HomeMy WebLinkAboutConditions of PermitCOND ITIONS OF PE RMIT
BLCO -06-22-7579
Caerus Piceance LLC
New Air Skid @ M23 496 CDP - Parachute
SE, SW1 /4 of Sec 23, T.4S, R.9óW
1) ALL WORK SHALL COMply W|TH THE 2015 INTERNATIONAL BUILDING CODE {l.B.C.) AND
MAN U FACTU RER'S I NSTALLATION I NSTRUCTIONS.
2) ALL WORK MUST COMply W|TH CONDITIONS OF THE CURRENT LAND USE PERMIT.
3) ALL WORK MUST COMPLY WITH STATE AND FEDERAL REGULATIONS.
4) LOCKS, LATCHES AND LANDINGS SHALL COMPLY WITH 20',15 lBC, SECTION 1008
5) CONTRACTOR TO VER|Fy CDOH CERTIFICATION PRIOR TO SCHEDULING BUILDING FINAL
INSPECTION
ó) PROPOSED IMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED IN ÏHE
ATTACHED "GARFI ELD COU NTY BU I LD ING REOU I REM ENTS". NU M BER REFERENCES
NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LISÏ.
7) ELECTRTCAL pERMtTTtNc AND TNSPECTIONS BY COLORADO STATE ELECTRIC BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REOUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REOUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
B) LtcHT AND VENTTLATTON pER 2015 tBC, CHAPTER 12 AND 2015 IMC CHAPTER 3-4
9) HtcH STRENGTH BOLTtNc / FTELD WELDTNG (lF ANY PERTAINS), SHALL BE REOUIRED BY
SPECIAL INSPECTOR. COPY OF SPECIAL INSPECTOR REPORT TO BE AVAILABLE FOR
BUILDING FINAL
10) GARFIELD COUNTY FINAL / COMPLETION INSPECTION lS REOUIRED.