HomeMy WebLinkAboutCorrespondencehrrespn/rytue-
?nVa¿þ //æ-0"
Colleen W¡rth
From:
Sent:
To:
Subject:
Rbt
Iypc of
Fuilditç
need further clarification?
GENËRAL
L. What is the proposed arena's actual site elevation? 5,498
2. Could the Structural Engineer of Record with Cleary BuÍlding Corp forward an email response affirming
the roof snowload design measured from the Roof = Pf, notground Pg? On sheet number 110of the
ptans it shows a balanced roof snow load of 40psf. Below is an image with it highlighted. Do you
u¡e 6rsw(c) Clûssifieil{¡Fr:Æ
Euilünt
Tyler Mize <TMize@clearybuildìng.com >
Tuesday, luly 12,20221:'17 PM
Colleen Wifi h; ham.dB@hotmail.com
Re: lExternal] BLRE-06-22-7588 - new riding arena blueprints are now UNDER
REVIEW
lf so I will have my engin eering department contact you.
T¡TNSNOTES ANN SP
I¡
u í¡PPEHDU []
Horsc å¡wo
T¡pe vf
1lt{ö Tq. ft
l"
ìl* ¡not¡ririe a¡d lol¡or $trrr¡¡ rn ttrcle $na thot cre Þrc¡'iri¡rf ù.y *rory Buffiinq tor¡. sre tímitÊd [¡ lhsrc rr*lariok md lstor
os dslin¡d by {he Çleory nuir'fiti C*p, .ån{rocl iddilfunol rnaisriols ¡r xçe$o¡hr list o¡s ñ¿t beir{ S¡ovidetl b¡ Ckøy guílding
Csf. mcü be ¡Ùrçu¡ çn É{¡ts lot ønt¿tt w Þuildirq ççde ro*pliottco'
Tiril buildir,r¡ h draþnd in aceordD¡af $lh the ldlowìng rode* r:nd rprellirolhns:
3û1H *llemctis¿t*l Buld¡rq c¡dE {l[n]
!0tð tdilion 0f .ltotiurui üe$n $prcifieolinils fff t¡çod tçn¡ln'çtisn'
tEasl¡utlio¡r
ðuild:nE llerþn Lcods:
5r'o,rv b*gn üoto:
€rosrd 5¡u L*ui {F9):
Scdn &lø:+rd fttû{ $fl
5¡¡o# E¡tÞsflrå F{¡eicl
Slo¡e F*r,clot
Tnarrnl Fç¿:tnr
4Ð Psr
$ PËF
I
l
IJ
t,ûSno* Lood lmpøtanre Foc.{or ils)l--
l'lot Frt! .!no* Lood $¡.Þ
5lo¡rcd Roof lnor ''uld {Fs};# }3"6
Urrbolünccd 5*n L*du,- 1Û-l
å3,ñ
?l.8
tn I
Flr
F5F
P$f ffnd*c*,J
PSF l-sffud
PSF N-xrrd ¡trçh¡rle
Ft. llidt¡ qf surçäsrqt
When reâding through the truss shop stamp details and general specification notes I see some conflicting
information on values for the designed Roof snowload Pf. Garfield County jurisdiction has adopted a
local minimum required Roof snowload Pf = 40 PSF. Please confirm in writing to cwirth@earfield-
countv.com I will have my engineer contact you d¡rectly to explain.
3. As this ís a uniquely large structure, I am responsible to verify the building occupancy and use(s)
comply with Garfield County's adopted land use regulations and zoning requirements forthe lot
location.
3.a. lsthe proposed arena &stall barn intended exclusivelyforprivate use bythe propertyowners and
ídential occupants for the property? This is only for-privatere5
3.b. ls this is commercial barn structure intended for use by paying clients, customers, employees and/or
members of the general public? lf so, please explain {as this will help determine whether the building is
1
reviewed under the adopted 2015 IBC or the 2015 IRC as an accessory structure). This is onlyfor private
use.
4. Request to confírm the current building structure will remain unheated with no septic system, leach
field, no finished plumbing fixtures and no wood, natural gas or LP propane fuel fired appliances or
mechanical equipment? No on all.
5. Does the owner intend the structure to have any floor, wall, or ceíling insulation installed? lf so, provide
list of insulation materials and R-values. No insulation at this time.
Any support you can offer on questions L-5 are greatly appreciated as the responses will help me in
decision how the rema inder of the FIELD a nd OFFICE COPY are sta mped and redlined. I do not wish to add
conditions or requirements that pose a conflict or confusion for the builder andlor building inspectors
during constructíon. Confirmation now before release wíll prove useful.
Tyler Mize
Branch Manager
Cleary Building Corp.
Phone: Office 970-874-t066 | Cell: 970-812-7977
www.clea rvbui ld ing.com
AHÏ
BUILDING GORP.
SEFVIÌIG ÐUR CLIEhITS SINCE 1978
From: Col I een Wi rth <cwirth @garf ield-cou nty. com>
Sent: Monday, July IL, 2A22 2:46:52 PM
To: Tyler Mize; ham.d8@hotmail.com
Subject: IExternal] BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW
BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW
Courtesy message for Wíllíam DuBois and Tyler Mize, Cleary Building Corp
l've started the archítecturaland structural reviewof the riding arena building proposed at456 Mid Valley Dr
in New Castle.
Need some help answering a few questions
1. What is the proposed arena's actual site elevation?
2
2. Could the Structural Engineer of Record with Cleary Building Corp forward an email response
affirmíng the roof snowload design measured from the Roof = Pf, not ground Pg?
When reading through the truss shop stamp details and general specification notes I see some conflicting
information on values forthe designed Roof snowload Pf. Garfield County jurisdiction has adopted a local
minimum required Roof snowload Pf = 40 PSF. Please confirm in writing to cwirth@earfl d-countv.com
3. As this ís a uniquely large structure, I am responsible to verify the building occupancy and use(s)
comply with Garfield County's adopted land use regulations and zoning requirements for the lot
location.
3.a. ls the proposed arena & stall barn intended exclusively for private use by the property owners and
residential occupants for the property?
3.b. ls this is commercial barn structure intended for use by paying clients, customers, employees and/or
members of the general public? lf so, please explain (as this will help determine whether the buílding is
reviewed under the adopted 2015 IBC or the 2015 IRC as an ãccessory structure).
4. Request to confirm the current building structure will remain unheated with no septic system, leach fíeld,
no finished plumbing fixtures and no wood, natural gas or LP propane fuel fired appliances or mechanical
equipment?
5. Doesthe ownerintend the structureto have anyfloor, wall, orceíling insulation installed? lf so, provide list
of insulation materials and R-values.
Any support you can offer on questions L-5 are greatly appreciated as the responses wíll help me in decision
how the remainder of the FIELD and OFFICE COPY are stamped and redlined. I do not wish to add conditions
or requirements that pose a conflict or confusion for the builder and/or building inspectors during
constructíon. Confirmation now before release will prove useful.
Colleen W¡rth
PIans Examiner
Garfield County Building Division
1"08 8th Street, Suite 401-
Glenwood Spríngs, CO 81601
cwi rth @ ga rf i el d -cou ntv. com
offíce (970) 945-1377 ext. 1610
5