Tuesday, July 12,20221:49 PM
Tyler Mize
Colleen Wirth
[External] RE: BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW
25'16-001.pdf
Colleen:
Please find attached a letter confirming that the roof snow load used in the design of this project is 40 psf
Let me know if there are addítional questions.
Thanks
Karl.
Karl Lernpneneso F"E-
V, F" [ngineerirag
üeary Euüldling Corp"
(6CI81 84s-970O
From: Tyler Mize <TMize@clearybuildíng.com>
Sent: Tuesday, July L2,2A22 1:L8 PM
To: Karl H. Lem menes <KLem menes@clearybuilding.com>
Subject: Fw: BLRE-06-22-7588 - new ríding arena blueprints are now UNDER RËVIEW
Please see email below. The county wants clarífication on the snow load for this buílding. Could you respond
to them today? This is for
Tyler Mize
Branch Manager
Cleary Building Corp.
P ho ne:O ff i ee-9 7 A -87 4 -tO66I Ce I I : 97 A'8!2-f-91I
2A22100950 - Erected - DUBOIS, DONNA/W¡LLIAM
www.clea rybu ild i ne.com
AEÏ
BUILDING CORP.
SEFVING ÜUH CLIENTS SINCË 1978
From: Col leen Wirth < cwírth @ gâ rfield-cou ntv.com>
Sent: Monday, July'J"1, 2022 2:46:52 PM
To: Tyler Mize; ham.d8@hotmail.com
Subject: [External] BLRE-06-22-7588 - new riding arena blueprínts are now UNDER REVIEW
BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW
Courtesy message for William DuBois and Tyler Mize, Cleary Building Corp
l've started the architectural and structural review of the riding arena building proposed at 456 Mid Valley Dr
in New Castle.
Need some help answering a few questions:
L What is the proposed arena's actual site elevation?
2. Could the Structural Engineer of Record with Cleary Building Corp forward an email response affirming
the roof snowload design measured from the Roof = Pf, not ground Pg?
When reading through the truss shop stamp detaíls and general specificatíon notes I see some conflictíng
information on values for the designed Roof snowload Pf. Garfield County jurisdiction has adopted a
local minimum required Roof snowload Pf = 40 PSF. Please confirm in writing to cwirth@earfield-
county.com
3. As this is a uniquely large structure, I am responsible to verify the building occupancy and use(s)
comply with Garfíeld County's adopted land use regulations and zoning requirements for the lot
location.
3.a. ls the proposed arena & stall barn intended exclusively for prívate use by the property owners and
residential occupants for the property?
3.b. ls this ís commercial barn structure intended for use by paying clients, customers, employees and/or
members of the general public? lf so, please explain (as this will help determine whether the building is
reviewed under the adopted 2At5lBC or the 2015 lRÇ as an accessory structure).
4. Request to confirm the current building structure will remain unheated with no septic system, leach
field, no finished plumbing fixtures and no wood, natural gas or LP propane fuel fired appliances or
mechanical equÍpment?
5. Does the owner Íntend the structure to have any floor, wall, or ceiling insulation installed? lf so, provide
list of insulation materíals and R-values.
2
Any support you can offer on questions 1-5 are greatly apprecíated as the responses will help me in
decision how the remainder of the FIELD and OFFICE COPY are stamped and redlined. I do not wish to add
conditions or requirements that pose a conflict or confusion for the buílder andlor building inspectors
during construction. Confirmation now before release will prove useful.
Colleen Wirth
Plans Examiner
Garfield County Buildíng Division
l-08 8th Street, Suite 40L
Glenwood Spríngs, CO 81601