and accurate to the best of my knowledge Permit #: [''=-27- Property Owner Print and Sign Date oFFrcrALUsEoNtY pAtÞ. $ r,*3q.elC CKüS3gS oL/t!/zozz¿$a,ò 6ee atal4e/eNDm)lvsSpecial Conditions: Adjusted Valuation: 3t-7 q6z Plan Check Fee: I +3q',hþ Permit Fee: -¿2,214,æ Home Fee: /* Manu. ¡.¡ Misc. Fees:N/ Total Feós: 3,¿r54,ol Fees Paid t t,{3q.'16 '15:!à'',",BP No: BrRe-1t88 OWTS No: ¡.1/e Setbacksl occ GrouP: r R¿*Const. Type: t.r¿. e Zoning: EUfdA L óut Signed Approval ølc Date 7-12BUILDING / PLANNING DIVISION 7'rt,n9* Framing plans for each floor level and roof. All beams, columns, joists, rafters and trusses specified. Pre-manufactured structures require the engineers stamp, signature and date. Framing /connection details, braced wall lines, shear wall schedule, location and hold downs. NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans for compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permit. The Building Division will collect a Plan Review fee at time of application submittal. The permit fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by person having written authority from the owner to act as their representative. Building cannot be occupied until a Certificate of Occupancy (CO) is issued. Using the building without a CO will be considered an illegal occupancy and may be grounds for vacating the premises. (Final/CO inspection requirements will be attached to your approved field set of plans.) I hereby acknowledge I have read, understand and will abide by the requirements of this checklist. a a 63¿z Property Owner rint and n Date