Loading...
HomeMy WebLinkAboutCorrespondence Regarding Permit ClarificationColleen Wirth From: Sent: To: Cc: Subject: Attachments: Karl H. Lemmenes <KLemmenes@clearybuilding.com> Tuesday, July 12,20221:49 PM Tyler Mize Colleen Wirth [External] RE: BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW 25'16-001.pdf Colleen: Please find attached a letter confirming that the roof snow load used in the design of this project is 40 psf Let me know if there are addítional questions. Thanks Karl. Karl Lernpneneso F"E- V, F" [ngineerirag üeary Euüldling Corp" (6CI81 84s-970O From: Tyler Mize <TMize@clearybuildíng.com> Sent: Tuesday, July L2,2A22 1:L8 PM To: Karl H. Lem menes <KLem menes@clearybuilding.com> Subject: Fw: BLRE-06-22-7588 - new ríding arena blueprints are now UNDER RËVIEW Please see email below. The county wants clarífication on the snow load for this buílding. Could you respond to them today? This is for Tyler Mize Branch Manager Cleary Building Corp. P ho ne:O ff i ee-9 7 A -87 4 -tO66I Ce I I : 97 A'8!2-f-91I 2A22100950 - Erected - DUBOIS, DONNA/W¡LLIAM www.clea rybu ild i ne.com AEÏ BUILDING CORP. SEFVING ÜUH CLIENTS SINCË 1978 From: Col leen Wirth < cwírth @ gâ rfield-cou ntv.com> Sent: Monday, July'J"1, 2022 2:46:52 PM To: Tyler Mize; ham.d8@hotmail.com Subject: [External] BLRE-06-22-7588 - new riding arena blueprínts are now UNDER REVIEW BLRE-06-22-7588 - new riding arena blueprints are now UNDER REVIEW Courtesy message for William DuBois and Tyler Mize, Cleary Building Corp l've started the architectural and structural review of the riding arena building proposed at 456 Mid Valley Dr in New Castle. Need some help answering a few questions: L What is the proposed arena's actual site elevation? 2. Could the Structural Engineer of Record with Cleary Building Corp forward an email response affirming the roof snowload design measured from the Roof = Pf, not ground Pg? When reading through the truss shop stamp detaíls and general specificatíon notes I see some conflictíng information on values for the designed Roof snowload Pf. Garfield County jurisdiction has adopted a local minimum required Roof snowload Pf = 40 PSF. Please confirm in writing to cwirth@earfield- county.com 3. As this is a uniquely large structure, I am responsible to verify the building occupancy and use(s) comply with Garfíeld County's adopted land use regulations and zoning requirements for the lot location. 3.a. ls the proposed arena & stall barn intended exclusively for prívate use by the property owners and residential occupants for the property? 3.b. ls this ís commercial barn structure intended for use by paying clients, customers, employees and/or members of the general public? lf so, please explain (as this will help determine whether the building is reviewed under the adopted 2At5lBC or the 2015 lRÇ as an accessory structure). 4. Request to confirm the current building structure will remain unheated with no septic system, leach field, no finished plumbing fixtures and no wood, natural gas or LP propane fuel fired appliances or mechanical equÍpment? 5. Does the owner Íntend the structure to have any floor, wall, or ceiling insulation installed? lf so, provide list of insulation materíals and R-values. 2 Any support you can offer on questions 1-5 are greatly apprecíated as the responses will help me in decision how the remainder of the FIELD and OFFICE COPY are stamped and redlined. I do not wish to add conditions or requirements that pose a conflict or confusion for the buílder andlor building inspectors during construction. Confirmation now before release will prove useful. Colleen Wirth Plans Examiner Garfield County Buildíng Division l-08 8th Street, Suite 40L Glenwood Spríngs, CO 81601 cwí rth (ô ga rf iel d -cou ntv. co m office (970) 945-L377 ext. 1610 3